Operational Test of the Trimmable Horizontal Stabilizer Actuator with both (Green and Yellow) and Individual Hydraulic Systems
TASK 27-44-00-710-003-A
Operational Test of the Trimmable Horizontal Stabilizer Actuator with both (Green and Yellow) and Individual Hydraulic Systems
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 27-44-00-865-052-A
Subtask 27-44-00-710-056-A
Subtask 27-44-00-860-056-A
[Rev.10 from 2021]
2026.04.01 06:52:45 UTC
Operational Test of the Trimmable Horizontal Stabilizer Actuator with both (Green and Yellow) and Individual Hydraulic Systems
ZONE: 210
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 29-23-00-864-001-A | Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 27-44-00-865-052-A
A. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 27-44-00-860-055-B | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B11 |
| 49VU | FLIGHT CONTROLS/THS/ACTR/MOT2 | 19CE2 | B09 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B06 |
| 49VU | FLIGHT CONTROLS/THS/ACTR/MOT2 | 19CE2 | B04 |
| 49VU | FLIGHT CONTROLS/SEC1/NORM/SPLY | 21CE1 | B03 |
| ** ON A/C ALL | |||
| 105VU | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 | A02 |
| 105VU | FLT CTL/ELAC1/STBY SPLY | 16CE1 | A01 |
| 121VU | FLIGHT CONTROLS/SEC3/SPLY | 21CE3 | Q19 |
| 121VU | FLIGHT CONTROLS/SEC2/SPLY | 21CE2 | Q18 |
| 121VU | FLIGHT CONTROLS/THS ACTR/MOT3 | 19CE3 | Q17 |
| 121VU | FLIGHT CONTROLS/THS ACTR/MOT1 | 19CE1 | Q16 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Pressurize the Yellow and the Green hydraulic systems (Ref. AMM TASK 29-23-00-863-001).
(3) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(4) On the center pedestal on the ECAM control panel, push the F/CTL pushbutton switch.
(5) Make sure that on the lower display unit (DU) of the ECAM, the F/CTL page comes on.
4. Procedure(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Pressurize the Yellow and the Green hydraulic systems (Ref. AMM TASK 29-23-00-863-001).
(3) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(4) On the center pedestal on the ECAM control panel, push the F/CTL pushbutton switch.
(5) Make sure that on the lower display unit (DU) of the ECAM, the F/CTL page comes on.
Subtask 27-44-00-710-056-A
A. Do this test:
5. Close-up| ACTION | RESULT |
|---|---|
1.On the center pedestal:
| The THS moves to the nose fully down and then to the nose fully up position. On the F/CTL page of the lower ECAM DU:
|
2.On the maintenance panel 50VU:
| On the panel 50VU:
|
3.On the center pedestal:
| The THS does not move. On the F/CTL page of the lower ECAM DU:
|
4.On the maintenance panel 50VU:
| On the panel 50VU:
|
5.On the center pedestal:
| The THS moves to the nose fully down and then to the nose fully up position. On the F/CTL page of the lower ECAM DU:
|
6.On the panel 50VU:
| On the panel 50VU:
|
7.On the center pedestal:
| The THS moves to the fully nose down position and stop at the O position. On the lower ECAM DU, on the F/CTL page:
|
8.On the panel 50VU:
| On the panel 50VU:
|
Subtask 27-44-00-860-056-A
A. Put the aircraft back to the serviceable condition.
(1) Depressurize the Green and Yellow hydraulic systems.
(Ref. AMM TASK 29-23-00-864-001).
(2) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Depressurize the Green and Yellow hydraulic systems.
(Ref. AMM TASK 29-23-00-864-001).
(2) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).