Operational Check of CVDR via MCDU
TASK 31-39-00-710-810-A
Operational Check of CVDR via MCDU
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 31-39-00-861-057-A ** ON A/C NOT FOR ALL
Subtask 31-39-00-710-065-A ** ON A/C NOT FOR ALL
Subtask 31-39-00-862-058-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 08:31:29 UTC
Operational Check of CVDR via MCDU
ZONE: 210
FIN: 3CA1 ** ON A/C NOT FOR ALL
FIN: 3CA2 ** ON A/C NOT FOR ALL
FIN: 4TU ** ON A/C NOT FOR ALL
FIN: 5TU ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 3CA1 ** ON A/C NOT FOR ALL
FIN: 3CA2 ** ON A/C NOT FOR ALL
FIN: 4TU ** ON A/C NOT FOR ALL
FIN: 5TU ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 31-39-00-861-057-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
Subtask 31-39-00-865-065-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AUTO FLT/MCDU/1 | 11CA1 | B01 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | RCDR1 CVR&FDR | 40TU | E14 |
| 49VU | RCDR CTL | 41TU | E13 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AUTO FLT/MCDU/1 | 11CA1 | H07 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | CFDS/CFDIU/SPLY | 2TW | J18 |
| 121VU | CFDS/CFDIU/BACK/UP | 8TW | J17 |
| 121VU | RCDR/ACCLRM | 9TU | K18 |
| 121VU | RCDR2 CVR&FDR | 42TU | K16 |
| 121VU | AIDS & RCDR/FDIMU | 5TV | K15 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | AUTO FLT/MCDU/2 | 11CA2 | N20 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | CFDS/CFDIU/SPLY | 2TW | J41 |
| 121VU | CFDS/CFDIU/BACK/UP | 8TW | J40 |
| 121VU | RCDR/ACCLRM | 9TU | K41 |
| 121VU | RCDR2 CVR&FDR | 42TU | K39 |
| 121VU | AIDS & RCDR/FDIMU | 5TV | K38 |
Subtask 31-39-00-710-065-A ** ON A/C NOT FOR ALL
A. Operational Check of the CVDR System through the MCDU
5. Close-upNOTE: You can print the available information only when the PRINT> indication shows on the MCDU screen.
| ACTION | RESULT |
|---|---|
| 1.On overhead panel 21VU: | On overhead panel 21VU: |
|
|
| 2.On the MCDU front panel: | On the MCDU front panel: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 3.On overhead panel 21VU: | On overhead panel 21VU: |
|
|
Subtask 31-39-00-862-058-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
DFDRS TEST