W DOC AIRBUS | AMM A320F

General Visual Inspection of G and P Routes Installed in the Aft Cabin Overhead-Compartment (EWIS)


TASK 24-92-00-210-043-A
General Visual Inspection of G and P Routes Installed in the Aft Cabin Overhead-Compartment (EWIS)


ZONE: 263
ZONE: 264
1. Reason for the Job
Refer to the MPD TASK: 200263-02
GENERAL VISUAL INSPECTION OF G AND P ROUTES INSTALLED IN THE AFT CABIN OVERHEAD COMPARTMENT (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
263
AFT CABIN OVERHEAD COMPARTMENT
264
AFT CABIN OVERHEAD COMPARTMENT
251JC, 261BC, 261CC, 262BC, 262CC
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 25-23-41-000-001-A
Removal of the Ceiling Panels
TASK 25-23-41-400-001-A
Installation of the Ceiling Panels
TASK 25-23-42-000-002-A
Removal of the Ceiling Panels - Aft Utility Area
TASK 25-23-42-400-002-A
Installation of the Ceiling Panels - Aft Utility Area
TASK 25-24-41-000-001-A
Removal of the Overhead Stowage Compartments (OHSC)
TASK 25-24-41-400-001-A
Installation of the Overhead Stowage Compartments (OHSC)
TASK 52-10-00-010-001-A
Opening of the Passenger/Crew Door
TASK 52-10-00-410-001-A
Closing of the Passenger/Crew Door
ESPM 2052110
3. Job Set-up
Subtask 24-92-00-010-128-A
A. Get Access
   (1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the zone 832 (842).
   (2) Open the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-010-001).
   (3) Remove the overhead stowage compartments between FR64 and FR70 (Ref. AMM TASK 25-24-41-000-001).
   (4) Remove the ceiling panel in the zones 263 and 264 (Ref. AMM TASK 25-23-41-000-001):
   (5) Remove the ceiling panels in the aft utility area (Ref. AMM TASK 25-23-42-000-002):
Subtask 24-92-00-862-116-A
B. Make sure that the aircraft electrical circuits are de-energized
(Ref. AMM TASK 24-41-00-862-002).
4. Procedure
Subtask 24-92-00-210-093-A
A. General Visual Inspection of G and P Route Wiring Installed in the Aft Cabin Overhead-Compartment
   (1) Do a visual inspection of the wiring to make sure that there is no signs of ageing, alteration, overheating, scaling and deformation ESPM 2052110:
     (a) On the AC/DC feeder routes: 3G and 6G.
     (b) On the AC/DC power-distribution routes: 1P, 2P and 3P.
NOTE: Use a flash light or a mirror if necessary.
   (2) Make sure that there is no dust contamination.
5. Close-up
Subtask 24-92-00-410-126-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the ceiling panels in the aft utility area (Ref. AMM TASK 25-23-42-400-002):
   (3) Install the ceiling panel in the zones 263 and 264 (Ref. AMM TASK 25-23-41-400-001):
   (4) Install the overhead stowage compartments between FR64 and FR70 (Ref. AMM TASK 25-24-41-400-001).
   (5) Close the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-410-001).
   (6) Remove the access platform(s).
[Rev.10 from 2021] 2026.03.31 23:26:31 UTC