W DOC AIRBUS | AMM A320F

Installation of the MLG Disconnection Box


TASK 32-11-46-400-001-A
Installation of the MLG Disconnection Box


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
SAFETY BARRIER(S)
No specific
1
WARNING NOTICE(S)
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05BAB1)
Threadlocking Adhesive-- Low strength Low viscosity -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.12ACB1)
Corrosion Preventive Compound-Heavy Duty Hard Film -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 32-00-00-481-001-A
Installation of the Safety Devices on the Landing Gears
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
TASK 32-42-00-710-001-A
Operational Check of the Normal Braking System
TASK 32-42-00-720-002-A
Functional Test of the Tachometers and the Anti-Skid System with the Normal Braking System ON
TASK 32-47-00-710-001-A
Operational Test of the Brake Temperature System
TASK 32-48-00-710-001-A
Functional Test of The Brake Cooling System
TASK 32-69-00-740-001-A
BITE Check of Landing-Gear Control Interface-Unit (LGCIU) With Use of MCDU to Ensure that Continuous BITE is Operative
TASK 57-51-42-000-001-A
Removal of the Overwing Panel Protection
TASK 57-51-42-400-001-A
Installation of the Overwing Panel Protection
F MLG Disconnection Box ** ON A/C NOT FOR ALL
F MLG Disconnection Box ** ON A/C NOT FOR ALL
F MLG Disconnection Box ** ON A/C NOT FOR ALL
F MLG Disconnection Box ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 32-11-46-941-051-A
A. Safety Precautions
   (1) Make sure that the SAFETY BARRIER(S) are in position.
   (2) Make sure that the ground safety locks are on the landing gear (Ref. AMM TASK 32-00-00-481-001).
   (3) On panel 400VU:
  • Make sure that the landing-gear control-lever 6GA is in the DOWN position
  • Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the landing gear.
Subtask 32-11-46-860-050-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Make sure that the ACCESS PLATFORM 2M (6 FT) is below the applicable zone 730 or 740.
   (2) Make sure that the MLG door is open (Ref. AMM TASK 32-12-00-010-001).
   (3) Make sure that the 460005835 SLEEVE - GROUND LOCK is on the applicable MLG door actuator.
Subtask 32-11-46-860-050-B ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Make sure that the ACCESS PLATFORM 2M (6 FT) is below the applicable zone 730 or 740.
   (2) Make sure that the MLG door is open (Ref. AMM TASK 32-12-00-010-001).
   (3) Make sure that the 460005835 SLEEVE - GROUND LOCK is on the applicable MLG door actuator.
   (4) Make sure that the overwing panel protection is removed (Ref. AMM TASK 57-51-42-000-001).
Subtask 32-11-46-865-051-A
WARNING: OPEN CIRCUIT BREAKERS 1JH, 2JH1, 2JH2, 3JH1 AND 3JH2 (ENGINE 1 AND 2 IGNITION SYSTEMS). THEN OPEN CIRCUIT BREAKERS 2KS1 AND 2KS2 (FADEC A AND EIU 1 AND 2) AND 4KS1 (FADEC B AND EIU 1). IF YOU DO NOT OBEY THIS SEQUENCE, THE ENGINE AUTOMATIC IGNITION- SYSTEM WILL OPERATE. THIS CAN CAUSE INJURY TO MAINTENANCE PERSONNEL.
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUL/G/Y BRK/PRESS/IND61GGC10
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 1/CTL3HA1D12
49VUAIR BLEED/ENG 1/MONG2HA1D11
** ON A/C NOT FOR ALL
49VUFUEL/XFR VALVE1/WING/R2QPA11
49VUFUEL/XFR VALVE1/WING/L1QPA10
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB07
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB06
** ON A/C ALL
49VUFUEL/X FEED/VALVE/MOT12QEA12
49VUENGINE/2/FADEC A/AND EIU 22KS2A05
49VUENGINE/1/FADEC A/AND EIU 12KS1A04
49VUENGINE/1 AND 2/IGN/SYS A1JHA03
49VUHYD/FIRE VALVE/Y/ENG23702GDC14
49VUHYD/FIRE VALVE/G/ENG11703GKC13
49VUL/G/LGCIU/SYS1/NORM1GAC09
49VUSDAC/1/SPLY3WVF04
** ON A/C NOT FOR ALL
49VUABCU &/Y BRK/PRESS IND61GGC10
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 1/CTL2HA1D11
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB02
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB01
** ON A/C NOT FOR ALL
121VUENGINE/IGN/ENG2/SYS A BAT2JH2P40
121VUENGINE/IGN/ENG1/SYS A BAT2JH1P39
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE2Q42
** ON A/C NOT FOR ALL
121VUFUEL/RFL/DFL/SPLY2QUL24
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q43
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q41
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R41
121VULGCIU/BAT SPLY/SYS259GAR33
121VULGCIU/BAT SPLY/SYS158GAR32
** ON A/C ALL
121VUHYDRAULIC/BRK/TEMP/DET/UNIT1GWM37
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/SPLY4GGM36
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/CTL3GGM35
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/CTL1GGM34
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY2GGM33
121VUHYDRAULIC/PARK BRK/CTL/STBY71GGN37
121VUHYDRAULIC/PARK BRK/CTL/NORM70GGN36
121VUENGINE/IGN/ENG2/SYS B3JH2P42
121VUENGINE/IGN/ENG1/SYS B3JH1P41
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
** ON A/C NOT FOR ALL
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE2Q42
** ON A/C NOT FOR ALL
121VUHYDRAULIC/BRK FAN/WHEELS/3 AND 42GSL35
121VUHYDRAULIC/BRK FAN/WHEELS/1 AND 21GSL32
121VUHYDRAULIC/BRK/FAN/CTL3GSM32
** ON A/C NOT FOR ALL
121VUFUEL/RFL/DFL/SPLY2QUL23
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE1Q43
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q42
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE2Q41
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q40
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R40
121VULGCIU/BAT SPLY/SYS259GAR32
121VULGCIU/BAT SPLY/SYS158GAR31
** ON A/C ALL
122VULIGHTING/LANDING LT/R/CTL4LBT07
122VULIGHTING/LANDING LT/R/SPLY2LBT06
122VULIGHTING/LANDING LT/L/CTL3LBT05
122VULIGHTING/LANDING LT/L/SPLY1LBT04
** ON A/C NOT FOR ALL
122VUAIR BLEED/ENG 1/MONG3HA1Z23
4. Procedure
Subtask 32-11-46-420-052-A
A. Preparation for Installation
   (1) Do an inspection of the component interfaces and the adjacent area.
   (2) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Make sure that all the electrical connections are clean and in the correct condition.
Subtask 32-11-46-420-051-C ** ON A/C NOT FOR ALL
B. Installation of the MLG Disconnection Box
   (1) Put the MLG disconnection box (16) between the mid and aft beams of the overwing panel Z571 (Z671). Install the MLG disconnection box (16) with the screws (2) (Ref. AMM TASK 20-28-00-912-802).
   (2) Carefully move the electrical connections (7), (8) and (12) into their slots in the MLG disconnection box (16).
   (3) Remove the CAP - BLANKING from the electrical connectors.
   (4) Install the electrical receptacle 4027VC (4028VC) into its retaining plate.
   (5) Connect the electrical connector (3) to 4027VC (4028VC) and make sure that the route of the cable (13) is correct. Put the cleat (15) in position and install the screw (14).
   (6) Tighten the electrical connections (7), (8) and (12).
   (7) Apply Threadlocking Adhesive-- Low strength Low viscosity - (Material No.05BAB1) to the electrical connectors (3), (7), (8) and (12).
   (8) Clean the electrical connectors (3), (7), (8) and (12) with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (9) Apply a continuous layer of Corrosion Preventive Compound-Heavy Duty Hard Film - (Material No.12ACB1) to the electrical connectors (3), (7), (8) and (12).
   (10) Connect the bonding straps (10) and install the screws (5) and (6) (Ref. AMM TASK 20-28-00-912-802).
   (11) Put the clips (11) in position and install the screws (9).
   (12) Put the lid (4) in position and install the screws (1).
Subtask 32-11-46-420-051-D ** ON A/C NOT FOR ALL
B. Installation of the MLG Disconnection Box
   (1) Put the MLG disconnection box (16) between the mid and aft beams of the overwing panel Z571(Z671). Install the MLG disconnection box (16) with the screws (2) (Ref. AMM TASK 20-28-00-912-802).
   (2) Carefully move the electrical connections (7), (8) and (12) into their slots in the MLG disconnection box (16).
   (3) Remove the CAP - BLANKING from the electrical connectors.
   (4) Install the electrical receptacle 4027VC (4028VC) into its retaining plate.
   (5) Install the electrical receptacle 4031VC (4032VC) into its retaining plate.
   (6) Connect the electrical plug (3) to 4027VC (4028VC) and make sure that the route of the cable (13) is correct. Put the cleat (15) in position and install the screw (14).
   (7) Tighten the electrical connectors (7), (8) and (12).
   (8) Apply Threadlocking Adhesive-- Low strength Low viscosity - (Material No.05BAB1) to the electrical connectors (3), (7), (8) and (12).
   (9) Clean the electrical connectors (3), (7), (8) and (12) with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (10) Apply a continuous layer of Corrosion Preventive Compound-Heavy Duty Hard Film - (Material No.12ACB1) to the electrical connectors (3), (7), (8) and (12).
   (11) Connect the bonding straps (10) and install the screws (5) and (6) (Ref. AMM TASK 20-28-00-912-802).
   (12) Put the clips (11) in position and install the screws (9).
   (13) Put the lid (4) in position and install the screws (1).
Subtask 32-11-46-865-052-A
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUL/G/Y BRK/PRESS/IND61GGC10
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 1/CTL3HA1D12
49VUAIR BLEED/ENG 1/MONG2HA1D11
** ON A/C NOT FOR ALL
49VUFUEL/XFR VALVE1/WING/R2QPA11
49VUFUEL/XFR VALVE1/WING/L1QPA10
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB07
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB06
** ON A/C ALL
49VUFUEL/X FEED/VALVE/MOT12QEA12
49VUENGINE/2/FADEC A/AND EIU 22KS2A05
49VUENGINE/1/FADEC A/AND EIU 12KS1A04
49VUENGINE/1 AND 2/IGN/SYS A1JHA03
49VUHYD/FIRE VALVE/Y/ENG23702GDC14
49VUHYD/FIRE VALVE/G/ENG11703GKC13
49VUL/G/LGCIU/SYS1/NORM1GAC09
49VUSDAC/1/SPLY3WVF04
** ON A/C NOT FOR ALL
49VUABCU &/Y BRK/PRESS IND61GGC10
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 1/CTL2HA1D11
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB02
49VUFLIGHT CONTROLS/SLT/CTL AND MONG/SYS15CVB01
** ON A/C NOT FOR ALL
121VUENGINE/IGN/ENG2/SYS A BAT2JH2P40
121VUENGINE/IGN/ENG1/SYS A BAT2JH1P39
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE2Q42
** ON A/C NOT FOR ALL
121VUFUEL/RFL/DFL/SPLY2QUL24
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q43
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q41
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R41
121VULGCIU/BAT SPLY/SYS259GAR33
121VULGCIU/BAT SPLY/SYS158GAR32
** ON A/C ALL
121VUHYDRAULIC/BRK/TEMP/DET/UNIT1GWM37
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/SPLY4GGM36
121VUHYDRAULIC/BRAKING AND STEERING/SYS2/CTL3GGM35
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/CTL1GGM34
121VUHYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY2GGM33
121VUHYDRAULIC/PARK BRK/CTL/STBY71GGN37
121VUHYDRAULIC/PARK BRK/CTL/NORM70GGN36
121VUENGINE/IGN/ENG2/SYS B3JH2P42
121VUENGINE/IGN/ENG1/SYS B3JH1P41
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
** ON A/C NOT FOR ALL
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE1Q44
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE2Q42
** ON A/C NOT FOR ALL
121VUHYDRAULIC/BRK FAN/WHEELS/3 AND 42GSL35
121VUHYDRAULIC/BRK FAN/WHEELS/1 AND 21GSL32
121VUHYDRAULIC/BRK/FAN/CTL3GSM32
** ON A/C NOT FOR ALL
121VUFUEL/RFL/DFL/SPLY2QUL23
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B2WE1Q43
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q42
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B2WE2Q41
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A1WE2Q40
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R40
121VULGCIU/BAT SPLY/SYS259GAR32
121VULGCIU/BAT SPLY/SYS158GAR31
** ON A/C ALL
122VULIGHTING/LANDING LT/R/CTL4LBT07
122VULIGHTING/LANDING LT/R/SPLY2LBT06
122VULIGHTING/LANDING LT/L/CTL3LBT05
122VULIGHTING/LANDING LT/L/SPLY1LBT04
** ON A/C NOT FOR ALL
122VUAIR BLEED/ENG 1/MONG3HA1Z23
Subtask 32-11-46-720-050-A
D. Test
CAUTION: DURING THE FUNCTIONAL TEST OF THE TACHOMETERS, MAKE SURE THAT THE OPERATION OF THE BRAKE PISTONS IS CORRECT AND AGREES WITH EACH STEP GIVEN IN THIS TEST: INCORRECT OPERATION OF THE BRAKE PISTONS CAN BE CAUSED BY A BAD OR A CROSSED CONNECTION OF THE TACHOMETERS DURING INSTALLATION, AND CAN CAUSE UNSATISFACTORY BRAKING AND/OR A TIRE BURST DURING AIRCRAFT OPERATION.
   (1) Do a functional test of the tachometer system (Ref. AMM TASK 32-42-00-720-002).
Subtask 32-11-46-740-050-A
E. Test
   (1) Do a BITE test of the MLG system (Ref. AMM TASK 32-69-00-740-001).
Subtask 32-11-46-710-050-B ** ON A/C NOT FOR ALL
F. Test
   (1) Do an operational test of the brake temperature system (Ref. AMM TASK 32-47-00-710-001).
   (2) Do an operational test of the normal brake system (Ref. AMM TASK 32-42-00-710-001).
Subtask 32-11-46-710-050-D ** ON A/C NOT FOR ALL
F. Test
   (1) Do an operational test of the brake cooling system (Ref. AMM TASK 32-48-00-710-001).
   (2) Do an operational test of the brake temperature system (Ref. AMM TASK 32-47-00-710-001).
   (3) Do an operational test of the normal brake system (Ref. AMM TASK 32-42-00-710-001).
5. Close-up
Subtask 32-11-46-862-050-A
A. Aircraft Maintenance Configuration
   (1) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
Subtask 32-11-46-410-052-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the applicable MLG door (Ref. AMM TASK 32-12-00-410-001).
Subtask 32-11-46-410-052-B ** ON A/C NOT FOR ALL
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the overwing panel protection (Ref. AMM TASK 57-51-42-400-001).
   (3) Close the applicable MLG door (Ref. AMM TASK 32-12-00-410-001).
Subtask 32-11-46-942-051-A
C. Removal of Equipment
   (1) Remove the SAFETY BARRIER(S).
   (2) Remove the WARNING NOTICE(S).
   (3) Remove the ground support and maintenance equipment, the special and standard tools and all other items.