Operational Test of the Automatic Call-Out
TASK 31-50-00-710-006-A
Operational Test of the Automatic Call-Out
To make sure that the operation and the inhibition of the announcements are correct.
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 31-50-00-860-060-B
Subtask 31-50-00-710-085-A
Subtask 31-50-00-860-061-B
[Rev.10 from 2021]
2026.04.01 00:37:16 UTC
Operational Test of the Automatic Call-Out
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
ZONE: 210
1. Reason for the JobTo make sure that the operation and the inhibition of the announcements are correct.
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-010-A | Procedure to Get Access to the SYSTEM REPORT/TEST NAV Page |
| TASK 31-50-00-740-002-A | Read and Decode the Hardware Pin Programming of the SDAC and FWC |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 34-10-00-860-002-A | ADIRS Start Procedure |
| TASK 34-10-00-860-005-A | ADIRS Stop Procedure |
| ASM 315201 |
Subtask 31-50-00-860-060-B
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (PFDs only) (Ref. AMM TASK 31-60-00-860-001).
(3) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(4) On the panel 21VU, push the GPWS/SYS pushbutton switch (OFF legend on).
(5) On one MCDU, get the SYSTEM REPORT/TEST NAV menu page (Ref. AMM TASK 31-32-00-860-010).
Subtask 31-50-00-865-050-A (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (PFDs only) (Ref. AMM TASK 31-60-00-860-001).
(3) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(4) On the panel 21VU, push the GPWS/SYS pushbutton switch (OFF legend on).
(5) On one MCDU, get the SYSTEM REPORT/TEST NAV menu page (Ref. AMM TASK 31-32-00-860-010).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | COM NAV/RAD ALTM/2 | 1SA2 | K12 |
| 121VU | COM NAV/RAD ALTM/1 | 1SA1 | K11 |
Subtask 31-50-00-710-085-A
A. Check of the Automatic Call-Out Announcements Pin-Programmed in the FWCs
(2) Compare the pin programming related to the FWC1 (2) with the state of the aircraft pin programming given in the ASM ASM 315201.
Subtask 31-50-00-710-075-A NOTE: The Aircraft Schematic Manual (ASM) gives the auto call-out announcements pin-programmed in the FWCs ASM 315201. You can hear these announcements during A/C operation if their related pins are connected to the ground.
NOTE: During this test, you will not hear the MINIMUM and HUNDRED ABOVE call-outs (if the related FWC pins are grounded or not).
NOTE: You can do this procedure with the FWC1 or the FWC2.
This procedure is for the FWC1. For the FWC2, use the indications between the parentheses.
(1) Read the pin programming related to the FWC1 (2) (Ref. AMM TASK 31-50-00-740-002). This procedure is for the FWC1. For the FWC2, use the indications between the parentheses.
(2) Compare the pin programming related to the FWC1 (2) with the state of the aircraft pin programming given in the ASM ASM 315201.
B. Operational Test
Subtask 31-50-00-710-076-A | ACTION | RESULT |
|---|---|
| 1.On the center pedestal, on the MCDU, on the NAV menu page: | |
|
|
|
|
|
|
| 2.On the MCDU: | |
|
|
C. Inhibition in Climb Ramp (Take-off or Go-Around).
5. Close-up| ACTION | RESULT |
|---|---|
| 1.On the center pedestal, on the MCDU, on the NAV menu page: | |
|
|
|
|
|
|
| 2.On the MCDU: | |
| |
Subtask 31-50-00-860-061-B
A. Put the aircraft back to its initial configuration.
(1) Do the ADIRS stop procedure (Ref. AMM TASK 34-10-00-860-005).
(2) On the ECAM control panel, set the UPPER DISPLAY and LOWER DISPLAY potentiometers to OFF.
(3) On the panel 21VU, release the GPWS/SYS pushbutton switch.
(4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(5) Make sure that the work area is clean and clear of tools and other items.
(1) Do the ADIRS stop procedure (Ref. AMM TASK 34-10-00-860-005).
(2) On the ECAM control panel, set the UPPER DISPLAY and LOWER DISPLAY potentiometers to OFF.
(3) On the panel 21VU, release the GPWS/SYS pushbutton switch.
(4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(5) Make sure that the work area is clean and clear of tools and other items.