1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
210
CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-32-00-860-008-A
Procedure to Get Access to the SYSTEM REPORT/TEST/INST Page
TASK 31-60-00-860-001-A
EIS Start Procedure
TASK 31-60-00-860-002-A
EIS Stop Procedure
3. Job Set-up
Subtask 31-60-00-860-081-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002)
   (2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001)
   (3) On the MCDU, get the SYSTEM REPORT/TEST INST menu page (Ref. AMM TASK 31-32-00-860-008)
Subtask 31-60-00-865-064-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUEIS/ECAM/CTL/PNL15WTE12
49VUEIS/DMC1/SPLY10WT1E11
49VUEIS/DMC3/STBY/SPLY14WT1E10
49VUEIS/DMC1/SWTG21WT1E09
49VUEIS/DMC3/SWTG21WT3E07
49VUEIS/ECAM DU/UPPER/SWTG24WT1E06
49VUEIS/ECAM DU/UPPER/SPLY13WT1E05
49VUEIS/PFD CAPT/SWTG22WT1E04
49VUEIS/PFD/CAPT/SPLY11WT1E03
49VUEIS/ND CAPT/SWTG23WT1E02
49VUEIS/ND CAPT/SPLY12WT1E01
121VUEIS/DMC3/SPLY10WT3Q09
121VUEIS/DMC2/SPLY10WT2Q08
121VUEIS/ECAM DU/LOWER/SPLY13WT2R11
121VUEIS/ECAM DU/LOWER/SWTG24WT2R10
121VUEIS/DMC2/SWTG21WT2R08
121VUEIS/ND/F/O/SWTG23WT2R06
121VUEIS/PFD/F/O/SWTG22WT2R05
121VUEIS/ND/F/O12WT2R04
121VUEIS/PFD/F/O11WT2R03
122VUELEC/AC/BUS1/CTL17XN1V25
4. Procedure
Subtask 31-60-00-740-060-A ** ON A/C NOT FOR ALL
A. DU BRIGHTHNESS TEST of the DMC1
ACTION
RESULT
1.On the MCDU:
  • push the line key adjacent to the EIS1 indication
  • the DMC 1 main menu page comes into view
  • push the line key adjacent to the SWTG/BUS/DU TESTS indication
  • the DMC 1 SWITCHING/DATA BUS AND DU BRIGHTNESS TESTS page comes into view
  • push the line key adjacent to the DU BRIGHTNESS TEST indication
  • the DMC 1 DU BRIGHTNESS TEST page comes into view and obey the intructions such as INITIAL CONDITIONS: MAKE SURE THAT ALL DU ARE ON...
  • push the line key adjacent to the ACCESS TEST indication
  • the DMC 1 DU BRIGHTNESS TEST page comes into view
  • push the line key adjacent to PFD CAPT (ND CAPT, EWD or SD) indication
  • the DMC 1 DU BRIGTHNESS TEST PFD CAPT (ND CAPT, EWD, or SD) page comes into view
NOTE: The test is only possible for the DU shown with a prompt ">" (ND CAPT, PFD CAPT, EWD or SD)
  • the TEST IN PROGRESS 90s indication comes into view
NOTE: The selection of a DU related to a DMC that is not in operation, gives the TEST NOT POSSIBLE FROM THE DMC X white message.
NOTE: The selection of a DU related to a DMC that is in operation, gives a high-level intensity signal during the test (no action is necessary).
  • the TEST OK white message comes into view
  • push the line key adjacent to the RETURN indication
  • the SYSTEM REPORT/TEST INST menu page comes into view
NOTE: If the backlight temperature is not correct, the TEST NOT AVAILABLE... WAIT FOR MAX XX MINUTES amber message comes into view.
Subtask 31-60-00-740-061-A ** ON A/C NOT FOR ALL
B. DU BRIGHTHNESS TEST of the DMC 2
ACTION
RESULT
1.On the MCDU:
  • push the line key adjacent to the EIS2 indication
  • the DMC 2 main menu page comes into view
  • push the line key adjacent to the SWTG/BUS/DU TESTS indication
  • the DMC 2 SWITCHING/DATA BUS AND DU BRIGHTNESS TESTS page comes into view
  • push the line key adjacent to the DU BRIGHTNESS TEST indication
  • the DMC 2 DU BRIGHTNESS TEST page comes into view and obey the intructions such as INITIAL CONDITIONS: MAKE SURE THAT ALL DU ARE ON...
  • push the line key adjacent to the ACCESS TEST indication
  • the DMC 2 DU BRIGHTNESS TEST page comes into view
  • press the line key adjacent to the PFD CAPT (ND CAPT, EWD, SD, PFD F/O or ND F/O) indication
  • the DMC 2 DU BRIGTHNESS TEST PFD CAPT (ND CAPT, EWD, SD PFD F/O or ND F/O) page comes into view
NOTE: The test is only possible for the DU shown with a prompt ">" (ND F/O, PFD F/O)
  • the TEST IN PROGRESS 90s indication comes into view
NOTE: The selection of a DU related to a DMC that is not in operation, gives the TEST NOT POSSIBLE FROM THE DMC X white message.
NOTE: The selection of a DU related to a DMC that is in operation, gives a high-level intensity signal during the test (no action is necessary).
  • the TEST OK white message comes into view
  • push the line key adjacent to the RETURN indication
  • the SYSTEM REPORT/TEST INST menu page comes into view
NOTE: If the backlight temperature is not correct, the TEST NOT AVAILABLE... WAIT FOR MAX XX MINUTES amber message comes into view.
Subtask 31-60-00-740-062-A ** ON A/C NOT FOR ALL
C. DU BRIGHTHNESS TEST of the DMC 3
ACTION
RESULT
1.On the MCDU:
  • push the line key adjacent to the EIS 3 indication
  • the DMC 3 main menu page comes into view
  • push the line key adjacent to the SWTG/BUS/DU TESTS indication
  • the DMC 3 SWITCHING/DATA BUS AND DU BRIGHTNESS TESTS page comes into view
  • push the line key adjacent to the DU BRIGHTNESS TEST indication
  • the DMC 3 DU BRIGHTNESS TEST page comes into view with the EFIS DUs
  • push the line key adjacent to the EFIS CAPT AND ECAM DU (EFIS F/O DU) indication
  • the DMC 3 DU BRIGTHNESS TEST page comes into view and obey the intructions such as INITIAL CONDITIONS: MAKE SURE THAT ALL DU ARE ON...
  • push the line key adjacent to the ACCESS TEST indication
  • the DMC 3 DU BRIGHTNESS TEST page comes into view
  • push the line key adjacent to the PFD CAPT (ND CAPT, EWD, SD, PFD F/O or ND F/O) indication
  • the DMC 3 DU BRIGTHNESS TEST PFD CAPT (ND CAPT, EWD, SD, PFD F/O or ND F/O ) page comes into view
NOTE: The test is only possible for the DU shown with a prompt ">" (ND CAPT, PFD CAPT, EWD, SD, PFD F/O or ND F/O)
  • the TEST IN PROGRESS 90s indication comes into view
NOTE: The selection of a DU related to a DMC that is not in operation, gives the TEST NOT POSSIBLE FROM THE DMC X white message.
NOTE: The selection of a DU related to a DMC that is in operation, gives a high-level intensity signal during the test (no action is necessary).
  • the TEST OK white message comes into view
  • push the line key adjacent to the RETURN indication
NOTE: If the backlight temperature is not correct, the TEST NOT AVAILABLE... WAIT FOR MAX XX MINUTES amber message comes into view.

Subtask 31-60-00-740-060-C
DELETED
Subtask 31-60-00-740-061-C
DELETED
Subtask 31-60-00-740-062-C
DELETED
5. Close-up
Subtask 31-60-00-860-082-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
   (1) On the MCDU, push the line key adjacent to the RETURN indication until the MAINTENANCE MENU 1/2 page comes into view
   (2) Do the EIS Stop Procedure (Ref. AMM TASK 31-60-00-860-002)
   (3) On the MCDU, set the BRT knob to OFF
   (4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002)
   (5) Make sure that the work area is clean and clear of tools and other items.