W DOC AIRBUS | AMM A320F

Installation of the Secondary Hinged Fairing (That was Removed for Access Only)


TASK 32-12-13-400-002-A
Installation of the Secondary Hinged Fairing (That was Removed for Access Only)


WARNING: MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING NOTICES ARE IN POSITION.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)
No specific
AR
SAFETY BARRIER(S)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 0.34 and 0.28 m.daN (30.09 and 24.78 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.06ABA1)
Polysulfide Sealant-Fuel Tank Brushable -
(Material No.06AEA1)
Polysulfide Sealant-Low Adhesion Brushable -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
4
COTTER PIN
AIPC 52-81-11-01-010
8
COTTER PINS
AIPC 52-81-11-01-010
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 32-00-00-481-001-A
Installation of the Safety Devices on the Landing Gears
TASK 32-00-00-860-001-A
Flight Configuration Precautions with Electrical Power
TASK 32-00-00-860-002-A
Ground Configuration after Flight Configuration with Electrical Power
TASK 32-12-13-400-001-A
Installation of a Replacement Secondary Hinged Fairing
F Secondary Hinged Fairing ** ON A/C NOT FOR ALL
F Secondary Hinged Fairing ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 32-12-13-941-054-A
A. Safety Precautions
   (1) Make sure that the SAFETY BARRIER(S) are in position.
   (2) Make sure that the ground safety locks are installed on the landing gear (Ref. AMM TASK 32-00-00-481-001).
   (3) On panel 400VU:
  • Make sure that the landing-gear control-lever 6GA is in the DOWN position
  • Make sure that the WARNING NOTICE(S) is in the cockpit to tell persons not to operate the landing gear.
   (4) On panel 110VU, make sure that the GRAVITY GEAR EXTN handle is folded into the center console.
   (5) Make sure that the WARNING NOTICE(S) is in position at the ground door opening panel, to tell persons not to operate the landing gear doors.
   (6) Make sure that the ACCESS PLATFORM 3M (10 FT) is in position below the applicable MLG.
Subtask 32-12-13-860-056-A
B. Aircraft Maintenance Configuration
   (1) If the electrical power is not necessary for the other maintenance tasks:
     (a) Make sure that the aircraft electrical circuits are de-energized
(Ref. AMM TASK 24-41-00-862-002).
NOTE: It is not necessary to operate the LGCIU circuit breakers.
   (2) If the electrical power is necessary:
     (a) Make sure that you obey the flight configuration precautions (Ref. AMM TASK 32-00-00-860-001) before you open the LGCIU circuit breakers.
Subtask 32-12-13-865-059-A
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
** ON A/C NOT FOR ALL
121VULGCIU/BAT SPLY/SYS259GAR33
121VULGCIU/BAT SPLY/SYS158GAR32
** ON A/C ALL
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
** ON A/C NOT FOR ALL
121VULGCIU/BAT SPLY/SYS259GAR32
121VULGCIU/BAT SPLY/SYS158GAR31
4. Procedure
Subtask 32-12-13-420-053-A
A. Preparation for Installation
WARNING: USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
   (1) Make sure that the lockwire on the actuating rod locknuts is satisfactory. If it is unsatisfactory, install a replacement secondary-hinged fairing (Ref. AMM TASK 32-12-13-400-001).
   (2) Clean the component interface and/or the adjacent area with a Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (3) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (4) Do an inspection of the component interfaces and the adjacent area.
   (5) Remove the nut (5) and the bolt (7) from the secondary hinged fairing (2).
   (6) Apply Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) to the interface of the hinge (1) and the secondary hinged fairing (2).
   (7) Apply Polysulfide Sealant-Fuel Tank Brushable - (Material No.06ABA1) to the bolts (7) and (10). Do not apply sealants to the threads or the end of the bolts.
Subtask 32-12-13-420-054-A
B. Installation of the Secondary Hinged Fairing
   (1) Hold the secondary hinged fairing (2) in the correct position and install the bolts (10) and the nuts (9).
   (2) Install the bolt (7), the bonding tag (6) and the nut (5).
   (3) Install, bond and seal the bonding tag (6) to the hinge (1) (Ref. AMM TASK 20-28-00-912-802).
   (4) TORQUE the nuts (5) and (9) to between 0.34 and 0.28 m.daN (30.09 and 24.78 lbf.in ) T.
   (5) Safety the nut (5) with a new
AIPC 52-81-11-01-010 COTTER PIN (4).
   (6) Safety the nuts (9) with the new
AIPC 52-81-11-01-010 COTTER PINS (8).
Subtask 32-12-13-865-060-A
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
** ON A/C NOT FOR ALL
121VULGCIU/BAT SPLY/SYS259GAR33
121VULGCIU/BAT SPLY/SYS158GAR32
** ON A/C ALL
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
** ON A/C NOT FOR ALL
121VULGCIU/BAT SPLY/SYS259GAR32
121VULGCIU/BAT SPLY/SYS158GAR31
5. Close-up
Subtask 32-12-13-860-057-A
Subtask 32-12-13-942-055-A
B. Removal of Equipment
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the SAFETY BARRIER(S).
   (3) Remove the access platform(s).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
[Rev.10 from 2021] 2026.04.01 00:41:21 UTC