Cleaning of EWIS Installed in the Aft Passenger Overhead-Compartment (Only If Contaminated)(EWIS)
TASK 24-92-00-100-021-A
Cleaning of EWIS Installed in the Aft Passenger Overhead-Compartment (Only If Contaminated)(EWIS)
1. Reason for the Job
Refer to the MPD TASK: 200253-01
CLEANING OF EWIS INSTALLED IN THE AFT PASSENGER OVERHEAD COMPARTMENT (ONLY IF CONTAMINATED) (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-92-00-010-125-A ** ON A/C NOT FOR ALL
Subtask 24-92-00-160-069-A
Subtask 24-92-00-410-123-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:27:18 UTC
Cleaning of EWIS Installed in the Aft Passenger Overhead-Compartment (Only If Contaminated)(EWIS)
1. Reason for the Job
Refer to the MPD TASK: 200253-01
CLEANING OF EWIS INSTALLED IN THE AFT PASSENGER OVERHEAD COMPARTMENT (ONLY IF CONTAMINATED) (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 253 | AFT PASSENGER COMPARTMENT OVERHEAD COMPT |
| 254 | AFT PASSENGER COMPARTMENT OVERHEAD COMPT |
| 251CC, 251DC, 251EC, 251FC, 251GC, 251HC, 251JC | |
| 251KC, 251LC, 251MC | |
| 251AC, 251BC |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-23-41-000-001-A | Removal of the Ceiling Panels |
| TASK 25-23-41-400-001-A | Installation of the Ceiling Panels |
| TASK 25-24-41-000-001-A | Removal of the Overhead Stowage Compartments (OHSC) |
| TASK 25-24-41-400-001-A | Installation of the Overhead Stowage Compartments (OHSC) |
| TASK 25-42-41-000-001-A | Removal of Lavatory H |
| TASK 25-42-41-400-001-A | Installation of Lavatory H |
| TASK 52-10-00-010-001-A | Opening of the Passenger/Crew Door |
| TASK 52-10-00-410-001-A | Closing of the Passenger/Crew Door |
| ESPM 2055000 | |
Subtask 24-92-00-010-125-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the zone 832 (842).
(2) Open the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-010-001).
(3) Remove the furnishings in the zones 251 and 252:
(a) Remove the lavatories, if installed (Ref. AMM D/O 25-42-41-00).
(4) Remove the overhead stowage compartments between FR47 and FR64 (Ref. AMM TASK 25-24-41-000-001).
(5) Remove the ceiling panels in the zones 253 and 254 (Ref. AMM TASK 25-23-41-000-001):
Subtask 24-92-00-010-125-B ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the zone 832 (842).
(2) Open the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-010-001).
(3) Remove the furnishings in the zones 251 and 252:
(a) Remove the lavatories, if installed (Ref. AMM D/O 25-42-41-00).
(4) Remove the overhead stowage compartments between FR47 and FR64 (Ref. AMM TASK 25-24-41-000-001).
(5) Remove the ceiling panels in the zones 253 and 254 (Ref. AMM TASK 25-23-41-000-001):
A. Get Access
(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the zone 832 (842).
(2) Open the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-010-001).
(3) Remove the furnishings in the zones 251 and 252:
(a) Remove the lavatories, if installed (Ref. AMM TASK 25-42-41-000-001).
(4) Remove the overhead stowage compartments between FR47 and FR64 (Ref. AMM TASK 25-24-41-000-001).
(5) Remove the ceiling panels in the zones 253 and 254 (Ref. AMM TASK 25-23-41-000-001):
Subtask 24-92-00-010-125-C ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the zone 832 (842).
(2) Open the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-010-001).
(3) Remove the furnishings in the zones 251 and 252:
(a) Remove the lavatories, if installed (Ref. AMM TASK 25-42-41-000-001).
(4) Remove the overhead stowage compartments between FR47 and FR64 (Ref. AMM TASK 25-24-41-000-001).
(5) Remove the ceiling panels in the zones 253 and 254 (Ref. AMM TASK 25-23-41-000-001):
A. Get Access
(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the zone 832 (842).
(2) Open the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-010-001).
(3) Remove the furnishings in the zones 251 and 252:
(a) Remove the lavatories, if installed (Ref. AMM D/O 25-42-41-00).
(4) Remove the overhead stowage compartments between FR47 and FR64 (Ref. AMM TASK 25-24-41-000-001).
(5) Remove the ceiling panels in the zones 253 and 254 (Ref. AMM TASK 25-23-41-000-001):
Subtask 24-92-00-862-113-A 4. Procedure(1) Put an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at the zone 832 (842).
(2) Open the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-010-001).
(3) Remove the furnishings in the zones 251 and 252:
(a) Remove the lavatories, if installed (Ref. AMM D/O 25-42-41-00).
(4) Remove the overhead stowage compartments between FR47 and FR64 (Ref. AMM TASK 25-24-41-000-001).
(5) Remove the ceiling panels in the zones 253 and 254 (Ref. AMM TASK 25-23-41-000-001):
Subtask 24-92-00-160-069-A
A. Cleaning of All Wiring Installed in the Aft Passenger Overhead-Compartment (Only Contaminated Wiring)
(1) Clean the wiring if there is dust contamination ESPM 2055000.
(a) On the AC/DC feeder routes: 3G and 6G.
(b) On the AC/DC power-distribution routes: 1P, 2P and 3P.
(c) On the engine control route: 1S.
(d) On other routes: 1M, 2M and 3M.
(e) On the excitation wiring routes: 6E and 3E.
(f) On the audio or video route: 1R.
5. Close-up(1) Clean the wiring if there is dust contamination ESPM 2055000.
(a) On the AC/DC feeder routes: 3G and 6G.
(b) On the AC/DC power-distribution routes: 1P, 2P and 3P.
(c) On the engine control route: 1S.
(d) On other routes: 1M, 2M and 3M.
(e) On the excitation wiring routes: 6E and 3E.
(f) On the audio or video route: 1R.
Subtask 24-92-00-410-123-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ceiling panels in the zones 253 and 254 (Ref. AMM TASK 25-23-41-400-001):
(3) Install the overhead stowage compartments between FR47 and FR64 (Ref. AMM TASK 25-24-41-400-001).
(4) Install the furnishings in the zones 251 and 252:
(a) Install the lavatories, if removed (Ref. AMM D/O 25-42-41-40).
(5) Close the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-410-001).
(6) Remove the access platform(s).
Subtask 24-92-00-410-123-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ceiling panels in the zones 253 and 254 (Ref. AMM TASK 25-23-41-400-001):
(3) Install the overhead stowage compartments between FR47 and FR64 (Ref. AMM TASK 25-24-41-400-001).
(4) Install the furnishings in the zones 251 and 252:
(a) Install the lavatories, if removed (Ref. AMM D/O 25-42-41-40).
(5) Close the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-410-001).
(6) Remove the access platform(s).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ceiling panels in the zones 253 and 254 (Ref. AMM TASK 25-23-41-400-001):
(3) Install the overhead stowage compartments between FR47 and FR64 (Ref. AMM TASK 25-24-41-400-001).
(4) Install the furnishings in the zones 251 and 252:
(a) Install the lavatories, if removed (Ref. AMM TASK 25-42-41-400-001).
(5) Close the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-410-001).
(6) Remove the access platform(s).
Subtask 24-92-00-410-123-C ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ceiling panels in the zones 253 and 254 (Ref. AMM TASK 25-23-41-400-001):
(3) Install the overhead stowage compartments between FR47 and FR64 (Ref. AMM TASK 25-24-41-400-001).
(4) Install the furnishings in the zones 251 and 252:
(a) Install the lavatories, if removed (Ref. AMM TASK 25-42-41-400-001).
(5) Close the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-410-001).
(6) Remove the access platform(s).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ceiling panels in the zones 253 and 254 (Ref. AMM TASK 25-23-41-400-001):
(3) Install the overhead stowage compartments between FR47 and FR64 (Ref. AMM TASK 25-24-41-400-001).
(4) Install the furnishings in the zones 251 and 252:
(a) Install the lavatories, if removed (Ref. AMM D/O 25-42-41-40).
(5) Close the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-410-001).
(6) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ceiling panels in the zones 253 and 254 (Ref. AMM TASK 25-23-41-400-001):
(3) Install the overhead stowage compartments between FR47 and FR64 (Ref. AMM TASK 25-24-41-400-001).
(4) Install the furnishings in the zones 251 and 252:
(a) Install the lavatories, if removed (Ref. AMM D/O 25-42-41-40).
(5) Close the passenger/crew door 832 (842) (Ref. AMM TASK 52-10-00-410-001).
(6) Remove the access platform(s).
Aft Passenger Overhead-Compartment - Cleaning Area - Zones 253-254