Servicing of the LP-Filter
TASK 29-11-44-610-001-A
Servicing of the LP-Filter
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 29-11-44-860-050-A
Subtask 29-11-44-020-050-A
Subtask 29-11-44-860-052-A
[Rev.10 from 2021]
2026.04.01 04:43:48 UTC
Servicing of the LP-Filter
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT) |
| No specific | 1 | CONTAINER 3 L(3/4 USGAL) |
| No specific | 2 | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| No specific | lockwire 0.8 mm (0.032 in.) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 148 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 2 | O-RING | AIPC 29-13-44-01-020 |
| 4 | FILTER ELEMENT | AIPC 29-13-44-01-030 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-863-001-A | Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-11-00-710-001-A | Operational Test of the Green Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-860-002-A | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 29-23-00-864-001-A | Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
Subtask 29-11-44-860-050-A
A. Aircraft Maintenance Configuration
(2) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
(4) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(6) Disconnect the isolation coupling of the the power transfer unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(7) Put the ACCESS PLATFORM 3M (10 FT) in position.
(8) Put a CONTAINER 3 L(3/4 USGAL) below the filter to collect any hydraulic fluid.
4. ProcedureWARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Green hydraulic system.
(4) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(6) Disconnect the isolation coupling of the the power transfer unit (PTU) (Ref. AMM TASK 29-23-00-860-001).
(7) Put the ACCESS PLATFORM 3M (10 FT) in position.
(8) Put a CONTAINER 3 L(3/4 USGAL) below the filter to collect any hydraulic fluid.
Subtask 29-11-44-020-050-A
A. Removal of the Filter Element
(1) Cut and remove the lockwire between the filter bowl (3) and the filter head (1).
(2) Remove the filter bowl (3) together with the filter element (4).
(3) Remove the filter element (4) from the filter bowl (3).
(4) Discard the filter element (4).
Subtask 29-11-44-560-050-A (1) Cut and remove the lockwire between the filter bowl (3) and the filter head (1).
(2) Remove the filter bowl (3) together with the filter element (4).
(3) Remove the filter element (4) from the filter bowl (3).
(4) Discard the filter element (4).
NOTE: It is possible that the filter element (4) stays in the filter head (1). If it does, pull it out.
(5) Remove and discard the O-ring (2) from the outside of the filter bowl (3). B. Preparation for Installation
(1) Lubricate the new AIPC 29-13-44-01-020 O-RING (2) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) and install it on the filter bowl.
(2) Do a check of the correct condition and installation of the O-ring (6).
(4) Lubricate the threads of the filter bowl (3) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
(5) If the red clogging indicator (5) is out, push it in to set it again.
Subtask 29-11-44-420-050-A (1) Lubricate the new AIPC 29-13-44-01-020 O-RING (2) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) and install it on the filter bowl.
(2) Do a check of the correct condition and installation of the O-ring (6).
NOTE: The O-ring (6) is part of the filter element (4).
(3) Lubricate the O-ring (6) in the new AIPC 29-13-44-01-030 FILTER ELEMENT (4) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) . (4) Lubricate the threads of the filter bowl (3) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
(5) If the red clogging indicator (5) is out, push it in to set it again.
C. Installation of the Filter Element
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Do a check of the filter element (4) and make sure that it is clean and not damaged.
(4) Install the filter element (4) together with its O-ring (6) in the filter bowl (3).
(5) Engage the filter bowl (3) together with the new O-ring (2) in the filter head (1) and tighten it.
Subtask 29-11-44-790-050-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Do a check of the filter element (4) and make sure that it is clean and not damaged.
(4) Install the filter element (4) together with its O-ring (6) in the filter bowl (3).
(5) Engage the filter bowl (3) together with the new O-ring (2) in the filter head (1) and tighten it.
NOTE: Tighten the filter bowl (3) with your hands only.
D. Test of the Filter Assembly
(1) Remove the WARNING NOTICE(S).
(2) Pressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(3) Pressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-863-001), (Ref. AMM TASK 29-23-00-863-001) or (Ref. AMM TASK 29-11-00-710-001).
(4) Make sure that the clogging indicator stays in.
(5) Make sure that no hydraulic fluid comes out of the filter assembly.
(6) Make sure that the fluid level in the reservoir of the Green hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(7) Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001) or (Ref. AMM TASK 29-23-00-864-001).
5. Close-up(1) Remove the WARNING NOTICE(S).
(2) Pressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(3) Pressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-863-001), (Ref. AMM TASK 29-23-00-863-001) or (Ref. AMM TASK 29-11-00-710-001).
(4) Make sure that the clogging indicator stays in.
(5) Make sure that no hydraulic fluid comes out of the filter assembly.
(6) Make sure that the fluid level in the reservoir of the Green hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(7) Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001) or (Ref. AMM TASK 29-23-00-864-001).
Subtask 29-11-44-860-052-A
A. Put the aircraft back to the serviceable condition.
(1) Safety the filter bowl (3) to the filter head (1) with lockwire 0.8 mm (0.032 in.).
(2) Remove the container from below the filter.
(3) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(4) Remove the access platform(s).
(5) Make sure that the work area is clean and clear of tools and other items.
(6) Close the main door of the main gear (Ref. AMM TASK 32-12-00-410-001).
(1) Safety the filter bowl (3) to the filter head (1) with lockwire 0.8 mm (0.032 in.).
(2) Remove the container from below the filter.
(3) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(4) Remove the access platform(s).
(5) Make sure that the work area is clean and clear of tools and other items.
(6) Close the main door of the main gear (Ref. AMM TASK 32-12-00-410-001).
LP Filter