Operational Test of the Windshear Function
TASK 22-60-00-710-004-A
Operational Test of the Windshear Function
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 22-60-00-860-056-A ** ON A/C NOT FOR ALL
Subtask 22-60-00-710-053-A
Subtask 22-60-00-860-057-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:10:11 UTC
Operational Test of the Windshear Function
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
ZONE: 210
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-001-A | Procedure to Get Access to the SYSTEM REPORT/TEST Menu Page |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 22-60-00-860-056-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the ventilation of the electronics racks operates correctly.
(3) On the overhead panel, on the ADIRS CDU:
Subtask 22-60-00-860-056-C ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the ventilation of the electronics racks operates correctly.
(3) On the overhead panel, on the ADIRS CDU:
- set the OFF/NAV/ATT selector switches to NAV.
- set the AIR DATA switch to CAPT/3, F/0/3 then NORM position (this action is mandatory to do the test correctly).
- make sure that the FAC 1 and FAC 2 pushbutton switches are pushed (the FAULT and OFF legends are off).
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the ventilation of the electronics racks operates correctly.
(3) On the overhead panel, on the ADIRS MSU:
4. Procedure(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the ventilation of the electronics racks operates correctly.
(3) On the overhead panel, on the ADIRS MSU:
- Set the OFF/NAV/ATT selector switches to NAV.
- Set the AIR DATA switch to CAPT/3, F/0/3 then NORM position (this action is mandatory to do the test correctly).
- Make sure that the FAC 1 and FAC 2 pushbutton switches are pushed (the FAULT and OFF legends are off).
Subtask 22-60-00-710-053-A
A. Operational Test of the Windshear Function
5. Close-upNOTE: You can stop the windshear test when it is necessary. To stop the test, push the line key adjacent to the END OF TEST indication, (the AFS MAIN MENU page comes into view).
NOTE: To engage or disengage the FAC 1(2), push the FAC1(2) pushbutton switch on the panel 23VU(24VU).
| ACTION | RESULT |
|---|---|
| 1.On the center pedestal, on the MCDU: | |
| The SYSTEM REPORT/TEST page comes into view. |
| 2.On the SYSTEM REPORT/TEST page: | |
| The AFS MAIN MENU page comes into view. |
| 3.On the AFS MAIN MENU page: | |
| The AFS/WINDSHEAR TEST-1 page comes into view. |
4.On the AFS/WINDSHEAR TEST-1 page:
NOTE: Make sure that you do this step in less than 2.5 minutes. If not, start the windshear test again. | |
| The AFS/WINDSHEAR TEST-2 page comes into view. |
5.On the AFS/WINDSHEAR TEST-2 page:
| |
| The AFS/WINDSHEAR TEST-3 page comes into view. |
6.On the AFS/WINDSHEAR TEST-3 page:
NOTE: When the predictive windshear function is active:
| |
| The AFS/WINDSHEAR TEST-4 page comes into view. |
7.On the AFS/WINDSHEAR TEST-4 page:
| |
| The AFS/WINDSHEAR TEST-5 page comes into view. |
8.On the AFS/WINDSHEAR TEST-5 page:
| |
| The AFS/WINDSHEAR TEST-6 page comes into view. |
9.On the AFS/WINDSHEAR TEST-6 page:
NOTE: When the predictive windshear function is active:
| |
| The AFS/WINDSHEAR TEST-7 page comes into view. |
| 10.On the AFS/WINDSHEAR TEST-7 page: | |
| The WINDSHEAR TEST OK indication comes into view. |
11.On the MCDU:
| |
Subtask 22-60-00-860-057-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) On the MCDU, push the line select key adjacent to the RETURN indication until the CFDS menu page comes into view.
(2) On the overhead panel, on the ADIRS CDU, set the OFF/NAV/ATT selector switches to OFF.
(3) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
Subtask 22-60-00-860-057-C ** ON A/C NOT FOR ALL (1) On the MCDU, push the line select key adjacent to the RETURN indication until the CFDS menu page comes into view.
(2) On the overhead panel, on the ADIRS CDU, set the OFF/NAV/ATT selector switches to OFF.
(3) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
A. Put the aircraft back to its initial configuration.
(1) On the MCDU, push the line select key adjacent to the RETURN indication until the CFDS menu page comes into view.
(2) On the overhead panel, on the ADIRS MSU, set the OFF/NAV/ATT selector switches to OFF.
(3) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
(1) On the MCDU, push the line select key adjacent to the RETURN indication until the CFDS menu page comes into view.
(2) On the overhead panel, on the ADIRS MSU, set the OFF/NAV/ATT selector switches to OFF.
(3) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
Procedure Test