Installation of the Lavatory Smoke Detector
TASK 26-17-15-400-007-A
Installation of the Lavatory Smoke Detector
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 26-17-15-860-058-A ** ON A/C NOT FOR ALL
Subtask 26-17-15-420-061-A ** ON A/C NOT FOR ALL
Subtask 26-17-15-410-072-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:44:14 UTC
Installation of the Lavatory Smoke Detector
ZONE: 200
FIN: 14WQ ** ON A/C NOT FOR ALL
FIN: 15WQ ** ON A/C NOT FOR ALL
FIN: 4WQ ** ON A/C NOT FOR ALL
FIN: 5WQ ** ON A/C NOT FOR ALL
FIN: 6WQ ** ON A/C NOT FOR ALL
FIN: 8WQ ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 14WQ ** ON A/C NOT FOR ALL
FIN: 15WQ ** ON A/C NOT FOR ALL
FIN: 4WQ ** ON A/C NOT FOR ALL
FIN: 5WQ ** ON A/C NOT FOR ALL
FIN: 6WQ ** ON A/C NOT FOR ALL
FIN: 8WQ ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-21-12-911-001-A | Tightening Torques for Pipe Unions (not for OXYGEN Unions) |
| TASK 23-73-00-740-005-A | BITE-Test of the Cabin Intercommunication Data System (CIDS) through the CFDS |
| TASK 23-73-00-740-005-B | Interface and Power-Up Test of the Cabin Intercommunication Data System (CIDS) through the CFDS |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 26-10-00-740-801-A | BITE Test of the Smoke Detection Function - System Test |
| TASK 26-17-00-710-001-A | Operational Test of the Lavatory Smoke-Detection System |
Subtask 26-17-15-860-058-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the aircraft is in the same configuration as for the removal task.
Subtask 26-17-15-875-051-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the aircraft is in the same configuration as for the removal task.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/SDCU/CHAN1 | 11WQ | C06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CIDS/DEU B/ESS | 153RH | G03 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B/NORM | 162RH | M08 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B/NORM | 162RH | M09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM / CIDS / DEU B / NORM FWD | 193RH | M09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM/CIDS/DEU B/BAT | 143RH | N12 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/SDCU/CHAN2 | 12WQ | T18 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | CIDS-DEU B-NORM-AFT | 194RH | C08 |
Subtask 26-17-15-420-061-A ** ON A/C NOT FOR ALL
A. Installation of the Smoke Detector
(1) The procedure to install all the smoke detectors is the same. Thus, the procedure to install only one smoke detector is given here.
(2) Make sure that the packing (6) is serviceable and in the satisfactory condition.
(3) Carefully install the packing (6) with the smoke detector (5) on the air-extraction hood (8).
(4) Install the screws (9), the washers (3) (if applicable) and the nuts (2).
(5) Remove the CAP-BLANKING from each electrical connector and receptacle.
(6) Make sure that all the electrical connections are clean and in the correct condition.
(7) Connect the electrical connector (4) to the smoke detector (5).
(8) Connect the hose (15) to the air-extraction hood and tighten the clamp (14) (Ref. AMM TASK 20-21-12-911-001).
(9) Carefully put the air extraction-hood (8) together with the smoke detector (5) in position on the ceiling panel (1) and install the screws (7).
Subtask 26-17-15-875-052-A ** ON A/C NOT FOR ALL (1) The procedure to install all the smoke detectors is the same. Thus, the procedure to install only one smoke detector is given here.
(2) Make sure that the packing (6) is serviceable and in the satisfactory condition.
(3) Carefully install the packing (6) with the smoke detector (5) on the air-extraction hood (8).
(4) Install the screws (9), the washers (3) (if applicable) and the nuts (2).
(5) Remove the CAP-BLANKING from each electrical connector and receptacle.
(6) Make sure that all the electrical connections are clean and in the correct condition.
(7) Connect the electrical connector (4) to the smoke detector (5).
(8) Connect the hose (15) to the air-extraction hood and tighten the clamp (14) (Ref. AMM TASK 20-21-12-911-001).
(9) Carefully put the air extraction-hood (8) together with the smoke detector (5) in position on the ceiling panel (1) and install the screws (7).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 26-17-15-740-071-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/SDCU/CHAN1 | 11WQ | C06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CIDS/DEU B/ESS | 153RH | G03 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B/NORM | 162RH | M08 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B/NORM | 162RH | M09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM / CIDS / DEU B / NORM FWD | 193RH | M09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM/CIDS/DEU B/BAT | 143RH | N12 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/SDCU/CHAN2 | 12WQ | T18 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | CIDS-DEU B-NORM-AFT | 194RH | C08 |
C. Interface and Power-Up Test of the Cabin Intercommunication Data System (CIDS)
(1) Do the interface and power-up test of the CIDS through the centralized fault display-system (Ref. AMM TASK 23-73-00-740-005).
Subtask 26-17-15-740-072-A ** ON A/C NOT FOR ALL (1) Do the interface and power-up test of the CIDS through the centralized fault display-system (Ref. AMM TASK 23-73-00-740-005).
D. BITE Test of the Smoke Detection Function (SDF)
(1) Do the BITE test of the SDF (system test) (Ref. AMM TASK 26-10-00-740-801).
Subtask 26-17-15-710-058-A ** ON A/C NOT FOR ALL (1) Do the BITE test of the SDF (system test) (Ref. AMM TASK 26-10-00-740-801).
E. Test of the Lavatory Smoke Detector
(1) Do an operational test of the lavatory smoke-detection system (Ref. AMM TASK 26-17-00-710-001).
5. Close-up(1) Do an operational test of the lavatory smoke-detection system (Ref. AMM TASK 26-17-00-710-001).
Subtask 26-17-15-410-072-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the grill (13) and the air filter (12) into the air-extraction hood (8).
(3) Install the air-extraction grill (10) on the air-extraction hood (8) with the screws (11).
Subtask 26-17-15-410-072-C ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the grill (13) and the air filter (12) into the air-extraction hood (8).
(3) Install the air-extraction grill (10) on the air-extraction hood (8) with the screws (11).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the grille (14) and the air filter (13) into the air-extraction hood (9).
(3) Install the air-extraction grille (11) on the air-extraction hood (9) with the screws (12).
(4) Close the door of related lavatory (D, L or M).
Subtask 26-17-15-410-072-N ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the grille (14) and the air filter (13) into the air-extraction hood (9).
(3) Install the air-extraction grille (11) on the air-extraction hood (9) with the screws (12).
(4) Close the door of related lavatory (D, L or M).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the grille (13) and the air filter (12) into the air-extraction hood (8).
(3) Install the air-extraction grille (10) on the air-extraction hood (8) with the screws (11).
(4) Close the door of related lavatory (D or E).
Subtask 26-17-15-410-072-P ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the grille (13) and the air filter (12) into the air-extraction hood (8).
(3) Install the air-extraction grille (10) on the air-extraction hood (8) with the screws (11).
(4) Close the door of related lavatory (D or E).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the grille (13) and the air filter (12) into the air-extraction hood (8).
(3) Install the air-extraction grille (10) on the air-extraction hood (8) with the screws (11).
(4) Close the door of related lavatory (D, E or L).
Subtask 26-17-15-862-060-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Put the grille (13) and the air filter (12) into the air-extraction hood (8).
(3) Install the air-extraction grille (10) on the air-extraction hood (8) with the screws (11).
(4) Close the door of related lavatory (D, E or L).
B. Put the aircraft back to its initial configuration.
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Smoke Detector