Detailed Inspection of the Control Cables
TASK 27-21-00-210-002-A
Detailed Inspection of the Control Cables
Refer to the MPD TASK: 272100-02
DETAILED INSPECTION OF CONTROL CABLES
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 27-21-00-860-056-A
Subtask 27-21-00-210-051-A
Subtask 27-21-00-942-058-A
[Rev.10 from 2021]
2026.03.31 23:48:02 UTC
Detailed Inspection of the Control Cables
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
Refer to the MPD TASK: 272100-02
DETAILED INSPECTION OF CONTROL CABLES
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 130 | FWD CARGO COMPT AFT BULKHEAD OF AVNCS COMPT TO FWD PRESSURE BULKHEAD OF WING CENTER BOX |
| 150 | AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT |
| 160 | BULK CARGO COMPARTMENT AFT BULKHEAD OF AFT CARGO COMPARTMENT TO AFT BULKHEAD OF BULK CARGO COMPARTMENT |
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 220 | FWD CAB UTILITY AREAS |
| 230 | FWD PASSENGER COMPARTMENT |
| 240 | MID PASSENGER COMPARTMENT |
| 310 | FUSLG TAIL SECTION AFT OF AFT PRESS BHD |
| 312AR, 825, 826 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-24-11-100-001-A | Cleaning and Protection of the Cables |
| TASK 20-24-12-200-001-A | Check of the Control Cables |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-54-12-000-001-A | Removal of the Forward Cargo-Compartment Partition |
| TASK 25-54-12-000-002-A | Removal of the Ceiling Panels in the Forward Cargo Compartment |
| TASK 25-54-12-400-001-A | Installation of the Forward Cargo-Compartment Partition |
| TASK 25-54-12-400-002-A | Installation of the Ceiling Panels in the Forward Cargo Compartment |
| TASK 25-55-11-000-002-A | Removal of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59 |
| TASK 25-55-11-400-002-A | Installation of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59 |
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-000-002-A | Removal of the Ceiling Panels in the Aft Cargo Compartment at FR59/FR65 |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-400-002-A | Installation of the Ceiling Panels in the Aft Cargo Compartment at FR59/FR65 |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-10-00-864-002-A | Depressurize the Yellow Hydraulic System |
| TASK 29-10-00-864-003-A | Depressurize the Blue Hydraulic System |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 53-12-11-000-001-A | Removal of the Cockpit Floor Panels from FR1 thru FR12 |
| TASK 53-12-11-400-001-A | Installation of the Cockpit Floor Panels from FR1 thru FR12 |
| TASK 53-12-12-000-001-A | Removal of the Cabin Floor Panels from FR12 thru FR24 |
| TASK 53-12-12-400-001-A | Installation of the Cabin Floor Panels from FR12 thru FR24 |
| TASK 53-22-12-000-001-A | Removal of the Cabin Floor Panels |
| TASK 53-22-12-400-001-A | Installation of the Cabin Floor Panels |
| TASK 53-32-12-000-002-A | Removal of the Cabin Floor Panels |
| TASK 53-32-12-400-002-A | Installation of the Cabin Floor Panels |
| TASK 06-41-53-00 | FUSELAGE-DESCRIPTION AND OPERATION |
Subtask 27-21-00-860-056-A
A. Aircraft Maintenance Configuration
(1) Energize the ground service network (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-10-00-864-001), (Ref. AMM TASK 29-10-00-864-002), (Ref. AMM TASK 29-10-00-864-003).
(3) Put the WARNING NOTICE(S) on the CAPT and F/O rudder pedals to tell persons not to operate them.
Subtask 27-21-00-010-072-A (1) Energize the ground service network (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-10-00-864-001), (Ref. AMM TASK 29-10-00-864-002), (Ref. AMM TASK 29-10-00-864-003).
(3) Put the WARNING NOTICE(S) on the CAPT and F/O rudder pedals to tell persons not to operate them.
B. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at zone 132.
(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at zone 154.
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at zone 312.
(4) Open access doors 825 and 826 (Ref. AMM TASK 52-30-00-860-001).
(5) Open access door 312AR.
(6) Remove the panels that follow:
(a) In zones 211 and 221:
1 If necessary, remove the floor panels between FR8 and FR12 (Ref. AMM TASK 53-12-11-000-001) and (Ref. AMM D/O 06-41-53-00).
2 Remove the floor panels between FR12 and FR20 (Ref. AMM TASK 53-12-12-000-001) and (Ref. AMM D/O 06-41-53-00).
(b) In zones 231 and 241:
1 Remove the floor panels between FR20 and FR24 and between FR32 and FR47 (Ref. AMM TASK 53-12-12-000-001), (Ref. AMM TASK 53-22-12-000-001), (Ref. AMM TASK 53-32-12-000-002) and (Ref. AMM D/O 06-41-53-00).
(c) In zone 131:
1 Remove the ceiling panels between FR24 and FR35 (Ref. AMM TASK 25-54-12-000-002) and (Ref. AMM D/O 06-41-53-00).
2 Remove the forward cargo-compartment partition (Ref. AMM TASK 25-54-12-000-001) and (Ref. AMM D/O 06-41-53-00).
(d) In zone 151 and 161:
1 Remove the ceiling panels between FR47 and FR59 (Ref. AMM TASK 25-55-11-000-002), (Ref. AMM TASK 25-55-12-000-002) and (Ref. AMM D/O 06-41-53-00).
(e) In zone 161:
1 Remove the aft cargo-compartment partition (Ref. AMM TASK 25-55-12-000-001) and (Ref. AMM D/O 06-41-53-00).
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at zone 132.
(2) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at zone 154.
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at zone 312.
(4) Open access doors 825 and 826 (Ref. AMM TASK 52-30-00-860-001).
(5) Open access door 312AR.
(6) Remove the panels that follow:
(a) In zones 211 and 221:
1 If necessary, remove the floor panels between FR8 and FR12 (Ref. AMM TASK 53-12-11-000-001) and (Ref. AMM D/O 06-41-53-00).
2 Remove the floor panels between FR12 and FR20 (Ref. AMM TASK 53-12-12-000-001) and (Ref. AMM D/O 06-41-53-00).
(b) In zones 231 and 241:
1 Remove the floor panels between FR20 and FR24 and between FR32 and FR47 (Ref. AMM TASK 53-12-12-000-001), (Ref. AMM TASK 53-22-12-000-001), (Ref. AMM TASK 53-32-12-000-002) and (Ref. AMM D/O 06-41-53-00).
(c) In zone 131:
1 Remove the ceiling panels between FR24 and FR35 (Ref. AMM TASK 25-54-12-000-002) and (Ref. AMM D/O 06-41-53-00).
2 Remove the forward cargo-compartment partition (Ref. AMM TASK 25-54-12-000-001) and (Ref. AMM D/O 06-41-53-00).
(d) In zone 151 and 161:
1 Remove the ceiling panels between FR47 and FR59 (Ref. AMM TASK 25-55-11-000-002), (Ref. AMM TASK 25-55-12-000-002) and (Ref. AMM D/O 06-41-53-00).
(e) In zone 161:
1 Remove the aft cargo-compartment partition (Ref. AMM TASK 25-55-12-000-001) and (Ref. AMM D/O 06-41-53-00).
Subtask 27-21-00-210-051-A
A. Detailed Inspection of the Control Cables
(1) Make sure that the fairleads are in the correct condition.
(2) At FR70, make sure that the pressure seals (3) are correctly installed and in the correct condition.
(3) Make sure that the turnbuckles (1) are safetied with the lock clips (2).
(4) Do a detailed inspection of the cables:
(a) Do a visual inspection of the cables to make sure that there are no broken wires.
(6) Make sure that the linkage can move freely and does not touch or rub against:
5. Close-up(1) Make sure that the fairleads are in the correct condition.
(2) At FR70, make sure that the pressure seals (3) are correctly installed and in the correct condition.
(3) Make sure that the turnbuckles (1) are safetied with the lock clips (2).
(4) Do a detailed inspection of the cables:
(a) Do a visual inspection of the cables to make sure that there are no broken wires.
NOTE: The very important areas where the wires can break along the length of the cables that:
1 Examine the lengths of the cables that:- Go through the fairleads and the pressure seals
- Go around the pulleys, the tension regulator and the quadrant.
- Go through the fairleads and the pressure seals
- Go around the pulleys, the tension regulator and the quadrant.
- Move the Textile-Lint free Cotton - (Material No.14SBA1) along the cables, in the two directions.
- If the Textile-Lint free Cotton - (Material No.14SBA1) catches on the cables, do a detailed check of the control cables (Ref. AMM TASK 20-24-12-200-001).
NOTE: The very important areas where the cables can wear along the length of the cables that:
- Go through the fairleads and the pressure seals
- Go around the pulleys, the tension regulator and the quadrant.
- If you find cable wear, do a detailed check of the control cables (Ref. AMM TASK 20-24-12-200-001).
NOTE: The corrosion of cables frequently occurs in:
- The battery compartments
- The toilets
- The landing gear wells
- Other areas where the fumes and the liquids (that can cause corrosion) can collect.
- If you find corrosion, do a detailed check of the control cables (Ref. AMM TASK 20-24-12-200-001).
(6) Make sure that the linkage can move freely and does not touch or rub against:
- The tubing
- The structures
- The electrical routing
- The adjacent controls.
Subtask 27-21-00-942-058-A
A. Make sure that the work area is clean and clear of tools and other items.
Subtask 27-21-00-410-066-A B. Close Access
(1) Install the panels that follow:
(a) In zones 211 and 221:
1 If necessary, install the floor panels between FR8 and FR12 (Ref. AMM TASK 53-12-11-400-001) and (Ref. AMM D/O 06-41-53-00).
2 Install the floor panels between FR12 and FR20 (Ref. AMM TASK 53-12-12-400-001) and (Ref. AMM D/O 06-41-53-00).
(b) In zones 231 and 241:
1 Install the floor panels between FR20 and FR24 and between FR32 and FR47 (Ref. AMM TASK 53-22-12-400-001), (Ref. AMM TASK 53-32-12-400-002) and (Ref. AMM D/O 06-41-53-00).
(c) In zone 131:
1 Install the ceiling panels between FR24 and FR35 (Ref. AMM TASK 25-54-12-400-002) and (Ref. AMM D/O 06-41-53-00).
2 Install the forward cargo-compartment partition (Ref. AMM TASK 25-54-12-400-001) and (Ref. AMM D/O 06-41-53-00).
(d) In zone 151 and 161:
1 Install the ceiling panels between FR47 and FR59 (Ref. AMM TASK 25-55-11-400-002), (Ref. AMM TASK 25-55-12-400-002) and (Ref. AMM D/O 06-41-53-00).
2 Install the aft cargo-compartment partition (Ref. AMM TASK 25-55-12-400-001) and (Ref. AMM D/O 06-41-53-00).
(2) Close access door 312AR.
(3) Close access doors 825 and 826 (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).
Subtask 27-21-00-860-057-A (1) Install the panels that follow:
(a) In zones 211 and 221:
1 If necessary, install the floor panels between FR8 and FR12 (Ref. AMM TASK 53-12-11-400-001) and (Ref. AMM D/O 06-41-53-00).
2 Install the floor panels between FR12 and FR20 (Ref. AMM TASK 53-12-12-400-001) and (Ref. AMM D/O 06-41-53-00).
(b) In zones 231 and 241:
1 Install the floor panels between FR20 and FR24 and between FR32 and FR47 (Ref. AMM TASK 53-22-12-400-001), (Ref. AMM TASK 53-32-12-400-002) and (Ref. AMM D/O 06-41-53-00).
(c) In zone 131:
1 Install the ceiling panels between FR24 and FR35 (Ref. AMM TASK 25-54-12-400-002) and (Ref. AMM D/O 06-41-53-00).
2 Install the forward cargo-compartment partition (Ref. AMM TASK 25-54-12-400-001) and (Ref. AMM D/O 06-41-53-00).
(d) In zone 151 and 161:
1 Install the ceiling panels between FR47 and FR59 (Ref. AMM TASK 25-55-11-400-002), (Ref. AMM TASK 25-55-12-400-002) and (Ref. AMM D/O 06-41-53-00).
2 Install the aft cargo-compartment partition (Ref. AMM TASK 25-55-12-400-001) and (Ref. AMM D/O 06-41-53-00).
(2) Close access door 312AR.
(3) Close access doors 825 and 826 (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).
C. Put the aircraft back to its initial configuration.
(1) Remove the WARNING NOTICE(S).
(2) De-energize the ground service network (Ref. AMM TASK 24-42-00-862-001).
(1) Remove the WARNING NOTICE(S).
(2) De-energize the ground service network (Ref. AMM TASK 24-42-00-862-001).
Rudder Mechanical Control-Cables