W DOC AIRBUS | AMM A320F

Removal of the Flexible Hose Assembly


TASK 32-31-39-000-001-A
Removal of the Flexible Hose Assembly


WARNING: MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
FIN: 2765GM
FIN: 2766GM
FIN: 2767GM
FIN: 2768GM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 1M(3 FT)
No specific
1
CONTAINER 5 L (1.32 USGAL)
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
2
WARNING NOTICE(S)
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 32-00-00-860-001-A
Flight Configuration Precautions with Electrical Power
TASK 32-00-00-860-001-A-01
Flight Configuration Precautions without Electrical Power
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
3. Job Set-up
Subtask 32-31-39-860-050-A
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
   (2) Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001).
Subtask 32-31-39-010-050-A
B. Get Access
   (1) Open the left or the right MLG door (Ref. AMM TASK 32-12-00-010-001).
Subtask 32-31-39-869-050-A
C. Disconnection of the PTU Isolation Coupling
   (1) Depressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-001).
   (2) Disconnect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-001).
   (3) Obey the flight configuration precautions (Ref. AMM TASK 32-00-00-860-001).
   (4) Put the ACCESS PLATFORM 1M(3 FT) in position.
   (5) Put the CONTAINER 5 L (1.32 USGAL) below the flexible hose assembly 2765GM (2768GM) and 2766GM (2767GM) to collect the hydraulic fluid leakage.
Subtask 32-31-39-865-050-A
D. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
Subtask 32-31-39-941-050-A
E. Safety Precautions
   (1) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green hydraulic system:
  • On the panel 40VU in the cockpit
  • On the ground service panel of the Green hydraulic system.
4. Procedure
Subtask 32-31-39-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Flexible Hose Assembly 2765GM (2768GM) and 2766GM (2767GM)
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Disconnect the connectors (2), (5) from the swivel joints (4) and (3).
   (3) Disconnect the connectors (11), the nuts (12) and the washers (13) from the elbow joints (14) and the brackets (15).
   (4) Remove the nuts (7), the washers (8) and the bolts (10) from the clamps (9).
   (5) Remove the clamps (9) from the flexible hoses (6) and (1).
   (6) Remove the flexible hoses (6) and (1).
   (7) Put the PLUG-BLANKING in each disconnected line end.
Subtask 32-31-39-020-050-C ** ON A/C NOT FOR ALL
A. Removal of the Flexible Hose Assembly 2765GM (2768GM) and 2766GM (2767GM)
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Disconnect the connectors (2), (5) from the swivel joints (4) and (3).
   (3) Disconnect the connectors (7), the nuts (8) and the washers (9) from the elbow joints (10) and the brackets (11).
   (4) Remove the flexible hoses (6) and (1).
   (5) Put the PLUG-BLANKING in each disconnected line end.
Subtask 32-31-39-020-050-D ** ON A/C NOT FOR ALL
A. Removal of the Flexible Hose Assembly 2765GM (2768GM) and 2766GM (2767GM)
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Disconnect the connectors (2), (5) from the swivel joints (3) and (4).
   (3) Disconnect the connector (12) from the elbow joint (11).
   (4) Remove the nuts (13), the bolts (7) and the washers (8) from the bracket (9) and the hose flange (10).
   (5) Remove the flexible hoses (6) and (1).
   (6) Put the PLUG-BLANKING in each disconnected line end.
[Rev.10 from 2021] 2026.04.01 00:45:16 UTC