W DOC AIRBUS | AMM A320F

Installation of the Lavatory Smoke Detector


TASK 26-17-15-400-007-A
Installation of the Lavatory Smoke Detector


ZONE: 200
FIN: 14WQ ** ON A/C NOT FOR ALL
FIN: 15WQ ** ON A/C NOT FOR ALL
FIN: 4WQ ** ON A/C NOT FOR ALL
FIN: 5WQ ** ON A/C NOT FOR ALL
FIN: 6WQ ** ON A/C NOT FOR ALL
FIN: 8WQ ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 20-21-12-911-001-A
Tightening Torques for Pipe Unions (not for OXYGEN Unions)
TASK 23-73-00-740-005-A
BITE-Test of the Cabin Intercommunication Data System (CIDS) through the CFDS
TASK 23-73-00-740-005-B
Interface and Power-Up Test of the Cabin Intercommunication Data System (CIDS) through the CFDS
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 26-10-00-740-801-A
BITE Test of the Smoke Detection Function - System Test
TASK 26-17-00-710-001-A
Operational Test of the Lavatory Smoke-Detection System
3. Job Set-up
Subtask 26-17-15-860-058-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
   (2) Make sure that the aircraft is in the same configuration as for the removal task.
Subtask 26-17-15-875-051-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/SDCU/CHAN111WQC06
** ON A/C NOT FOR ALL
49VUCOM/CIDS/DEU B/ESS153RHG03
** ON A/C NOT FOR ALL
121VUCOM NAV/CIDS/DEU B/NORM162RHM08
** ON A/C NOT FOR ALL
121VUCOM NAV/CIDS/DEU B/NORM162RHM09
** ON A/C NOT FOR ALL
121VUCOM / CIDS / DEU B / NORM FWD193RHM09
** ON A/C NOT FOR ALL
121VUCOM/CIDS/DEU B/BAT143RHN12
** ON A/C NOT FOR ALL
122VUAIR COND/SDCU/CHAN212WQT18
** ON A/C NOT FOR ALL
2001VUCIDS-DEU B-NORM-AFT194RHC08
4. Procedure
Subtask 26-17-15-420-061-A ** ON A/C NOT FOR ALL
A. Installation of the Smoke Detector
F Smoke Detector ** ON A/C NOT FOR ALL
   (1) The procedure to install all the smoke detectors is the same. Thus, the procedure to install only one smoke detector is given here.
   (2) Make sure that the packing (6) is serviceable and in the satisfactory condition.
   (3) Carefully install the packing (6) with the smoke detector (5) on the air-extraction hood (8).
   (4) Install the screws (9), the washers (3) (if applicable) and the nuts (2).
   (5) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (6) Make sure that all the electrical connections are clean and in the correct condition.
   (7) Connect the electrical connector (4) to the smoke detector (5).
   (8) Connect the hose (15) to the air-extraction hood and tighten the clamp (14) (Ref. AMM TASK 20-21-12-911-001).
   (9) Carefully put the air extraction-hood (8) together with the smoke detector (5) in position on the ceiling panel (1) and install the screws (7).
Subtask 26-17-15-875-052-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/SDCU/CHAN111WQC06
** ON A/C NOT FOR ALL
49VUCOM/CIDS/DEU B/ESS153RHG03
** ON A/C NOT FOR ALL
121VUCOM NAV/CIDS/DEU B/NORM162RHM08
** ON A/C NOT FOR ALL
121VUCOM NAV/CIDS/DEU B/NORM162RHM09
** ON A/C NOT FOR ALL
121VUCOM / CIDS / DEU B / NORM FWD193RHM09
** ON A/C NOT FOR ALL
121VUCOM/CIDS/DEU B/BAT143RHN12
** ON A/C NOT FOR ALL
122VUAIR COND/SDCU/CHAN212WQT18
** ON A/C NOT FOR ALL
2001VUCIDS-DEU B-NORM-AFT194RHC08
Subtask 26-17-15-740-071-A ** ON A/C NOT FOR ALL
C. Interface and Power-Up Test of the Cabin Intercommunication Data System (CIDS)
   (1) Do the interface and power-up test of the CIDS through the centralized fault display-system (Ref. AMM TASK 23-73-00-740-005).
Subtask 26-17-15-740-072-A ** ON A/C NOT FOR ALL
D. BITE Test of the Smoke Detection Function (SDF)
   (1) Do the BITE test of the SDF (system test) (Ref. AMM TASK 26-10-00-740-801).
Subtask 26-17-15-710-058-A ** ON A/C NOT FOR ALL
E. Test of the Lavatory Smoke Detector
   (1) Do an operational test of the lavatory smoke-detection system (Ref. AMM TASK 26-17-00-710-001).
5. Close-up
Subtask 26-17-15-410-072-A ** ON A/C NOT FOR ALL
A. Close Access
F Smoke Detector ** ON A/C NOT FOR ALL
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Put the grill (13) and the air filter (12) into the air-extraction hood (8).
   (3) Install the air-extraction grill (10) on the air-extraction hood (8) with the screws (11).
Subtask 26-17-15-410-072-C ** ON A/C NOT FOR ALL
A. Close Access
F Smoke Detector ** ON A/C NOT FOR ALL
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Put the grille (14) and the air filter (13) into the air-extraction hood (9).
   (3) Install the air-extraction grille (11) on the air-extraction hood (9) with the screws (12).
   (4) Close the door of related lavatory (D, L or M).
Subtask 26-17-15-410-072-N ** ON A/C NOT FOR ALL
A. Close Access
F Smoke Detector ** ON A/C NOT FOR ALL
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Put the grille (13) and the air filter (12) into the air-extraction hood (8).
   (3) Install the air-extraction grille (10) on the air-extraction hood (8) with the screws (11).
   (4) Close the door of related lavatory (D or E).
Subtask 26-17-15-410-072-P ** ON A/C NOT FOR ALL
A. Close Access
F Smoke Detector ** ON A/C NOT FOR ALL
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Put the grille (13) and the air filter (12) into the air-extraction hood (8).
   (3) Install the air-extraction grille (10) on the air-extraction hood (8) with the screws (11).
   (4) Close the door of related lavatory (D, E or L).
Subtask 26-17-15-862-060-A ** ON A/C NOT FOR ALL
B. Put the aircraft back to its initial configuration.
   (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).