GENERAL VISUAL INSPECTION OF INBOARD FIXED LEADING EDGE STRUCTURE (EWIS)
TASK 05-25-20-200-001-A
GENERAL VISUAL INSPECTION OF INBOARD FIXED LEADING EDGE STRUCTURE (EWIS)
Refer to the MPD TASK: ZL-521-01
GENERAL VISUAL INSPECTION OF INBOARD FIXED LEADING EDGE STRUCTURE (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-25-20-866-050-A Subtask 05-25-20-010-050-A
Subtask 05-25-20-210-050-A
Subtask 05-25-20-410-050-A
[Rev.10 from 2021]
2026.03.31 22:50:09 UTC
GENERAL VISUAL INSPECTION OF INBOARD FIXED LEADING EDGE STRUCTURE (EWIS)
WARNING:
DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE DEPLOYED IN THE 45 DEG. POSITION.
1. Reason for the JobRefer to the MPD TASK: ZL-521-01
GENERAL VISUAL INSPECTION OF INBOARD FIXED LEADING EDGE STRUCTURE (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 521 | INBOARD FIXED L.E STRUCTURE |
| 621 | INBOARD FIXED L.E STRUCTURE |
| 521AB, 521AT, 521BT, 521CB, 521EB, 521GB, 521HB, 621AB, 621AT, 621BT, 621CB, 621EB, 621GB, 621HB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 27-80-00-866-004-A | Extending the Slats on the Ground |
| TASK 27-80-00-866-005-A | Retracting the Slats on the Ground |
| TASK 57-41-37-000-004-A | Removal of the Pressure Relief Panels |
| TASK 57-41-37-000-009-A | Removal of the Access Panel |
| TASK 57-41-37-000-010-A | Removal of the Access Panel |
| TASK 57-41-37-000-011-A | Removal of the Access Panel |
| TASK 57-41-37-000-802-A | Removal of the Access Panel 521AT(621AT) |
| TASK 57-41-37-400-002-A | Installation of the Pressure Relief Panels |
| TASK 57-41-37-400-009-A | Installation of the Access Panel |
| TASK 57-41-37-400-010-A | Installation of the Access Panel |
| TASK 57-41-37-400-011-A | Installation of the Access Panel |
| TASK 57-41-37-400-802-A | Installation of the Access Panel 521AT(621AT) |
Subtask 05-25-20-866-050-A Subtask 05-25-20-010-050-A
B. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT) in position at the zone 522 (622).
(2) Remove the access panels:
521AB 521AT 521BT,
521CB 521EB 521GB,
521HB.
621AB 621AT 621BT,
621CB 621EB 621GB,
621HB.
(Ref. AMM TASK 57-41-37-000-004) (Ref. AMM TASK 57-41-37-000-009) (Ref. AMM TASK 57-41-37-000-010) (Ref. AMM TASK 57-41-37-000-011) (Ref. AMM TASK 57-41-37-000-802)
4. Procedure(1) Put an ACCESS PLATFORM 3M (10 FT) in position at the zone 522 (622).
(2) Remove the access panels:
521AB 521AT 521BT,
521CB 521EB 521GB,
521HB.
621AB 621AT 621BT,
621CB 621EB 621GB,
621HB.
(Ref. AMM TASK 57-41-37-000-004) (Ref. AMM TASK 57-41-37-000-009) (Ref. AMM TASK 57-41-37-000-010) (Ref. AMM TASK 57-41-37-000-011) (Ref. AMM TASK 57-41-37-000-802)
Subtask 05-25-20-210-050-A
A. Inspection
(1) Do a general visual inspection of the structure of the inboard fixed leading edge.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up(1) Do a general visual inspection of the structure of the inboard fixed leading edge.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
Subtask 05-25-20-410-050-A
A. Close Access
(1) Install the access panels:
521AB 521AT 521BT,
521CB 521EB 521GB,
521HB.
621AB 621AT 621BT,
621CB 621EB 621GB,
621HB.
(Ref. AMM TASK 57-41-37-400-002) (Ref. AMM TASK 57-41-37-400-009) (Ref. AMM TASK 57-41-37-400-010) (Ref. AMM TASK 57-41-37-400-011) (Ref. AMM TASK 57-41-37-400-802)
(2) Remove the access platform(s).
Subtask 05-25-20-866-051-A (1) Install the access panels:
521AB 521AT 521BT,
521CB 521EB 521GB,
521HB.
621AB 621AT 621BT,
621CB 621EB 621GB,
621HB.
(Ref. AMM TASK 57-41-37-400-002) (Ref. AMM TASK 57-41-37-400-009) (Ref. AMM TASK 57-41-37-400-010) (Ref. AMM TASK 57-41-37-400-011) (Ref. AMM TASK 57-41-37-400-802)
(2) Remove the access platform(s).
Access Panels of the Upper Leading Edge of the Wing