Operational Test of the Takeover and Priority Pushbutton Switches
TASK 22-10-00-710-001-A
Operational Test of the Takeover and Priority Pushbutton Switches
To do a check of the AP disengagement by the Takeover and Priority Pushbutton Switches and related warning.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 22-10-00-860-050-A
Subtask 22-10-00-710-050-C
Subtask 22-10-00-860-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:09:50 UTC
Operational Test of the Takeover and Priority Pushbutton Switches
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
1. Reason for the JobTo do a check of the AP disengagement by the Takeover and Priority Pushbutton Switches and related warning.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 120 | AVIONICS COMPARTMENT |
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 34-10-00-860-004-A | Inertial Reference (IR) Alignment-Procedure |
| TASK 34-10-00-860-004-A-01 | Automatic Inertial Reference (IR) Alignment-Procedure |
| TASK 34-10-00-860-004-A-02 | Inertial Reference (IR) Alignment-Procedure to do a Check of the Links between each Flight Management and Guidance Computer (FMGC) and the three Air Data/Inertial Reference Units (ADIRUs) |
Subtask 22-10-00-860-050-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Align the ADIRS (two ADIRS are necessary in this test)
(Ref. AMM TASK 34-10-00-860-004).
(3) On the overhead panel, on the FLT CTL panels 23VU and 24VU:
(Ref. AMM TASK 31-60-00-860-001).
Subtask 22-10-00-010-050-A (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Align the ADIRS (two ADIRS are necessary in this test)
(Ref. AMM TASK 34-10-00-860-004).
(3) On the overhead panel, on the FLT CTL panels 23VU and 24VU:
- make sure that the ELAC 1 and 2, SEC 1, 2 and 3, and FAC 1 and 2 pushbutton switches are pushed (the FAULT and OFF legends must be off).
NOTE: The two ELACs, one SEC and one FAC are necessary for this test.
(4) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
B. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 822.
(a) Open the access door 822.
(b) On the battery power center 105VU:
Subtask 22-10-00-865-050-A (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 822.
(a) Open the access door 822.
(b) On the battery power center 105VU:
- loosen the two screws and remove the protective cover.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B11 |
| 49VU | AUTO FLT/FCU/1 | 9CA1 | B05 |
| 49VU | AUTO FLT/FMGC/1 | 10CA1 | B02 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/ELAC1/NORM/SPLY | 15CE1 | B06 |
| 49VU | AUTO FLT/FCU/1 | 9CA1 | H11 |
| 49VU | AUTO FLT/FMGC/1 | 10CA1 | H08 |
| ** ON A/C ALL | |||
| 105VU | FLIGHT CONTROLS/ELAC2/STBY SPLY | 16CE2 | A02 |
| 105VU | FLT CTL/ELAC1/STBY SPLY | 16CE1 | A01 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AUTO FLT/RUDDER/ARTF/FEEL | 14CA | N17 |
| 121VU | AUTO FLT/STICK/LOCK | 13CA | N16 |
| ** ON A/C ALL | |||
| 121VU | AUTO FLT/FCU/2 | 9CA2 | M21 |
| 121VU | AUTO FLT/FMGC/2 | 10CA2 | M17 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AUTO FLT/RUDDER/ARTF/FEEL | 14CA | N19 |
| 121VU | AUTO FLT/STICK/LOCK | 13CA | N18 |
Subtask 22-10-00-710-050-C
A. Do this test:
5. Close-up| ACTION | RESULT |
|---|---|
| 1.Make sure that the two FDs are engaged. NOTE: If they are not engaged, push the FD pushbutton switches on the FCU (glareshield: 13VU). | On the upper section of the Captain's and First Officer's PFDs:
|
2.On the FCU:
| This pushbutton switch comes on. On the upper section of the PFDs:
|
3.On the Captain's side stick controller:
| The AP1(2) disengages. On the FCU:
|
4.On the FCU:
| This pushbutton switch comes on. On the upper section of the PFDs:
|
5.On the First Officer's side stick controller:
| The AP1(2) disengages. On the FCU:
|
| 6.Open the circuit breakers 15CE1(15CE2) and 16CE1(16CE2). | On the overhead panel, on the FLT CTL panel 23VU:
|
7.On the FCU:
| This pushbutton switch comes on. On the upper section of the PFDs:
|
8.On the Captain's side stick controller:
| The AP1(2) disengages. On the FCU:
|
| 9.Close the circuit breakers 15CE1(15CE2) and 16CE1(16CE2). | On the overhead panel, on the FLT CTL panel 23VU:
|
| 10.Do the tests again from step 2 to step 9 with information between parentheses. | You must get the same results (step by step). |
Subtask 22-10-00-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) On the overhead panel, on the ADIRS CDU, set the OFF/NAV/ATT selector switches to OFF.
(2) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
Subtask 22-10-00-860-051-B ** ON A/C NOT FOR ALL (1) On the overhead panel, on the ADIRS CDU, set the OFF/NAV/ATT selector switches to OFF.
(2) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
A. Aircraft Maintenance Configuration
(1) On the overhead panel, on the ADIRS MSU, set the OFF/NAV/ATT selector switches to OFF.
(2) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
Subtask 22-10-00-410-050-A (1) On the overhead panel, on the ADIRS MSU, set the OFF/NAV/ATT selector switches to OFF.
(2) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(3) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
B. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).
(1) Install the protective cover on the battery power center 105VU.
(2) Tighten the two screws.
(3) Close the access door 822.
(4) Remove the access platform(s).