Operational Test of the GPS
TASK 34-36-00-710-008-A
Operational Test of the GPS
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 34-36-00-860-084-A ** ON A/C NOT FOR ALL
Subtask 34-36-00-710-064-A ** ON A/C NOT FOR ALL
Subtask 34-36-00-860-085-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 04:04:51 UTC
Operational Test of the GPS
ZONE: 210
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 34-10-00-860-004-A | Inertial Reference (IR) Alignment-Procedure |
| TASK 34-10-00-860-004-A-02 | Inertial Reference (IR) Alignment-Procedure to do a Check of the Links between each Flight Management and Guidance Computer (FMGC) and the three Air Data/Inertial Reference Units (ADIRUs) |
| TASK 34-10-00-860-005-A | ADIRS Stop Procedure |
Subtask 34-36-00-860-084-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the IR alignment procedure (Ref. AMM TASK 34-10-00-860-004).
(3) On the center pedestal, on the SWITCHING panel 8VU, make sure that the ATT HDG selector switch is at NORM.
Subtask 34-36-00-865-072-A ** ON A/C NOT FOR ALL NOTE: Do this test in an open area (not in the hangar).
(1) Energize the aircraft electrical circuits(Ref. AMM TASK 24-41-00-861-002).
(2) Do the IR alignment procedure (Ref. AMM TASK 34-10-00-860-004).
(3) On the center pedestal, on the SWITCHING panel 8VU, make sure that the ATT HDG selector switch is at NORM.
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | NAV/MMR/1 | 42RT1 | G12 |
| 121VU | COM NAV/MMR/2 | 42RT2 | L07 |
Subtask 34-36-00-710-064-A ** ON A/C NOT FOR ALL
A. Operational Test of the GPS
Subtask 34-36-00-710-065-A ** ON A/C NOT FOR ALL NOTE: The actions and the results of this procedure occur on the MCDU used.
| ACTION | RESULT |
|---|---|
| During the test, ignore all the indications shown on the NDs (this includes the GPS PRIMARY LOST indication). | |
| Test of the GPS data acquisition with the IRS aligned | |
1.On the MCDU:
| On the MCDU:
|
2.On the MCDU, on the DATA INDEX page:
| On the MCDU:
NOTE: If you do this test after you replace the MMR, between one to twenty minutes are necessary before the GPS data comes into view on the MCDU.
|
3.On the overhead panel, on the ADIRS CDU:
| On the MCDU, on the GPS MONITOR page:
|
| 4.Open circuit breakers 42RT1 and 42RT2. | On the upper ECAM DU:
|
| | On the MCDU, on the GPS MONITOR page:
|
| | On the CAPT and F/O NDs:
NOTE: The GPS PRIMARY LOST indication does not come into view immediately after you open circuit breakers 42RT1 and 42RT2. 60 minutes can be necessary before the indication comes into view. It is not necessary to wait for the GPS PRIMARY LOST indication to come into view (this indication is not important for the test). |
| 5.Close circuit breakers 42RT1 and 42RT2. | On the upper ECAM DU:
|
6.On the MCDU, on the GPS MONITOR page:
| |
B. Operational Test of the Predictive GPS (with Honeywell ADIRU only)
5. Close-upNOTE: The actions and the results of this procedure occur on the MCDU used.
NOTE: This test is for system 1. For system 2, use the indications between the parentheses.
| ACTION | RESULT |
|---|---|
| Test of the GPS operation through the PREDICTIVE GPS page on the MCDU | |
| 1.Open the circuit breaker 42RT2 (42RT1). | |
2.On the MCDU1 (MCDU2):
| On the MCDU1 (MCDU2):
|
|
|
|
|
|
|
3.On the MCDU1 (MCDU2):
| On the MCDU1 (MCDU2):
|
|
|
| |
|
|
|
| 4.Close the circuit breaker 42RT2 (42RT1). | |
Subtask 34-36-00-860-085-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) Do the ADIRS stop procedure (Ref. AMM TASK 34-10-00-860-005).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Do the ADIRS stop procedure (Ref. AMM TASK 34-10-00-860-005).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).