W DOC AIRBUS | AMM A320F

Removal of the Sense Lines of the Bleed Regulated Pressure-Transducer and the Bleed Transferred Pressure-Transducer


TASK 36-11-49-000-832-A
Removal of the Sense Lines of the Bleed Regulated Pressure-Transducer and the Bleed Transferred Pressure-Transducer


WARNING: MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING: ALWAYS USE APPLICABLE GLOVES TO TOUCH HOT PARTS. HOT PARTS CAN CAUSE INJURY TO PERSONS.
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
CAUTION: BE VERY CAREFUL WHEN YOU DO WORK ON OR NEAR THE AIR-CONDITIONING DUCTS. THE DUCTS ARE MADE OF THIN MATERIAL AND YOU CAN EASILY BREAK THEM.
ZONE: 410
ZONE: 420
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
410
ENG 1 PYLON BOX AND FORWARD FAIRING
420
ENG 2 PYLON BOX AND FORWARD FAIRING
191DB
FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
415AL, 415BL, 415BR, 437AL, 438AR, 451AL, 452AR
FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
425AL, 425BL, 425BR, 447AL, 448AR, 461AL, 462AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 49-00-00-860-009-A
APU Shutdown by External Power (131-9(A))
TASK 49-00-00-860-009-A-01
APU Shutdown by Batteries (131-9(A))
TASK 54-51-21-000-802-A
Removal of the Pylon Lateral Access-Doors
TASK 71-00-00-860-833-A
Procedure to Prevent Engine Motoring
TASK 71-13-00-010-802-A
Opening of the Fan Cowl Doors
TASK 78-30-00-040-805-A
Deactivation of the Thrust Reverser System for Ground Maintenance
TASK 78-36-00-010-802-A
Opening of the Thrust Reverser Cowl-Doors
3. Job Set-up
Subtask 36-11-49-861-123-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
Subtask 36-11-49-941-140-A ** ON A/C NOT FOR ALL
B. Safety Precautions
   (1) Make sure that the engine 1(2) shutdown occurred not less than five minutes before you do this procedure.
   (2) On AIR COND panel 30VU:
     (a) Make sure that the ENG 1(2) BLEED pushbutton switch is released (OFF legend on).
     (b) Make sure that the APU BLEED pushbutton switch is released (ON legend off).
     (c) Put a WARNING NOTICE(S) in position to tell persons not to operate the pneumatic system.
   (3) Do the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
   (4) On access door 191DB, on the HP ground connector:
     (a) Put a WARNING NOTICE(S) in position to tell persons not to pressurize the pneumatic system.
Subtask 36-11-49-865-222-A ** ON A/C NOT FOR ALL
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 4020KM1 (POWER PLANTDEMOUNTABLE, ENG 1)
49VUAIR BLEED/ENG 1/CTL2HA1D11
122VUAIR BLEED/ENG 1/MONG3HA1Z23
FOR FIN: 4020KM2 (POWER PLANTDEMOUNTABLE, ENG 2)
49VUAIR BLEED/ENG 2/MONG3HA2D12
122VUAIR BLEED/ENG 2/CTL2HA2Z22
Subtask 36-11-49-010-254-A ** ON A/C NOT FOR ALL
D. Get Access
   (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
Subtask 36-11-49-040-168-A ** ON A/C NOT FOR ALL
E. Deactivation of the Thrust Reverser System for Ground Maintenance
WARNING: YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
   (1) Do the deactivation of the thrust reverser system for ground maintenance (Ref. AMM TASK 78-30-00-040-805).
Subtask 36-11-49-010-258-A ** ON A/C NOT FOR ALL
F. Get Access
   (1) Open the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-010-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR
   (2) Put an ACCESS PLATFORM 2M (6 FT) in position.
   (3) Remove these access doors (Ref. AMM TASK 54-51-21-000-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
415AL 415BL 415BR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
425AL 425BL 425BR
4. Procedure
Subtask 36-11-49-020-152-A ** ON A/C NOT FOR ALL
A. Removal of the Sense Line of the Bleed Transferred Pressure-Transducer
   (1) If you use the APU to energize the electrical circuits, stop the APU:
   (2) In the cockpit, on the SD bleed page:
     (a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
WARNING: MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING: DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
CAUTION: USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT THE PNEUMATIC LINES ON UNIONS.
   (3) Loosen the union nut (3) of the sense line (1).
   (4) Loosen the union nut (18) of the HPV pylon sense-hose (16).
   (5) Disconnect the HPV pylon sense-hose (16) from the sense line (1).
   (6) Remove the two bolts (14) and the washers (12) from the pylon interface (11).
   (7) If not removed, remove the three clamps (9) as follows:
     (a) Remove the six bolts (7) and washers (8) from the three clamps (9).
     (b) Remove the first parts of the three clamps (9) from the second parts of the three clamps (9) and the sense line (1).
     (c) Make sure that the second parts of the three clamps (9) stay on the supports (10).
   (8) Disconnect the sense line (1) from the bleed transferred pressure-transducer (4) and the pylon interface (11).
   (9) Remove the sense line (1) from the pylon.
   (10) Put PLUG - BLANKING on the port of the bleed transferred pressure-transducer (4) and the HPV pylon sense-hose (16).
   (11) Put the PLUG-BLANKING in each disconnected line end.
Subtask 36-11-49-020-154-A ** ON A/C NOT FOR ALL
B. Removal of the Sense Line of the Bleed Regulated Pressure-Transducer
CAUTION: USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT THE PNEUMATIC LINES ON UNIONS.
   (1) Loosen the union nut (6) of the sense line (2).
   (2) Loosen the union nut (19) of the PRV pylon sense-hose (17).
   (3) Disconnect the PRV pylon sense-hose (17) from the sense line (2).
   (4) Remove the two bolts (15) and washers (13) from the pylon interface (11).
   (5) Remove the three clamps (9), if not already removed.
     (a) Remove the six bolts (7) and washers (8) from the three clamps (9).
     (b) Remove the first parts of the three clamps (9) from the second parts of the three clamps (9) and the sense line (2).
     (c) Make sure that the second parts of the three clamps (9) stay on the supports (10).
   (6) Disconnect the sense line (2) from the bleed regulated pressure-transducer (5) and the pylon interface (11).
   (7) Remove the sense line (2) from the pylon.
   (8) Put PLUG - BLANKING on the port of the bleed transferred pressure-transducer (5) and the PRV pylon sense-hose (17).
   (9) Put the PLUG-BLANKING in each disconnected line end.
[Rev.10 from 2021] 2026.04.01 01:11:37 UTC