Installation of the Accumulator-Gas Charging Valve
TASK 29-13-22-400-001-A
Installation of the Accumulator-Gas Charging Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 29-13-22-860-051-A
Subtask 29-13-22-420-050-B
Subtask 29-13-22-860-053-A
[Rev.10 from 2021]
2026.04.01 07:53:50 UTC
Installation of the Accumulator-Gas Charging Valve
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| (Material No.14CCB6) | Testing Medium-Leak Detection - Oxygen System |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 196 | HYDRAULIC COMPT AND FAIRINGS |
| 196BB |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 3 | 0-RING | AIPC 29-14-14-01-010 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 12-14-29-614-001-A | Fill the Hydraulic Power Accumulators with Nitrogen |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-863-002-A | Pressurize the Yellow Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-860-002-A | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
Subtask 29-13-22-860-051-A
A. Aircraft Maintenance Configuration
(2) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Yellow hydraulic system:
(Ref. AMM TASK 29-00-00-864-001).
(4) Make sure that the reservoir of the Yellow hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the access door 196BB is open.
(6) Make sure that the isolation coupling of the Power Transfer Unit (PTU) is disconnected (Ref. AMM TASK 29-23-00-860-001).
Subtask 29-13-22-865-051-A WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Yellow hydraulic system:
- In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panel of the Yellow hydraulic system.
(Ref. AMM TASK 29-00-00-864-001).
(4) Make sure that the reservoir of the Yellow hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the access door 196BB is open.
(6) Make sure that the isolation coupling of the Power Transfer Unit (PTU) is disconnected (Ref. AMM TASK 29-23-00-860-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST | 1881GP | N35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
Subtask 29-13-22-420-050-B
A. Installation of the Gas Charging-Valve (3071GM)
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the PLUG - BLANKING from the adapter (2).
(4) Remove the CAP - BLANKING from the gas charging-valve (4).
(5) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the threads of the gas charging-valve connection.
(6) Make sure that the 0-ring seal (3) is installed on the gas charging-valve (4).
(7) If the removed charging-valve (4) is to be installed, remove the used 0-ring seal (3) and install the new AIPC 29-14-14-01-010 0-RING (3).
(8) Install the gas charging-valve (4) on the adapter (2).
(9) TORQUE the gas charging-valve (4) to between 3.44 and 3.34 m.daN (25.37 and 24.63 lbf.ft )
.
(10) Safety the gas charging-valve (4) with the lockwire14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
Subtask 29-13-22-860-052-A (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the PLUG - BLANKING from the adapter (2).
(4) Remove the CAP - BLANKING from the gas charging-valve (4).
(5) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the threads of the gas charging-valve connection.
(6) Make sure that the 0-ring seal (3) is installed on the gas charging-valve (4).
(7) If the removed charging-valve (4) is to be installed, remove the used 0-ring seal (3) and install the new AIPC 29-14-14-01-010 0-RING (3).
(8) Install the gas charging-valve (4) on the adapter (2).
(9) TORQUE the gas charging-valve (4) to between 3.44 and 3.34 m.daN (25.37 and 24.63 lbf.ft )
.(10) Safety the gas charging-valve (4) with the lockwire
B. Preparation for the Test
(1) Fill the accumulator with nitrogen (Ref. AMM TASK 12-14-29-614-001).
(2) Close the gas charging-valve nut (5).
(3) TORQUE the gas charging-valve nut (5) to between 60.00 and 50.00 lbf.in (0.68 and 0.57 m.daN )
.
(4) Install the endcap (6) on the gas charging-valve (4).
(5) Remove the WARNING NOTICE(S).
(6) Pressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(7) Make sure that the fluid level in the reservoir of the Yellow hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(8) Pressurize the Yellow hydraulic system (Ref. AMM TASK 29-10-00-863-002).
Subtask 29-13-22-790-050-A (1) Fill the accumulator with nitrogen (Ref. AMM TASK 12-14-29-614-001).
(2) Close the gas charging-valve nut (5).
(3) TORQUE the gas charging-valve nut (5) to between 60.00 and 50.00 lbf.in (0.68 and 0.57 m.daN )
. (4) Install the endcap (6) on the gas charging-valve (4).
(5) Remove the WARNING NOTICE(S).
(6) Pressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(7) Make sure that the fluid level in the reservoir of the Yellow hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(8) Pressurize the Yellow hydraulic system (Ref. AMM TASK 29-10-00-863-002).
C. Test
(1) Apply the leak detector Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) to the connections of the charging-valve (4), the adapter (2) and the endcap (6). Make sure that there are no leaks.
5. Close-up(1) Apply the leak detector Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) to the connections of the charging-valve (4), the adapter (2) and the endcap (6). Make sure that there are no leaks.
Subtask 29-13-22-860-053-A
A. Connect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-002).
Subtask 29-13-22-410-050-A B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 196BB.
Subtask 29-13-22-865-052-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 196BB.
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST | 1881GP | N35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
Gas Charging Valve