Check of the Operation of the Probe Heating Channel
TASK 30-31-00-040-001-A
Check of the Operation of the Probe Heating Channel
MMEL 30-31-01A
PROBE HEAT COMPUTER (PHC)
Check of the associated heating channel.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 30-31-00-941-052-A
5. Close-up
Subtask 30-31-00-860-063-A
[Rev.10 from 2021]
2026.04.01 00:30:41 UTC
Check of the Operation of the Probe Heating Channel
WARNING:
DO NOT TOUCH THE PROBES IMMEDIATELY AFTER THE TEST.
THEY ARE HOT AND CAN BURN YOU.
CAUTION:
REMOVE THE PROTECTIVE COVERS FROM THE PROBES BEFORE YOU DO THE TEST.
CAUTION:
DO NOT CONTINUE THE TEST FOR MORE THAN ONE MINUTE TO PREVENT DAMAGE TO THE PROBES.
1. Reason for the JobMMEL 30-31-01A
PROBE HEAT COMPUTER (PHC)
Check of the associated heating channel.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT) |
| No specific | AR | THERMOMETER |
| No specific | AR | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 30-31-00-941-052-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Put an ACCESS PLATFORM 3M (10 FT) in position near each probe.
(3) On the panel 25VU:
(Ref. AMM TASK 31-60-00-860-001).
4. Procedure(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Put an ACCESS PLATFORM 3M (10 FT) in position near each probe.
(3) On the panel 25VU:
- make sure that the PROBE/WINDOW HEAT pushbutton switch is released (the ON legend is off).
(Ref. AMM TASK 31-60-00-860-001).
WARNING:
DO NOT TOUCH THE PROBES IMMEDIATELY AFTER THE TEST.
THEY ARE HOT AND CAN BURN YOU.
Subtask 30-31-00-860-072-A A. Aircraft Maintenance Configuration
(1) On the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons that a flight configuration will be simulated.
Subtask 30-31-00-865-058-A (1) On the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons that a flight configuration will be simulated.
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 30-31-00-040-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 49VU | FWS/FWC1/SPLY | 3WW | F01 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| 121VU | EIS/FWC2/SPLY | 2WW | Q07 |
| FOR FIN: 6DA1 (PHC1) | |||
| 49VU | ANTI ICE/PROBES/AOA/1 | 4DA1 | D04 |
| 49VU | ANTI ICE/PROBES/PHC/1 | 2DA1 | D03 |
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
| 122VU | ANTI ICE/PROBES/1/TAT | 1DA1 | Z12 |
| FOR FIN: 6DA2 (PHC2) | |||
| 122VU | ANTI ICE/PROBES/2/TAT | 1DA2 | Y15 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/AOA | 4DA2 | Y13 |
| 122VU | ANTI ICE/PROBES/PHC/2 | 2DA2 | Y12 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| FOR FIN: 6DA3 (PHC3) | |||
| 122VU | ANTI ICE/PROBES/PHC/3 | 2DA3 | Y16 |
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/AOA | 4DA3 | Z15 |
| 122VU | ANTI ICE/PROBES/3/STATIC | 5DA3 | Z14 |
CAUTION:
DO NOT CONTINUE THE TEST FOR MORE THAN ONE MINUTE TO PREVENT DAMAGE TO THE PROBES.
C. Check of the Probe Heating | ACTION | RESULT |
|---|---|
1.On the overhead circuit-breaker panel 49VU:
| On the lower ECAM DU:
NOTE: Ignore the aural warning message. |
2.On the panel 49VU:
| On the lower ECAM DU:
|
| 3.Make sure that the heating of the probes related to the unserviceable PHC, is in operation. For 6DA1 PHC-1 - 7DA1, 8DA1, 9DA1, 3FP1, 11FP1 For 6DA2 PHC-2 - 7DA2, 8DA2, 9DA2, 3FP2, 11FP2 For 6DA3 PHC-3 - 7DA3, 8DA3, 9DA3, 3FP3. NOTE: You can use a THERMOMETER which can read up to 400 deg.C (752.00 deg.F) to do this check. | On the upper ECAM DU:
|
On the lower ECAM DU:
| On the lower ECAM DU, if the AC GEN indication comes into view:
|
| | On the lower ECAM DU, if the AIR BLEED indication comes into view:
|
On the panel 49VU:
| On the lower ECAM DU:
|
Subtask 30-31-00-860-063-A
A. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(3) Make an entry in the logbook.
(4) Remove the warning notice(s).
(1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(3) Make an entry in the logbook.
(4) Remove the warning notice(s).