Removal of the Bleed Air Ducts
TASK 36-11-48-000-802-A
Removal of the Bleed Air Ducts
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 36-11-48-941-060-A ** ON A/C NOT FOR ALL
Subtask 36-11-48-020-086-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 12:38:31 UTC
Removal of the Bleed Air Ducts
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| 98D27803000000 | 1 | LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14QAD1) | Wire-- Stainless Steel Braided - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 521 | INBOARD FIXED L.E STRUCTURE |
| 621 | INBOARD FIXED L.E STRUCTURE |
| 521AB, 521BB, 521BT, 521CB, 521EB, 621AB, 621BB, 621BT, 621CB, 621EB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-92-00-000-802-A | Removal of the Pylon Power Feeder-Cables |
| TASK 27-00-00-480-002-A | Installation of the Flap/Slat Control-Lever Locking Tool (98D27803000000) |
| TASK 27-80-00-866-004-A | Extending the Slats on the Ground |
| TASK 30-11-51-000-001-A | Removal of the Wing Anti-Ice Control-Valve |
| TASK 36-11-17-000-001-A | Removal of the Heat-Exchanger Outlet-Temperature Sensor |
| TASK 57-41-37-000-004-A | Removal of the Pressure Relief Panels |
| TASK 57-41-37-000-005-A | Removal of the NACA Duct Panel |
| TASK 57-41-37-000-009-A | Removal of the Access Panel |
Subtask 36-11-48-941-060-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
(2) On AIR COND overhead-panel 30VU, put the WARNING NOTICE(S) in position to tell persons not to operate the pneumatic systems.
Subtask 36-11-48-860-064-A ** ON A/C NOT FOR ALL (1) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
(2) On AIR COND overhead-panel 30VU, put the WARNING NOTICE(S) in position to tell persons not to operate the pneumatic systems.
B. Aircraft Maintenance Configuration
(2) On center pedestal panel 114VU:
(a) Install the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION in position on the flap/slat control lever (Ref. AMM TASK 27-00-00-480-002).
(b) Put the WARNING NOTICE(S) in position to tell persons not to operate the flap/slat controls.
Subtask 36-11-48-865-074-A ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
(1) Fully extend the slats (Ref. AMM TASK 27-80-00-866-004). (2) On center pedestal panel 114VU:
(a) Install the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION in position on the flap/slat control lever (Ref. AMM TASK 27-00-00-480-002).
(b) Put the WARNING NOTICE(S) in position to tell persons not to operate the flap/slat controls.
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 36-11-48-010-062-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | ENGINE/2/FADEC A/AND EIU 2 | 2KS2 | A05 |
| 49VU | ENGINE/1/FADEC A/AND EIU 1 | 2KS1 | A04 |
| 49VU | ENGINE/1 AND 2/IGN/SYS A | 1JH | A03 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1 | 5CV | B01 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ENGINE/ENG2/FADEC B/AND EIU2 | 4KS2 | Q40 |
| 121VU | ENGINE/ENG1/FADEC B/AND EIU 1 | 4KS1 | R41 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ENGINE/IGN/ENG2/SYS B | 3JH2 | P42 |
| 121VU | ENGINE/IGN/ENG1/SYS B | 3JH1 | P41 |
| 121VU | FLIGHT CONTROLS/SLT/CTL/SYS2 | 7CV | R21 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ENGINE/ENG2/FADEC B/AND EIU2 | 4KS2 | R41 |
| 121VU | ENGINE/ENG1/FADEC B/AND EIU 1 | 4KS1 | R40 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
D. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the applicable access panels.
(2) Remove the applicable access panels:
(a) For the left wing:
4. Procedure(1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the applicable access panels.
(2) Remove the applicable access panels:
(a) For the left wing:
- 521AB, 521CB and 521EB (Ref. AMM TASK 57-41-37-000-004)
- 521BB (Ref. AMM TASK 57-41-37-000-005)
- 521BT (Ref. AMM TASK 57-41-37-000-009).
Subtask 36-11-48-020-086-A ** ON A/C NOT FOR ALL
A. Removal of the Bleed Air Ducts between the Fuselage and Slat Track 1
(2) Remove the insulation muffs (2) and (7).
(3) Remove the clamps (4) and (6).
(4) Remove the bleed air duct (5) from the aircraft.
(5) Remove the nut (12), insulation washer (13), facing washer (11) and the bolt (14).
(6) Remove the insulation washer (9) and the facing washer (8) from the bolt (14).
(7) Disconnect the link assembly (10) from the bleed air duct (1).
(8) Remove the clamp (3).
(9) Remove the bleed air duct (1) from the aircraft.
(10) Install a PLUG - BLANKING on the bleed air duct in the fuselage.
Subtask 36-11-48-020-087-A ** ON A/C NOT FOR ALL WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(1) Cut, remove and discard the Wire-- Stainless Steel Braided - (Material No.14QAD1) from the insulation muffs (2) and (7). (2) Remove the insulation muffs (2) and (7).
(3) Remove the clamps (4) and (6).
(4) Remove the bleed air duct (5) from the aircraft.
(5) Remove the nut (12), insulation washer (13), facing washer (11) and the bolt (14).
(6) Remove the insulation washer (9) and the facing washer (8) from the bolt (14).
(7) Disconnect the link assembly (10) from the bleed air duct (1).
(8) Remove the clamp (3).
(9) Remove the bleed air duct (1) from the aircraft.
(10) Install a PLUG - BLANKING on the bleed air duct in the fuselage.
B. Removal of the Bleed Air Ducts between Slat Track 1 and the Intermediate Rib
(1) Remove the duct assembly (60) before you remove the bleed air ducts between slat track 1 and the intermediate rib.
(3) Remove the insulation muffs (22), (36) and (42).
(4) Remove the nut (23), the washer (24) and the screw (17). Disconnect the bonding leads (25) and (18) from the duct assembly (16).
(5) Remove the nut (33), the washer (34) and the screw (26). Disconnect the bonding lead (25) from the duct assembly (28).
(6) Remove the nut (30), the washer (31) and the screw (29). Disconnect the bonding lead (32) from the duct assembly (28).
(7) Remove the nut (53), the washer (54) and the screw (38). Disconnect the bonding lead (32) from the connector assembly (40).
(8) Remove the nut (52), the washer (51) and the screw (39). Disconnect the bonding lead (47) from the connector assembly (40).
(9) Remove the nut (45), the washer (46) and the screw (43). Disconnect the bonding leads (44) and (47).
(10) Remove the bolts (48), the facing washers (49) and the insulation washers (50).
(11) Remove the connector assembly (40).
(12) Remove and discard the two piece seals (37) and (41) from the connector assembly (40).
(13) Remove the nuts (57) and the bolts (55).
(14) Remove the rib assembly (56).
(15) Carefully remove the duct assembly (28) and the tube assembly (27) from the aircraft.
(16) Remove and discard the two piece seal (35) from the duct assembly (28).
(17) Remove the bolts (21), the facing washers (20) and the insulation washers (19).
(18) Remove the duct assembly (16) and the tube assembly (15) from the aircraft.
Subtask 36-11-48-020-088-A ** ON A/C NOT FOR ALL (1) Remove the duct assembly (60) before you remove the bleed air ducts between slat track 1 and the intermediate rib.
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(2) Cut, remove and discard the Wire-- Stainless Steel Braided - (Material No.14QAD1) from the insulation muffs (22), (36) and (42). (3) Remove the insulation muffs (22), (36) and (42).
(4) Remove the nut (23), the washer (24) and the screw (17). Disconnect the bonding leads (25) and (18) from the duct assembly (16).
(5) Remove the nut (33), the washer (34) and the screw (26). Disconnect the bonding lead (25) from the duct assembly (28).
(6) Remove the nut (30), the washer (31) and the screw (29). Disconnect the bonding lead (32) from the duct assembly (28).
(7) Remove the nut (53), the washer (54) and the screw (38). Disconnect the bonding lead (32) from the connector assembly (40).
(8) Remove the nut (52), the washer (51) and the screw (39). Disconnect the bonding lead (47) from the connector assembly (40).
(9) Remove the nut (45), the washer (46) and the screw (43). Disconnect the bonding leads (44) and (47).
(10) Remove the bolts (48), the facing washers (49) and the insulation washers (50).
(11) Remove the connector assembly (40).
(12) Remove and discard the two piece seals (37) and (41) from the connector assembly (40).
(13) Remove the nuts (57) and the bolts (55).
(14) Remove the rib assembly (56).
(15) Carefully remove the duct assembly (28) and the tube assembly (27) from the aircraft.
(16) Remove and discard the two piece seal (35) from the duct assembly (28).
(17) Remove the bolts (21), the facing washers (20) and the insulation washers (19).
(18) Remove the duct assembly (16) and the tube assembly (15) from the aircraft.
C. Removal of the Bleed Air Ducts between the Intermediate Rib and the Closing Rib
(1) Remove the bleed air ducts between slat track 1 to the intermediate rib before you remove the bleed air duct (64).
(3) Remove the insulation muffs (62) and (71).
(4) Remove the clamps (58) and (61).
(5) Remove the duct assembly (60) and the sleeve assembly (59) from the aircraft.
(6) Remove the nut (68), the washer (67) and the screw (66). Disconnect the bonding lead (69) from the duct assembly (64).
(7) Remove the nut (73), the washer (74) and the screw (72). Disconnect the bonding leads (69) and (75) from the duct assembly (84).
(8) Carefully move the duct assembly (64) through the tube assemblies (65) and (63) and remove the duct assembly (64) from the aircraft.
(9) Remove and discard the two piece seal (70) from the duct assembly (64).
Subtask 36-11-48-020-089-A ** ON A/C NOT FOR ALL (1) Remove the bleed air ducts between slat track 1 to the intermediate rib before you remove the bleed air duct (64).
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(2) Cut, remove and discard the Wire-- Stainless Steel Braided - (Material No.14QAD1) from the insulation muffs (62) and (71). (3) Remove the insulation muffs (62) and (71).
(4) Remove the clamps (58) and (61).
(5) Remove the duct assembly (60) and the sleeve assembly (59) from the aircraft.
(6) Remove the nut (68), the washer (67) and the screw (66). Disconnect the bonding lead (69) from the duct assembly (64).
(7) Remove the nut (73), the washer (74) and the screw (72). Disconnect the bonding leads (69) and (75) from the duct assembly (84).
(8) Carefully move the duct assembly (64) through the tube assemblies (65) and (63) and remove the duct assembly (64) from the aircraft.
(9) Remove and discard the two piece seal (70) from the duct assembly (64).
D. Removal of the Bleed Air Ducts between the Closing Rib and the Pylon
(2) Remove the insulation muffs (88) and (98).
(3) Remove the temperature sensor (103) from the bleed air duct (89) (Ref. AMM TASK 36-11-17-000-001).
(4) For the right wing only, do these steps:
(a) If necessary, disconnect the Integrated Drive Generator (IDG) cables for better access to the bleed air duct (Ref. AMM TASK 24-92-00-000-802).
(b) Remove the nuts (115) and the bolts (110).
(c) Remove the nuts (116), the washers (117) and the bolts (109).
(d) Remove the nuts (114) and the bolts (112).
(e) Carefully put the cable carrier (111) in position to allow access for removal of the bracket (113).
(f) Remove the bracket (113).
(6) Remove the nuts (106), the washers (107) and the bolts (108).
(7) Disconnect the structural rods (90), (91) and (92).
(8) Remove the clamps (87), (104) and (102).
(9) Carefully remove the duct assembly (89) from the aircraft.
(10) Remove the nuts (86), the washers (85) and (77) and the bolts (76).
(11) Remove the cable support bracket (78).
(12) Remove the nuts (79), bolts (83), facing washers (82) and the insulation washers (81).
(13) Carefully remove the duct assembly (84) and the insulation gasket (80).
(14) Install a PLUG - BLANKING on the pre cooler duct.
(15) Remove the nut (101), the washer (100) and the screw (93).
(16) Remove the bonding lead (99) from the duct assembly (94).
(17) Remove the duct assembly (94) from the aircraft.
(18) Remove the flexible connector (96) from the duct assembly (123).
(19) Remove and discard the seals (95) and (97).
Subtask 36-11-48-020-090-A ** ON A/C NOT FOR ALL WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(1) Cut, remove and discard the Wire-- Stainless Steel Braided - (Material No.14QAD1) from the insulation muffs (88) and (98). (2) Remove the insulation muffs (88) and (98).
(3) Remove the temperature sensor (103) from the bleed air duct (89) (Ref. AMM TASK 36-11-17-000-001).
(4) For the right wing only, do these steps:
(a) If necessary, disconnect the Integrated Drive Generator (IDG) cables for better access to the bleed air duct (Ref. AMM TASK 24-92-00-000-802).
(b) Remove the nuts (115) and the bolts (110).
(c) Remove the nuts (116), the washers (117) and the bolts (109).
(d) Remove the nuts (114) and the bolts (112).
(e) Carefully put the cable carrier (111) in position to allow access for removal of the bracket (113).
(f) Remove the bracket (113).
WARNING:
USE PROTECTIVE GOGGLES WHEN YOU REMOVE OR INSTALL A COTTER PIN. EACH TIME YOU REMOVE A COTTER PIN DURING THE TASK, DISCARD IT IMMEDIATELY. A LOOSE COTTER PIN CAN CUT YOU OR MAKE YOU BLIND.
(5) Remove and discard the cotter pins (105). (6) Remove the nuts (106), the washers (107) and the bolts (108).
(7) Disconnect the structural rods (90), (91) and (92).
(8) Remove the clamps (87), (104) and (102).
(9) Carefully remove the duct assembly (89) from the aircraft.
(10) Remove the nuts (86), the washers (85) and (77) and the bolts (76).
(11) Remove the cable support bracket (78).
(12) Remove the nuts (79), bolts (83), facing washers (82) and the insulation washers (81).
(13) Carefully remove the duct assembly (84) and the insulation gasket (80).
(14) Install a PLUG - BLANKING on the pre cooler duct.
(15) Remove the nut (101), the washer (100) and the screw (93).
(16) Remove the bonding lead (99) from the duct assembly (94).
(17) Remove the duct assembly (94) from the aircraft.
(18) Remove the flexible connector (96) from the duct assembly (123).
(19) Remove and discard the seals (95) and (97).
E. Removal of the Bleed Air Ducts between the Pylon and the Anti Ice Valve
(1) Remove the anti ice valve from the duct assembly (130) (Ref. AMM TASK 30-11-51-000-001).
(3) Remove the insulation muff (128).
(4) Remove the nut (122), the washer (121) and the bolt (118).
(5) Remove the bonding leads (120) and (119) from the duct assembly (123).
(6) Remove the nuts (135), the washers (136) and the bolts (137) from the link assemblies.
(7) Remove the nuts (134), the washers (133) and (132) and the screws (131).
(8) Remove the half clamps (138) and (139) and the link assemblies.
(9) Loosen the vapor seal (129) from the duct assembly (130).
(10) Remove the clamp (127).
(11) Carefully remove the duct assembly (130) from the aircraft.
(12) Remove the bolts (126), the washers (125) and the insulation gasket (124).
(13) Remove the duct assembly (123) from the aircraft.
(1) Remove the anti ice valve from the duct assembly (130) (Ref. AMM TASK 30-11-51-000-001).
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(2) Cut, remove and discard the Wire-- Stainless Steel Braided - (Material No.14QAD1) from the insulation muff (128). (3) Remove the insulation muff (128).
(4) Remove the nut (122), the washer (121) and the bolt (118).
(5) Remove the bonding leads (120) and (119) from the duct assembly (123).
(6) Remove the nuts (135), the washers (136) and the bolts (137) from the link assemblies.
(7) Remove the nuts (134), the washers (133) and (132) and the screws (131).
(8) Remove the half clamps (138) and (139) and the link assemblies.
(9) Loosen the vapor seal (129) from the duct assembly (130).
(10) Remove the clamp (127).
(11) Carefully remove the duct assembly (130) from the aircraft.
(12) Remove the bolts (126), the washers (125) and the insulation gasket (124).
(13) Remove the duct assembly (123) from the aircraft.
Bleed Air Ducts from the Fuselage to Slat Track 1