W DOC AIRBUS | AMM A320F

Operational Test of the Throttle Control Unit [CFMI]


TASK 76-11-00-710-802-A
Operational Test of the Throttle Control Unit


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 27-96-00-740-001-A
BITE Test of the EFCS (Ground Scanning)
TASK 31-60-00-860-001-A
EIS Start Procedure
TASK 31-60-00-860-002-A
EIS Stop Procedure
3. Job Set-up
Subtask 76-11-00-861-052-A ** ON A/C NOT FOR ALL
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 76-11-00-869-075-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) Do the EIS start procedure (upper ECAM DU only) (Ref. AMM TASK 31-60-00-860-001).
   (2) On the panel 50VU, make sure that the ENG FADEC GND PWR 1 and 2 pushbutton switches are released (ON legends come on).
Subtask 76-11-00-865-074-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 8KS1 (CTL UNITTHROTTLE, ENG 1)
49VUENGINE/1/FADEC A/AND EIU 12KS1A04
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R41
FOR FIN: 8KS2 (CTL UNITTHROTTLE, ENG 2)
49VUENGINE/2/FADEC A/AND EIU 22KS2A05
121VUENGINE/ENG2/FADEC B4KS2Q40
Subtask 76-11-00-865-075-A ** ON A/C NOT FOR ALL
WARNING: OPEN THE ANTI-ICE PROBE CIRCUIT BREAKERS BEFORE YOU OPEN CIRCUIT BREAKERS 2KS1 AND 2KS2. IF YOU DO NOT OBEY THIS SEQUENCE, THE PROBES CAN BECOME HOT. THIS CAN CAUSE INJURY TO THE PERSONS WHO ARE NEAR THEM.
WARNING: BEFORE YOU OPEN PHC CIRCUIT BREAKERS 2DA1(2,3), OPEN PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3). IF YOU DO NOT OBEY THIS SEQUENCE: - THE PROBES WILL BECOME TOO HOT. - THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE PERSONNEL.
D. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUANTI ICE/PROBES/AOA/14DA1D04
49VUANTI ICE/PROBES/PHC/12DA1D03
49VUANTI ICE/PROBES/PITOT/13DA1D02
122VUANTI ICE/WINDOWS/R4DG2W14
122VUANTI ICE/WINDOWS/L4DG1X14
122VUANTI ICE/PROBES/PHC/32DA3Y16
122VUANTI ICE/PROBES/2/TAT1DA2Y15
122VUANTI ICE/PROBES/2/PITOT3DA2Y14
122VUANTI ICE/PROBES/2/AOA4DA2Y13
122VUANTI ICE/PROBES/PHC/22DA2Y12
122VUANTI ICE/PROBES/2/STATIC5DA2Y11
122VUANTI ICE/PROBES/3/PITOT3DA3Z16
122VUANTI ICE/PROBES/3/AOA4DA3Z15
122VUANTI ICE/PROBES/3/STATIC5DA3Z14
122VUANTI ICE/PROBES/1/STATIC5DA1Z13
122VUANTI ICE/PROBES/1/TAT1DA1Z12
4. Procedure
Subtask 76-11-00-710-057-A ** ON A/C NOT FOR ALL
A. Do this test
ACTION
RESULT
1.Open the circuit breakers 2KS1, 2KS2.

2.Move the ENG1(2) throttle control lever.
Make sure that the small white circle on N1 indication follows the throttle position.
3.Close the circuits breakers 2KS1, 2KS2.

4.Open the circuit breakers 4KS1, 4KS2.

5.Move the ENG1(2) throttle control lever.
Make sure that the small white circle on N1 indication follows the throttle position.
6.Close the circuit breakers 4KS1, 4KS2.

7.Move the ENG1(2) throttle control lever.
Make sure that the small white circle on N1 indication follows the throttle position. Make sure that no warning message comes into view on the upper ECAM DU.
8.Do the BITE test of the EFCS (Ref. AMM TASK 27-96-00-740-001).
Make sure that there are no messages related to the throttle control unit 8KS1(2).
5. Close-up
Subtask 76-11-00-865-076-A ** ON A/C NOT FOR ALL
A. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
105VUFLT CTL/SEC1/STBY SPLY22CEB01
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
Subtask 76-11-00-869-076-A ** ON A/C NOT FOR ALL
B. Put the aircraft back to its initial configuration.
   (1) On the panel 50VU, release the ENG FADEC GND PWR 1 and 2 pushbutton switches (ON LEGENDS GOES OFF).
   (2) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
Subtask 76-11-00-862-052-A ** ON A/C NOT FOR ALL
C. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.01 13:09:19 UTC