Procedure to Get Access to the SYSTEM REPORT/TEST Menu Page
TASK 31-32-00-860-001-A
Procedure to Get Access to the SYSTEM REPORT/TEST Menu Page
To get access to the SYSTEM REPORT/TEST pages
This job gives access to the SYSTEM REPORT/TEST pages of the systems connected to the CFDS.
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 31-32-00-860-056-A Subtask 31-32-00-865-063-A
Subtask 31-32-00-860-057-A
[Rev.10 from 2021]
2026.04.01 04:29:12 UTC
Procedure to Get Access to the SYSTEM REPORT/TEST Menu Page
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
NOTE: IGNORE ALL THE ECAM WARNINGS AS LONG AS THE COMPUTER IS IN THE MENU MODE.
ZONE: 210
1. Reason for the JobTo get access to the SYSTEM REPORT/TEST pages
This job gives access to the SYSTEM REPORT/TEST pages of the systems connected to the CFDS.
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
Subtask 31-32-00-860-056-A Subtask 31-32-00-865-063-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AUTO FLT/MCDU/1 | 11CA1 | B01 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AUTO FLT/MCDU/1 | 11CA1 | H07 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | CFDS/CFDIU/SPLY | 2TW | J18 |
| 121VU | CFDS/CFDIU/BACK/UP | 8TW | J17 |
| ** ON A/C ALL | |||
| 121VU | AUTO FLT/MCDU/2 | 11CA2 | N20 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | CFDS/CFDIU/SPLY | 2TW | J41 |
| 121VU | CFDS/CFDIU/BACK/UP | 8TW | J40 |
Subtask 31-32-00-860-057-A
A. Access to the SYSTEM REPORT/TEST Menu Pages
NOTE: The procedure below is applicable to the MCDU 1 or 2.
The actions and the results of this procedure occur on the MCDU used.
The actions and the results of this procedure occur on the MCDU used.
NOTE: After a power-up of the CFDS:
- The CFDS prompt is shown in the MCDU MENU page after approximately 60 seconds.
- The full CFDS functionality is available after approximately 3 minutes, to make computation of the A/C configuration possible.
| ACTION | RESULT |
|---|---|
On the MCDU:
| |
| On the MCDU:
|
| the CFDS MENU page comes into view. |
| the SYSTEM REPORT/TEST page comes into view |
| |
CFDS - SYSTEM REPORT/TEST - Menu Page