Operational Test of the Attitude/Heading (ATT/HDG) Switching Function
TASK 34-14-00-710-003-A
Operational Test of the Attitude/Heading (ATT/HDG) Switching Function
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 34-14-00-010-050-A
Subtask 34-14-00-710-054-A ** ON A/C NOT FOR ALL
Subtask 34-14-00-860-056-A
[Rev.10 from 2021]
2026.04.01 08:25:45 UTC
Operational Test of the Attitude/Heading (ATT/HDG) Switching Function
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
ZONE: 210
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M(3 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 34-14-00-010-050-A
A. Get Access
(1) Put the ACCESS PLATFORM 1M(3 FT) in position at access door 822.
(2) Open access door 822.
(3) On battery power center 105VU:
Subtask 34-14-00-865-054-A (1) Put the ACCESS PLATFORM 1M(3 FT) in position at access door 822.
(2) Open access door 822.
(3) On battery power center 105VU:
- Loosen the two screws and remove the protective cover.
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 34-14-00-860-055-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | NAV PROBES/ADIRU3/PWR/SWTG | 8FP | F09 |
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 49VU | NAV PROBES/ADIRU 1/AND AOA 1/26VAC | 5FP1 | F07 |
| 49VU | NAV PROBES/ADIRU1/115VAC | 4FP1 | F06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | NAV PROBES/ADIRU3/PWR/SWTG | 8FP | F08 |
| ** ON A/C ALL | |||
| 105VU | ADIRS/ADIRU1/28VDC | 6FP1 | C02 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ADIRS/ADIRU/2PWR/SHED | 10FP | N10 |
| ** ON A/C ALL | |||
| 121VU | ADIRS/ADIRU/3PWR/SWTG | 9FP | N09 |
| 121VU | ADIRS/ADIRU/2/26VAC AND AOA | 5FP2 | N08 |
| 121VU | ADIRS/ADIRU/3/26VAC AND AOA | 5FP3 | N07 |
| 121VU | ADIRS/ADIRU/2/115VAC | 4FP2 | N06 |
| 121VU | ADIRS/ADIRU/3/115VAC | 4FP3 | N05 |
| 121VU | ADIRS/ADIRU/2/28VDC | 6FP2 | N04 |
| 121VU | ADIRS/ADIRU/3/28VDC | 6FP3 | N03 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ADIRS/2PWR/SHED &/AOA2 MON | 10FP | N10 |
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On the overhead panel :
Subtask 34-14-00-860-055-B ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On the overhead panel :
- On the FLT CTL panels 23VU and 24VU, make sure that the FAC, ELAC and SEC pushbutton switches are not pushed (in). The OFF legends are on.
- On the ADIRS CDU, make sure that the three OFF/NAV/ATT selector switches are at OFF.
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On the overhead panel:
4. Procedure(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On the overhead panel:
- On flight control panels 23VU and 24VU, make sure that the FAC, ELAC and SEC pushbutton switches are released (the OFF legends are on).
- On ADIRS MSU panel 41VU, make sure that the three OFF/NAV/ATT selector switches are set to OFF.
Subtask 34-14-00-710-054-A ** ON A/C NOT FOR ALL
A. Operational Test of the Attitude/Heading (ATT/HDG) Switching Function
Subtask 34-14-00-710-054-B ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
1.On the ADIRS CDU :
| On the ADIRS CDU :
|
|
|
| 2.On the center pedestal, on the SWITCHING panel 8VU, set the ATT HDG selector switch to CAPT/3. | |
| 3.On the ADIRS CDU, set the OFF/NAV/ATT selector switch related to the IR1 to OFF. | On the ADIRS CDU, the ALIGN legend of the IR1 annunciator goes off On the Captain PFD, the pitch and roll attitudes stay in view. |
| 4.On the center pedestal, on the SWITCHING panel 8VU, set the ATT HDG selector switch to NORM then to F/O/3. | On the Captain PFD, the ATT flag is shown (ignore the related warnings). |
| 5.On the ADIRS CDU, set the OFF/NAV/ATT selector switch related to the IR2 to OFF. | - On the ADIRS CDU, the ALIGN legend of the IR2 annunciator goes off - On the First Officer PFD, the pitch and roll attitudes stay in view. |
| 6.On the center pedestal, on the SWITCHING panel 8VU, set the ATT HDG selector switch to NORM. | On the First Officer PFD, the ATT flag is shown (ignore the related warnings). |
| 7.On the ADIRS CDU : | |
| On the ADIRS CDU, the ALIGN legend of the IR3 annunciator goes off. |
A. Operational Test of the Attitude/Heading (ATT/HDG) Switching Function
5. Close-up| ACTION | RESULT |
|---|---|
1.On ADIRS MSU panel 41VU:
| On ADIRS MSU panel 41VU:
|
|
|
| 2.On the center pedestal, on the SWITCHING panel 8VU, set the ATT HDG selector switch to CAPT/3. | |
| 3.On ADIRS MSU panel 41VU, set the OFF/NAV/ATT selector switch related to IR1 to OFF. | On the Captain PFD, the pitch and roll attitudes stay in view. |
| 4.On the center pedestal, on the SWITCHING panel 8VU, set the ATT HDG selector switch to NORM then to F/O/3. | On the Captain PFD, the ATT flag is shown (ignore the related warnings). |
| 5.On ADIRS MSU panel 41VU, set the OFF/NAV/ATT selector switch related to IR2 to OFF. | On the First Officer PFD, the pitch and roll attitudes stay in view. |
| 6.On the center pedestal, on the SWITCHING panel 8VU, set the ATT HDG selector switch to NORM. | On the First Officer PFD, the ATT flag is shown (ignore the related warnings). |
Subtask 34-14-00-860-056-A
A. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Put the aircraft back to the serviceable condition.
Subtask 34-14-00-410-050-A (1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Put the aircraft back to the serviceable condition.
B. Close Access
(1) Install the protective cover on battery power center 105VU.
(2) Tighten the two screws.
(3) Close access door 822.
(4) Remove the access platform(s).
(1) Install the protective cover on battery power center 105VU.
(2) Tighten the two screws.
(3) Close access door 822.
(4) Remove the access platform(s).