Installation of the Fluid Sampling Valve of the Green Hydraulic System
TASK 29-11-34-400-001-A
Installation of the Fluid Sampling Valve of the Green Hydraulic System
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 29-11-34-860-051-A
Subtask 29-11-34-420-050-B
Subtask 29-11-34-860-052-A
[Rev.10 from 2021]
2026.04.01 07:56:27 UTC
Installation of the Fluid Sampling Valve of the Green Hydraulic System
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 147 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| 148 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| 197CB |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 2 | O-RING | AIPC 29-11-14-02-320 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-863-001-A | Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-860-002-A | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 29-23-00-864-001-A | Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
Subtask 29-11-34-860-051-A
A. Aircraft Maintenance Configuration
(2) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Green hydraulic system:
(Ref. AMM TASK 29-00-00-864-001).
(4) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the left main door of the main gear is open (Ref. AMM TASK 32-12-00-010-001).
(6) Make sure that the access door 197CB is open.
(7) Make sure that the ACCESS PLATFORM 3M (10 FT) is in position.
(8) Make sure that the CONTAINER - HYDRAULIC FLUID RESISTANT is in position below the manifold.
(9) Make sure that the isolation coupling of the Power Transfer Unit (PTU) is disconnected (Ref. AMM TASK 29-23-00-860-001).
Subtask 29-11-34-865-051-A WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002). (2) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Green hydraulic system:
- In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panel of the Green hydraulic system.
(Ref. AMM TASK 29-00-00-864-001).
(4) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
(5) Make sure that the left main door of the main gear is open (Ref. AMM TASK 32-12-00-010-001).
(6) Make sure that the access door 197CB is open.
(7) Make sure that the ACCESS PLATFORM 3M (10 FT) is in position.
(8) Make sure that the CONTAINER - HYDRAULIC FLUID RESISTANT is in position below the manifold.
(9) Make sure that the isolation coupling of the Power Transfer Unit (PTU) is disconnected (Ref. AMM TASK 29-23-00-860-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | H12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | R35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LOW/LVL/IND | 1832GQ | N32 |
| 121VU | HYDRAULIC/HYD/QTY/IND | 1831GQ | P35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R33 |
Subtask 29-11-34-420-050-B
A. Installation of the Fluid Sampling Valve
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking plugs from the fluid sampling valve (1) and the manifold.
(4) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the threads of the fluid sampling valve (1) and to the new AIPC 29-11-14-02-320 O-RING (2).
(5) Put the O-ring (2) in position on the fluid sampling valve (1).
(6) Install the fluid sampling valve (1) on the manifold.
(7) TORQUE the fluid sampling valve (1) to between 18.5 and 17.5 m.N (13.64 and 12.91 lbf.ft )
.
(8) Make sure that the protective cap of the fluid sampling valve is tight.
14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
Subtask 29-11-34-790-050-B (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking plugs from the fluid sampling valve (1) and the manifold.
(4) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the threads of the fluid sampling valve (1) and to the new AIPC 29-11-14-02-320 O-RING (2).
(5) Put the O-ring (2) in position on the fluid sampling valve (1).
(6) Install the fluid sampling valve (1) on the manifold.
(7) TORQUE the fluid sampling valve (1) to between 18.5 and 17.5 m.N (13.64 and 12.91 lbf.ft )
. (8) Make sure that the protective cap of the fluid sampling valve is tight.
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(9) Safety the protective cap to the valve body and the valve body to the manifold with lockwire B. Test
(1) Pressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(2) Make sure that the fluid level in the reservoir of the Green hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(3) Pressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001).
(4) Examine the connection of the fluid sampling valve (1) and the manifold and make sure that there are no leaks.
(5) Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001) or (Ref. AMM TASK 29-23-00-864-001).
5. Close-up(1) Pressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(2) Make sure that the fluid level in the reservoir of the Green hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
(3) Pressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001).
(4) Examine the connection of the fluid sampling valve (1) and the manifold and make sure that there are no leaks.
(5) Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001) or (Ref. AMM TASK 29-23-00-864-001).
Subtask 29-11-34-860-052-A
A. Put the aircraft back to the serviceable condition.
(1) Connect the isolation coupling of the power transfer unit (PTU) (Ref. AMM TASK 29-23-00-860-002).
(2) Remove the container.
(3) Remove the warning notices from the cockpit and the ground service panel.
Subtask 29-11-34-410-051-A (1) Connect the isolation coupling of the power transfer unit (PTU) (Ref. AMM TASK 29-23-00-860-002).
(2) Remove the container.
(3) Remove the warning notices from the cockpit and the ground service panel.
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the main door of the main gear (Ref. AMM TASK 32-12-00-410-001).
(3) Close the access door 197CB.
Subtask 29-11-34-865-052-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the main door of the main gear (Ref. AMM TASK 32-12-00-410-001).
(3) Close the access door 197CB.
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | H12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | R35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LOW/LVL/IND | 1832GQ | N32 |
| 121VU | HYDRAULIC/HYD/QTY/IND | 1831GQ | P35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R33 |
Fluid Sampling Valve on HP Manifold with P/N series 1559A9900