Integrity Test of the Electrical Power
TASK 24-00-00-710-003-A
Integrity Test of the Electrical Power
1. Reason for the Job
To ensure aircraft safety after maintenance work on the wiring.
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 24-00-00-860-056-A
Subtask 24-00-00-710-050-A
Subtask 24-00-00-860-057-A
[Rev.10 from 2021]
2026.03.31 23:19:20 UTC
Integrity Test of the Electrical Power
1. Reason for the Job
To ensure aircraft safety after maintenance work on the wiring.
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-004-A | Procedure to Get Access to the SYSTEM REPORT/TEST/ELEC Page |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 24-00-00-860-056-A
A. Aircraft Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) On the ECAM control panel, push the ELEC key (on the lower ECAM DU, the ELEC page comes into view).
(4) On the MCDU, get the system REPORT/TEST/ELEC page (Ref. AMM TASK 31-32-00-860-004).
(5) Make sure that the AC ESS FEED, BUS TIE and GALLEY pushbutton switches are pushed.
Subtask 24-00-00-865-061-A (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) On the ECAM control panel, push the ELEC key (on the lower ECAM DU, the ELEC page comes into view).
(4) On the MCDU, get the system REPORT/TEST/ELEC page (Ref. AMM TASK 31-32-00-860-004).
(5) Make sure that the AC ESS FEED, BUS TIE and GALLEY pushbutton switches are pushed.
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | SDAC/1 AND 2/28VDC/ESS BUS | 12WV | F05 |
| 106VU | DC BUS/1 AND 2/MONG | 68WV | C03 |
| 122VU | ELEC/GALY & CAB/GND/FLT/LOGIC | 7XA | S24 |
| 122VU | ELEC/BUS/2XP/CTL | 17XN2 | V27 |
| 122VU | ELEC/AC/BUS1/CTL | 17XN1 | V25 |
| 122VU | ELEC/CNTOR/DC/BUS/TIE1 | 9PC | W25 |
| 122VU | ELEC/EXT PWR/LT CLT/NOT IN/USE | 6XG | X30 |
| 122VU | ELEC/TR2/MONG | 3PU2 | X26 |
| 122VU | ELEC/TR1/MONG | 3PU1 | X25 |
| 123VU | TR1/SPLY | 2PU1 | AB10 |
| 123VU | TR2/214XP/SPLY | 2PU2 | AB04 |
| 123VU | AC ESS/BUS ON/BUS 1 | 1XC | AC12 |
| 123VU | AC ESS/BUS ON/BUS 2 | 2XC | AC01 |
| 124VU | TR2/CNTOR/SPLY | 4PU2 | BC01 |
| 125VU | TR1/CNTOR/SPLY | 4PU1 | CF01 |
Subtask 24-00-00-710-050-A
A. Energization of the Aircraft with Batteries 1 and 2
Subtask 24-00-00-710-051-A | ACTION | RESULT | FUNCTION OF THE TEST |
1.On ELEC control panel 35VU:
| On ELEC control panel 35VU:
| To do the electrical configuration where only batteries are available but not connected to the network. NOTE: Only hot buses are supplied. |
2.On the EMER ELEC PWR section of panel 21VU:
| Wait until the PFD and upper ECAM DU images come into view. | To do a check of the static inverter and make sure that it operates correctly. To make sure that the batteries correctly supply the AC ESS, DC ESS and 901XP busbars. |
3.On the ECAM control panel:
| On the upper ECAM DU, on the "ELEC" page:
| To make sure that the status of the static inverter is "OK" on the ECAM DU. |
| 4.Release the ELEC key of the ECAM control panel and the EMER GEN TEST pushbutton switch of the EMER ELEC PWR section of panel 21VU. | | To complete the test. |
B. Ground Service Configuration
Subtask 24-00-00-710-052-A | ACTION | RESULT | FUNCTION OF THE TEST |
1.On control panel 2000VU:
| In the right avionics compartment:
| To do a check of the ground service configuration and make sure that TR2 operates correctly. |
2.On panel 122VU:
| In the right avionics compartment
| To deactivate TR2. |
C. Loss of Busbars 1XP and 2XP
Subtask 24-00-00-710-053-A | ACTION | RESULT | FUNCTION OF THE TEST |
1.On ELEC control panel 35VU:
| On ELEC control panel 35VU:
| To supply electrical network with EXT PWR and let the Battery Charge Limiter (BCL) manage the BAT contactors. |
2.On panel 122VU:
| On the lower ECAM DU, on the "ELEC" page:
| To simulate the loss of the AC1 busbar. To do a check of the DC BAT and DC ESS busbars and make sure that they are configured again correctly. To make sure that the ECAM warning is shown. |
| | On the upper ECAM DU:
| |
3.On panel 122VU:
| On the lower ECAM DU, on the "ELEC" page:
| To stop the simulation of loss of the AC1 busbar. |
| | On the upper ECAM DU:
| |
4.On panel 123VU:
| On the lower ECAM DU, on the "ELEC" page:
| To stop the Essential (ESS) Transformer Rectifier (TR). |
5.On panel 122VU:
| On the lower ECAM DU, on the "ELEC" page:
| To simulate the loss of the AC2 busbar. To make sure that the ECAM warning is shown. |
| | On the upper ECAM DU:
| |
6.On panel 122VU:
| On the lower ECAM DU, on the "ELEC" page:
| To stop the simulation of loss of the AC2 busbar. |
| | On the upper ECAM DU:
|
D. Transmission Logic of Busbar 4XP
Subtask 24-00-00-710-054-A | ACTION | RESULT | FUNCTION OF THE TEST |
1.On AC power center 123VU:
| On ELEC control panel 35VU:
| To disconnect the AC ESS busbar and make sure that the ECAM warning is shown. |
2.On the ECAM control panel:
| On the lower ECAM DU, on the "ELEC" page:
| To make sure that the AC ESS busbar is disconnected on the ECAM DU. |
3.On ELEC control panel 35VU:
| On the ELEC control panel 35VU:
| To get the AC ESS supply again from the AC2 busbar. To make sure that the "AC ESS BUS FAULT" ECAM warning is not shown at this time. |
| | On the lower ECAM DU, on the "ELEC" page:
| |
| | On the upper ECAM DU:
| |
4.On AC power center 123VU:
| On ELEC control panel 35VU:
| To disconnect the AC ESS busbar and make sure that the ECAM warning is shown. |
5.On the ECAM control panel:
| On the lower ECAM DU, on the "ELEC" page:
| To make sure that the AC ESS busbar is disconnected on the ECAM DU. |
6.On AC power center 123VU:
| On ELEC control panel 35VU:
| To put the circuit breaker back to its initial configuration. To get the AC ESS supply again from the AC2 busbar. To make sure that the "AC ESS BUS FAULT" ECAM warning is not shown at this time. |
| | On the lower ECAM DU, on the "ELEC" page:
| |
7.On AC power center 123VU:
| No change. | To put the circuit breaker back to its initial configuration. |
8.On ELEC control panel 35VU:
| On ELEC control panel 35VU:
| To put the AC ESS supply back to its initial configuration. |
| | On the lower ECAM DU, on the "ELEC" page:
| To make sure that the initial configuration is correct on the ECAM DU. |
E. Loss of the Electrical Network with the BUS TIE Pushbutton Switch
Subtask 24-00-00-710-055-A | ACTION | RESULT | FUNCTION OF THE TEST |
1.On ELEC control panel 35VU:
| On ELEC control panel 35VU:
| To stop the electrical power supply from EXT PWR. NOTE: Only batteries are available. |
| | Make sure that the lower and upper ECAM DUs are de-energized. | To make sure that the electrical power supply is stopped from EXR PWR. |
2.On ELEC control panel 35VU:
| On ELEC control panel 35VU:
| To supply the electrical power again from EXT PWR. |
| | Make sure that the lower and upper ECAM DUs are energized again. | To make sure that the electrical power is supplied again from EXR PWR. |
F. Galley Shedding Logic
Subtask 24-00-00-710-056-A | ACTION | RESULT | FUNCTION OF THE TEST |
1.On panel 122VU:
| On the lower ECAM DU, on the "ELEC" page:
| To disconnect the galleys. |
2.On panel 122VU:
| On the lower ECAM DU, on the "ELEC" page:
| To connect the supply of the galleys again. |
3.On ELEC control panel 35VU:
| On the lower ECAM DU, on the "ELEC" page:
| To disconnect the galleys. |
4.On ELEC control panel 35VU:
| On the lower ECAM DU, on the "ELEC" page:
| To connect the supply of the galleys again. |
G. Transmission Logic of the DC Electrical Network
This test is for system 1. For the other system(s), use the indications between parentheses.
Subtask 24-00-00-710-057-A This test is for system 1. For the other system(s), use the indications between parentheses.
| ACTION | RESULT | FUNCTION OF THE TEST |
1.On panel 122VU:
| On the lower ECAM DU, on the "ELEC" page:
| To stop the Backup Power Supply (BPS) of the TR1(2) fault-detection module. |
2.On panel 125VU (124VU):
| On the lower ECAM DU, on the "ELEC" page:
| To apply force on contactor 5PU1(2) to open it (simulate a TR1(2) failure). To do a check of the DC1(2), DC BAT and DC ESS busbars and make sure that they are configured again correctly. To make sure that the ECAM warning is shown. |
| | On the upper ECAM DU:
| |
3.On panels 122VU and 125VU:
| No change. | To put the circuit breakers back to their initial configuration. |
4.On the MCDU, on the "ELEC" page:
| On the MCDU:
| To get access to the TR1(2) menu on the MCDU. |
| On the MCDU:
| To do a reset of TR1(2). To get the DC1(2) power supply again from TR1(2). To make sure that the ECAM warning is not shown at this time. |
| | On the lower ECAM DU, on the "ELEC" page:
| |
| | On the upper ECAM DU:
| |
5.On panel 123VU:
| On the lower ECAM DU, on the "ELEC" page:
| To stop the ESS TR. |
6.On panel 123VU:
| On the lower ECAM DU, on the "ELEC" page:
| To stop TR1(2). To do a check of the DC1(2), DC BAT and DC ESS busbars and make sure that they are configured again correctly. To make sure that the ECAM warning is shown. |
| | On the upper ECAM DU:
| |
7.On panel 123VU:
| On the lower ECAM DU, on the "ELEC" page:
| To put the circuit breaker back to its initial configuration. To get the power supply again from TR1(2). |
8.On the MCDU, on the "ELEC" page:
| On the MCDU:
| To get access to the TR1(2) menu on the MCDU. |
| On the MCDU:
| To do a reset of TR1(2). To get the DC1(2) power supply again from TR1(2). To make sure that the ECAM warning is not shown at this time. |
| | On the SD, on the "ELEC" page:
| |
| | On the upper ECAM DU:
| |
9.On panel 123VU:
| On the lower ECAM DU, on the "ELEC" page:
| To stop the ESS TR. |
10.On panel 122VU:
| On the lower ECAM DU, on the "ELEC" page:
| To apply force on contactor 1PC1 to open it. To do a check of the DC BAT and DC ESS busbars and make sure that they are configured again correctly. |
11.On control panel 122VU:
| On the lower ECAM DU, on the "ELEC" page:
| To put the circuit breaker back to its initial configuration. To do a check of the DC BAT busbar supply from the DC1 busbar. |
12.On panel 123VU:
| On the lower ECAM DU, on the "ELEC" page:
| To stop the ESS TR. |
H. Test of the "DC EMER CONFIG" Warning
Subtask 24-00-00-710-058-A | ACTION | RESULT | FUNCTION OF THE TEST |
1.On panels 106VU and 49VU:
| On the lower ECAM DU, on the "ELEC" page:
| To do the DC EMER configuration. To make sure that the ECAM warning is shown. |
| | On the upper ECAM DU:
| |
2.On panels 106VU and 49VU:
| On the lower ECAM DU, on the "ELEC" page:
| To put the circuit breakers back to their initial configuration. To make sure that the ECAM warning is not shown at this time. |
| | On the upper ECAM DU:
|
I. Emergency Logic with the Batteries
5. Close-up| ACTION | RESULT | FUNCTION OF THE TEST |
| 1.Make sure that the voltage of batteries 1 and 2 is more than 25.5V. | | To do a check of the two batteries and make sure that they have sufficient voltage to do the test that follows. |
2.On ELEC control panel 35VU:
| On the lower ECAM DU, on the "ELEC" page:
| To do a charging cycle on BAT1. |
3.On ELEC control panel 35VU:
| On the lower ECAM DU, on the "ELEC" page:
| To do a charging cycle on BAT2. |
4.On ELEC control panel 35VU:
| On ELEC control panel 35VU:
| To disconnect the two batteries from the electrical network. |
On EMER ELEC PWR control panel 21VU:
| | To connect the Constant Speed Motor/Generator (CSM/G) to the emergency electrical network. |
On ELEC control panel 35VU:
| | To disconnect the normal electrical network. |
On the ECAM control panel
| Total loss of the normal electrical network. On the upper ECAM DU:
| To make sure that the normal electrical network is disconnected. To make sure that the static inverter operates. |
5.On ELEC control panel 35VU:
| | To connect the normal electrical network again and the batteries to the electrical network. |
On EMER ELEC PWR control panel 21VU:
| The normal electrical network is energized again. On ELEC control panel 35VU:
| To complete the test. |
6.On the MCDU:
| | To complete the test. |
Subtask 24-00-00-860-057-A
A. Put the Aircraft back to its initial Configuration
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).