W DOC AIRBUS | AMM A320F

Installation of the Lavatory Smoke Detector


TASK 26-17-15-400-001-A
Installation of the Lavatory Smoke Detector


ZONE: 220
FIN: 1WQ ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
220
FWD CAB UTILITY AREAS
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 23-73-00-740-005-A
BITE-Test of the Cabin Intercommunication Data System (CIDS) through the CFDS
TASK 23-73-00-740-005-B
Interface and Power-Up Test of the Cabin Intercommunication Data System (CIDS) through the CFDS
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 26-10-00-740-801-A
BITE Test of the Smoke Detection Function - System Test
TASK 26-17-00-710-001-A
Operational Test of the Lavatory Smoke-Detection System
3. Job Set-up
Subtask 26-17-15-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
   (2) Make sure that the aircraft is in the same configuration as for the removal task.
Subtask 26-17-15-865-056-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/SDCU/CHAN111WQC06
** ON A/C NOT FOR ALL
49VUCOM/CIDS/DEU B/ESS153RHG03
** ON A/C NOT FOR ALL
121VUCOM NAV/CIDS/DEU B/NORM162RHM08
** ON A/C NOT FOR ALL
121VUCOM NAV/CIDS/DEU B/NORM162RHM09
** ON A/C NOT FOR ALL
121VUCOM / CIDS / DEU B / NORM FWD193RHM09
** ON A/C NOT FOR ALL
121VUCOM/CIDS/DEU B/BAT143RHN12
** ON A/C NOT FOR ALL
122VUAIR COND/SDCU/CHAN212WQT18
** ON A/C NOT FOR ALL
2001VUCIDS-DEU B-NORM-AFT194RHC08
4. Procedure
Subtask 26-17-15-420-050-F ** ON A/C NOT FOR ALL
A. Installation of the Smoke Detector
F Smoke Detector ** ON A/C NOT FOR ALL
   (1) Make sure that the packing (6) is in the satisfactory condition.
   (2) Carefully install the packing (6) with the smoke detector (5) on the air-extraction hood (8).
   (3) Install the washers (3) (if applicable), the screws (9) and the nuts (2).
   (4) Make sure that the packing (14) on the air-extraction pipe (15) is in the satisfactory condition.
   (5) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (6) Make sure that all the electrical connections are clean and in the correct condition.
   (7) Connect the electrical connector 1WQ-A (4) to the smoke detector (5).
   (8) Carefully put the air-extraction hood (8) together with the smoke detector (5) in position on the lavatory ceiling panel (1).
   (9) Install the screws (7).
Subtask 26-17-15-865-082-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/SDCU/CHAN111WQC06
** ON A/C NOT FOR ALL
49VUCOM/CIDS/DEU B/ESS153RHG03
** ON A/C NOT FOR ALL
121VUCOM NAV/CIDS/DEU B/NORM162RHM08
** ON A/C NOT FOR ALL
121VUCOM NAV/CIDS/DEU B/NORM162RHM09
** ON A/C NOT FOR ALL
121VUCOM / CIDS / DEU B / NORM FWD193RHM09
** ON A/C NOT FOR ALL
121VUCOM/CIDS/DEU B/BAT143RHN12
** ON A/C NOT FOR ALL
122VUAIR COND/SDCU/CHAN212WQT18
** ON A/C NOT FOR ALL
2001VUCIDS-DEU B-NORM-AFT194RHC08
Subtask 26-17-15-740-050-A ** ON A/C NOT FOR ALL
C. Interface and Power-Up Test of the Cabin Intercommunication Data System (CIDS)
   (1) Do the interface and power-up test of the CIDS through the centralized fault display-system (Ref. AMM TASK 23-73-00-740-005).
Subtask 26-17-15-740-051-A ** ON A/C NOT FOR ALL
D. BITE Test of the Smoke Detection Function (SDF)
   (1) Do the BITE test of the SDF (system test) (Ref. AMM TASK 26-10-00-740-801).
Subtask 26-17-15-710-050-B ** ON A/C NOT FOR ALL
E. Test of the Lavatory Smoke Detector
   (1) Do the operational test of the lavatory smoke-detection system (Ref. AMM TASK 26-17-00-710-001).
5. Close-up
Subtask 26-17-15-410-050-F ** ON A/C NOT FOR ALL
A. Close Access
F Smoke Detector ** ON A/C NOT FOR ALL
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Put the grille (13) and the air filter (12) into the air-extraction hood (8).
   (3) Install the air-extraction grille (10) on the air-extraction hood (8) with the screws (11).
   (4) Close the door of lavatory A.
Subtask 26-17-15-862-054-A ** ON A/C NOT FOR ALL
B. Put the aircraft back to its initial configuration.
   (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) .