Operational Check of Recording Relay Logic
TASK 31-39-00-710-802-A
Operational Check of Recording Relay Logic
1. Reason for the Job
Refer to the MPD TASK: 313900-03
OPERATIONAL CHECK OF RECORDING RELAY LOGIC.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 31-39-00-860-050-A ** ON A/C NOT FOR ALL
Subtask 31-39-00-710-052-A ** ON A/C NOT FOR ALL
Subtask 31-39-00-860-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 08:40:06 UTC
Operational Check of Recording Relay Logic
1. Reason for the Job
Refer to the MPD TASK: 313900-03
OPERATIONAL CHECK OF RECORDING RELAY LOGIC.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 2 | HEADSET 600 OHMS |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 32-69-00-860-001-A | Simulation of Flight (With Aircraft on Ground) |
Subtask 31-39-00-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the engines shutdown occurred not less than 5 minutes before you do the procedure.
(3) Make sure that the PARK BRK control handle is in the ON position.
(4) Make sure that the aircraft is in the ground configuration (landing gear compressed).
(5) On maintenance panel 50VU, connect the HEADSET 600 OHMS to the CVR/HEAD SET connector.
(6) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only) (Ref. AMM TASK 31-60-00-860-001).
Subtask 31-39-00-865-055-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the engines shutdown occurred not less than 5 minutes before you do the procedure.
(3) Make sure that the PARK BRK control handle is in the ON position.
(4) Make sure that the aircraft is in the ground configuration (landing gear compressed).
(5) On maintenance panel 50VU, connect the HEADSET 600 OHMS to the CVR/HEAD SET connector.
(6) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only) (Ref. AMM TASK 31-60-00-860-001).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 31-39-00-865-067-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | ENGINE/2/FADEC A/AND EIU 2 | 2KS2 | A05 |
| 49VU | ENGINE/1/FADEC A/AND EIU 1 | 2KS1 | A04 |
| 49VU | RCDR1 CVR&FDR | 40TU | E14 |
| 49VU | RCDR CTL | 41TU | E13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | RCDR2 CVR&FDR | 42TU | K16 |
| 121VU | ENGINE/ENG2/FADEC B/AND EIU2 | 4KS2 | Q40 |
| 121VU | ENGINE/ENG1/FADEC B/AND EIU 1 | 4KS1 | R41 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | RCDR2 CVR&FDR | 42TU | K39 |
| 121VU | ENGINE/ENG2/FADEC B/AND EIU2 | 4KS2 | R41 |
| 121VU | ENGINE/ENG1/FADEC B/AND EIU 1 | 4KS1 | R40 |
C. Open, safety and tag these circuit breakers in this sequence:
Subtask 31-39-00-865-068-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 9DA1 (PROBEPITOT, 1) | |||
| 122VU | ANTI ICE/PROBES/1/TAT | 1DA1 | Z12 |
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| 49VU | ANTI ICE/PROBES/AOA/1 | 4DA1 | D04 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
| FOR FIN: 9DA2 (PROBEPITOT, 2) | |||
| 122VU | ANTI ICE/PROBES/2/TAT | 1DA2 | Y15 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/AOA | 4DA2 | Y13 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| FOR FIN: 9DA3 (PROBEPITOT, 3) | |||
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/AOA | 4DA3 | Z15 |
| 122VU | ANTI ICE/PROBES/3/STATIC | 5DA3 | Z14 |
D. Open, safety and tag these circuit breakers in this sequence:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 9DA1 (PROBEPITOT, 1) | |||
| 49VU | ANTI ICE/PROBES/PHC/1 | 2DA1 | D03 |
| FOR FIN: 9DA2 (PROBEPITOT, 2) | |||
| 122VU | ANTI ICE/PROBES/PHC/2 | 2DA2 | Y12 |
| FOR FIN: 9DA3 (PROBEPITOT, 3) | |||
| 122VU | ANTI ICE/PROBES/PHC/3 | 2DA3 | Y16 |
Subtask 31-39-00-710-052-A ** ON A/C NOT FOR ALL
A. Operational Check of the of Recording Relay Logic
Subtask 31-39-00-865-069-A ** ON A/C NOT FOR ALL | ACTION | RESULT |
1.On overhead control and indicating panel 21VU:
| On the RCDR/GND CTL pushbutton switch:
|
2.On the overhead panel, on panel 49VU:
| |
3.On the rear panel, on panel 121VU:
| |
NOTE: Engine 1 running is simulated. | On the RCDR/GND CTL pushbutton switch:
|
4.On the overhead panel, on panel 49VU:
| |
5.On the rear panel, on panel 121VU:
| |
NOTE: Engine 1 running simulation is stopped. | In the headset:
|
6.On overhead control and indicating panel 21VU:
| On the RCDR/GND CTL pushbutton switch:
|
7.On the overhead panel, on panel 49VU:
| |
8.On the rear panel, on panel 121VU:
| |
NOTE: Engine 2 running is simulated. | On the RCDR/GND CTL pushbutton switch:
|
9.On the overhead panel, on panel 49VU:
| |
10.On the rear panel, on panel 121VU:
| |
NOTE: Engine 2 running simulation is stopped. | In the headset:
|
11.On overhead control and indicating panel 21VU:
| On the RCDR/GND CTL pushbutton switch:
|
12.On the MCDU:
| On the RCDR/GND CTL pushbutton switch:
|
| In the headset:
|
13.On the ECAM:
| |
B. Remove the safety clips and tags and close these circuit breakers in this sequence:
Subtask 31-39-00-865-070-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 9DA1 (PROBEPITOT, 1) | |||
| 49VU | ANTI ICE/PROBES/PHC/1 | 2DA1 | D03 |
| FOR FIN: 9DA2 (PROBEPITOT, 2) | |||
| 122VU | ANTI ICE/PROBES/PHC/2 | 2DA2 | Y12 |
| FOR FIN: 9DA3 (PROBEPITOT, 3) | |||
| 122VU | ANTI ICE/PROBES/PHC/3 | 2DA3 | Y16 |
C. Remove the safety clips and tags and close these circuit breakers in this sequence:
5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 9DA1 (PROBEPITOT, 1) | |||
| 122VU | ANTI ICE/PROBES/1/TAT | 1DA1 | Z12 |
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| 49VU | ANTI ICE/PROBES/AOA/1 | 4DA1 | D04 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
| FOR FIN: 9DA2 (PROBEPITOT, 2) | |||
| 122VU | ANTI ICE/PROBES/2/TAT | 1DA2 | Y15 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/AOA | 4DA2 | Y13 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| FOR FIN: 9DA3 (PROBEPITOT, 3) | |||
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/AOA | 4DA3 | Z15 |
| 122VU | ANTI ICE/PROBES/3/STATIC | 5DA3 | Z14 |
Subtask 31-39-00-860-051-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(2) Disconnect the HEADSET 600 OHMS from the CVR/HEAD SET connector.
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(2) Disconnect the HEADSET 600 OHMS from the CVR/HEAD SET connector.
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).