Installation of the Heater Elements
TASK 30-72-51-400-001-A
Installation of the Heater Elements
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 30-72-51-860-050-B ** ON A/C NOT FOR ALL
Subtask 30-72-51-140-050-A ** ON A/C NOT FOR ALL
Subtask 30-72-51-410-053-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 00:32:23 UTC
Installation of the Heater Elements
WARNING:
DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
- FLUSH IT AWAY WITH CLEAN WATER
- GET MEDICAL AID.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM THE MATERIAL MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
FIN: 21DV ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | 1 | ELEC CONTACTS INSERTION EXTRACTION TOOL M15570-20 |
| No specific | 1 | SCRAPER - NON METALLIC |
| No specific | 1 | SPRAY - COOLING |
| No specific | AR | TIE WRAP(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.04QAB2) | Coating_- Flexible Structure |
| (Material No.06AEB2) | Polysulfide Sealant-Low Adhesion Fillet Structure |
| (Material No.06LCG9) | Non Hardening Jointing Putty-Medium Temp. Area - - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 162DW, 172AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-16-38-613-001-A | Servicing of the Toilet System |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 25-55-12-000-003-A | Removal of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65 |
| TASK 25-55-12-400-003-A | Installation of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65 |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 30-72-51-860-050-B ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the toilet system (Ref. AMM TASK 12-16-38-613-001) is drained.
(3) Make sure that an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the waste-water service-panel and the access door 172AR is open.
(4) Make sure that the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) is open.
(5) Make sure that the CARGO COMP LT switch 8LU is set to ON.
(6) Make sure that the partition 162DW is removed to get access to the nipple(s) and the terminal block 7585VT (Ref. AMM TASK 25-55-12-000-003).
Subtask 30-72-51-865-056-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the toilet system (Ref. AMM TASK 12-16-38-613-001) is drained.
(3) Make sure that an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the waste-water service-panel and the access door 172AR is open.
(4) Make sure that the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001) is open.
(5) Make sure that the CARGO COMP LT switch 8LU is set to ON.
(6) Make sure that the partition 162DW is removed to get access to the nipple(s) and the terminal block 7585VT (Ref. AMM TASK 25-55-12-000-003).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | POT WIP-SVCE-PNL | 15DV | D01 |
| 2001VU | WASTE WIP-HEATER-LINE | 31DU | E04 |
Subtask 30-72-51-140-050-A ** ON A/C NOT FOR ALL
A. Preparation for installation of Waste Water Heated Drain Nipple
(1) Remove the unwanted sealant with a SCRAPER - NON METALLIC.
(2) Clean the component interface and/or the adjacent area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Do an inspection of the component interfaces and the adjacent area.
Subtask 30-72-51-420-050-B ** ON A/C NOT FOR ALL (1) Remove the unwanted sealant with a SCRAPER - NON METALLIC.
(2) Clean the component interface and/or the adjacent area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Do an inspection of the component interfaces and the adjacent area.
B. Installation of the Waste Water Heated Drain Nipple
(1) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the screws (6) and (8).
(2) Put the drain nipple (5) and the insulation plate (4) in position.
(3) Install the drain nipple (5) with the screws (6), the washers (3) and the nuts (2).
(4) Remove the PLUG-BLANKING from each disconnected line end.
(5) Install the flush water pipe (1) to the drain nipple (5).
(6) Install the cap assembly (7) with the screws (8), the spacers (9), the washers (10), the nuts (11) on the drain nipple (5).
(7) Connect the electrical contacts with the ELEC CONTACTS INSERTION EXTRACTION TOOL M15570-20 to terminal block 7585VT (12).
(8) Attach the electrical harness with TIE WRAP(S).
Subtask 30-72-51-914-050-A ** ON A/C NOT FOR ALL (1) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the screws (6) and (8).
(2) Put the drain nipple (5) and the insulation plate (4) in position.
(3) Install the drain nipple (5) with the screws (6), the washers (3) and the nuts (2).
(4) Remove the PLUG-BLANKING from each disconnected line end.
(5) Install the flush water pipe (1) to the drain nipple (5).
(6) Install the cap assembly (7) with the screws (8), the spacers (9), the washers (10), the nuts (11) on the drain nipple (5).
(7) Connect the electrical contacts with the ELEC CONTACTS INSERTION EXTRACTION TOOL M15570-20 to terminal block 7585VT (12).
(8) Attach the electrical harness with TIE WRAP(S).
C. Application of Sealant for Waste Water Heated Drain Nipple
(1) Apply Polysulfide Sealant-Low Adhesion Fillet Structure (Material No.06AEB2) around the drain nipple (5).
(2) Make the sealant around the drain nipple (5) smooth.
(3) Let the sealant cure.
(4) Apply Coating_- Flexible Structure (Material No.04QAB2) to the sealant around the drain nipple (5).
Subtask 30-72-51-861-052-A ** ON A/C NOT FOR ALL Subtask 30-72-51-865-057-A ** ON A/C NOT FOR ALL (1) Apply Polysulfide Sealant-Low Adhesion Fillet Structure (Material No.06AEB2) around the drain nipple (5).
(2) Make the sealant around the drain nipple (5) smooth.
(3) Let the sealant cure.
(4) Apply Coating_- Flexible Structure (Material No.04QAB2) to the sealant around the drain nipple (5).
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 30-72-51-710-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | POT WIP-SVCE-PNL | 15DV | D01 |
| 2001VU | WASTE WIP-HEATER-LINE | 31DU | E04 |
F. Do this test for Waste Water Heated Drain Nipple
Subtask 30-72-51-720-050-A ** ON A/C NOT FOR ALL NOTE: The control unit 35DU controls and monitors heaters of the water servicing ice-protection and of the waste-water ice-protection. The result of HTRs of the waste water ice-protection system are indicated in parentheses, because the principal interest of this test is the waste water servicing ice-protection.
| ACTION | RESULT |
|---|---|
1.On the control unit 35DU:
| On the control unit 35DU:
|
|
|
G. Do this test:
5. Close-up| ACTION | RESULT |
|---|---|
| 1.On the Flight Attendant Panel (FAP) 120RH: | On the FAP 120RH: |
|
|
| 2.At the Forward (Aft) toilet service-panel: | At the Forward (Aft) toilet service-panel: |
|
|
| 3.On the FAP 120RH: | On the FAP 120RH: |
|
|
| | At the Forward (Aft) toilet service-panel:
|
Subtask 30-72-51-410-053-B ** ON A/C NOT FOR ALL
A. Close Access
(1) For Waste Water Heated Drain Nipple (21DV).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install the partition 162DW (Ref. AMM TASK 25-55-12-400-003).
(4) Set the CARGO COMP LT switch 8LU to OFF.
(5) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(6) Close the waste water service-panel 172AR.
(7) Remove the access platform.
Subtask 30-72-51-862-051-A ** ON A/C NOT FOR ALL (1) For Waste Water Heated Drain Nipple (21DV).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install the partition 162DW (Ref. AMM TASK 25-55-12-400-003).
(4) Set the CARGO COMP LT switch 8LU to OFF.
(5) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(6) Close the waste water service-panel 172AR.
(7) Remove the access platform.
Heater Element