W DOC AIRBUS | AMM A320F

Installation of the Hydraulic Motor of the Flap Power Control-Unit without the Pressure-Off Brake and the Valve Block Assembly


TASK 27-54-54-400-002-A
Installation of the Hydraulic Motor of the Flap Power Control-Unit without the Pressure-Off Brake and the Valve Block Assembly


WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 3M (10 FT)
No specific
1
CONTAINER 5 L (1.32 USGAL)
No specific
1
WARNING NOTICE(S)
No specific
Torque wrench: range to between 0.96 and 0.87 m.daN (84.96 and 76.99 lbf.in ) T
No specific
Torque wrench: range to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) T
98D27803000000
1
LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
(Material No.03FCC2)
Mineral Oil base Grease-Anti-seize Lithium Thickened System
(Material No.03JAB1)
Silicone base Grease-- Paste -
(Material No.03QBA1)
Dry lubricant-General Assembly - -
(Material No.06LGB1)
Non Hardening Jointing Putty-- Electrical Conductive -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14FAB1)
Abrasive-- Scotch Brite Pads -
(Material No.14SBA1)
Textile-Lint free Cotton -
(Material No.14VGE1)
Individual Compound-- Zinc Powder -
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
1
PACKING
AIPC 27-54-51-01-070
6
RETAINERS
AIPC 27-54-51-01-150
7
PACKINGS
AIPC 27-54-51-01-160
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 12-12-29-611-002-A
Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart
TASK 27-00-00-080-002-A
Removal of the Flap/Slat Control-Lever Locking Tool (98D27803000000)
TASK 27-00-00-480-002-A
Installation of the Flap/Slat Control-Lever Locking Tool (98D27803000000)
TASK 27-50-00-480-802-A
Installation/Removal of the Check Pin at Track 1
TASK 27-50-00-866-009-A
Retraction of the Flaps on the Ground
TASK 27-50-00-866-009-A-01
Retraction of the Flaps/Slats on the Ground
TASK 27-54-00-710-001-A
Operational Test of the Flap System
TASK 29-10-00-863-001-A
Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-863-002-A
Pressurize the Yellow Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-10-00-864-002-A
Depressurize the Yellow Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-14-00-614-002-A
Pressurization of the Hydraulic Reservoirs through the Ground Connector
TASK 29-14-00-614-002-A-01
Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU)
TASK 29-23-00-863-001-A
Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump
TASK 29-24-00-863-001-A
Pressurize the Yellow Hydraulic System with the Electric Pump
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
3. Job Set-up
Subtask 27-54-54-860-055-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the main doors of the main gear are open (Ref. AMM TASK 32-12-00-010-001).
   (2) Make sure that the flaps are retracted to the 0 degree position (Ref. AMM TASK 27-50-00-866-009).
   (3) Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. AMM TASK 27-00-00-480-002) is installed on the slat/flap control lever.
   (4) Make sure that the ACCESS PLATFORM 3M (10 FT) is in position at the opening of the main door of the main gear.
   (5) Make sure that the Green and Yellow hydraulic systems are depressurized and put them in the maintenance configuration (Ref. AMM TASK 29-10-00-864-001) (Ref. AMM TASK 29-10-00-864-002).
   (6) Make sure that the reservoirs of the Green and Yellow hydraulic systems are depressurized (Ref. AMM TASK 29-14-00-614-001).
   (7) Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the Green and Yellow hydraulic systems.
   (8) Make sure that the check pins are installed at the left and right flap tracks 1 (Ref. AMM TASK 27-50-00-480-802).
   (9) Make sure that a CONTAINER 5 L (1.32 USGAL) is in position below the hydraulic motor (5).
Subtask 27-54-54-865-054-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB07
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB02
** ON A/C ALL
121VUFLIGHT CONTROLS/FLP/CTL AND/MONG/SYS28CVQ21
4. Procedure
Subtask 27-54-54-910-053-A
A. Preparation for Installation
   (1) Do an inspection of the component interfaces and the adjacent area.
   (2) Use a Textile-Lint free Cotton - (Material No.14SBA1) and the Non Aqueous Cleaner-General - - (Material No.08BAA9) to clean the :
  • the mating areas of the pressure-off brake (POB)
  • the mating areas of the hydraulic motor.
   (3) Prepare a small quantity of a mixture of 58 % of Mineral Oil base Grease-Anti-seize Lithium Thickened System (Material No.03FCC2) and 42 % of Individual Compound-- Zinc Powder - (Material No.14VGE1) or use Non Hardening Jointing Putty-- Electrical Conductive - (Material No.06LGB1) .
   (4) Apply a quantity of the prepared mixture or apply Non Hardening Jointing Putty to the related electrical bonding areas (refer to the related figure):
     (a) Make sure that you apply the material on the mating areas on the POB and on the removed hydraulic motor.
   (5) Apply the Dry lubricant-General Assembly - - (Material No.03QBA1) to the splined surfaces.
   (6) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the new packing (1).
Subtask 27-54-54-420-052-A
CAUTION: USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU DO NOT USE THE SECOND WRENCH, THERE IS A RISK THAT YOU WILL LOOSEN OR TIGHTEN THE UNION TOO MUCH.
CAUTION: YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS LUBRICANT.
CAUTION: DO NOT USE POINTED, SHARP OR METAL TOOLS TO REMOVE AND INSTALL PACKINGS OR RETAINERS. ALSO MAKE SURE THAT YOU USE THE CORRECT TOOLS TO REMOVE AND INSTALL LOCKING WASHERS OR RETAINING RINGS. IF YOU DO NOT USE THE CORRECT TOOLS, YOU CAN EASILY CAUSE DAMAGE TO THESE COMPONENTS.
CAUTION: YOU MUST BE CAREFUL WHEN YOU MOVE THE TRANSFER TUBES AND THE ADJACENT COMPONENTS. IF YOU ARE NOT CAREFUL, YOU CAN EASILY CAUSE DAMAGE TO THEM.
B. Installation of the Hydraulic Motor
NOTE: The installation procedure for the hydraulic motor which is attached to the valve block 23CV is given. The installation procedure for the hydraulic motor which is attached to the valve block 24CV is almost the same. The differences in the procedures are given in the steps that follow.
   (1) Do a visual check of the transfer tubes. If you find small scratches, use Abrasive-- Scotch Brite Pads - (Material No.14FAB1) to remove them. This will make sure that the condition of the valve block transfer holes is satisfactory.
   (2) Install the new AIPC 27-54-51-01-150 RETAINERS (6) and the new AIPC 27-54-51-01-160 PACKINGS (7) on the transfer tubes (8).
   (3) Carefully apply Silicone base Grease-- Paste - (Material No.
03JAB1) to all the grooves of the two transfer tubes (8).
   (4) Install the new AIPC 27-54-51-01-070 PACKING (1) on the POB (9).
   (5) Install the hydraulic motor on the POB.
     (a) Apply the Mineral Oil base Grease-Anti-seize Lithium Thickened System (Material No.
03FCC2) to the threads of the bolts (3).
     (b) Engage the splines on the shaft of the POB (9) with those in the hydraulic motor (5).
     (c) Carefully install the hydraulic motor (5) on the transfer tubes (8).
     (d) Attach the hydraulic motor (5) to the POB (9) with the washers (2) and the bolts (3).
     (e) TORQUE the bolts (3) to between 0.96 and 0.87 m.daN (84.96 and 76.99 lbf.in ) T.
   (6) Do a bonding test between the main bonding point of the power control unit and the:
  • POB flange
  • hydraulic motor flange
The resistance must not be more than 20 milliohms.
   (7) Connect the hydraulic lines.
     (a) Remove the blanking caps from the line end (4).
     (b) Make sure that the hydraulic line end-fittings are serviceable.
     (c) Apply the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.
02ABA1) to the threads of the line end-fittings.
     (d) Connect the case drain line (4) to the hydraulic motor (5).
     (e) TORQUE the union nut of the case drain line (4) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) T.
Subtask 27-54-54-860-056-A
C. Preparation for the Test
   (1) Remove the check pins from the left and right flap tracks 1 (
Ref. AMM TASK 27-50-00-480-802).
   (2) Pressurize the reservoirs of the Green and Yellow hydraulic systems (Ref. AMM TASK 29-14-00-614-002).
   (3) Pressurize the Green and Yellow hydraulic systems (Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001) and (Ref. AMM TASK 29-24-00-863-001) or (Ref. AMM TASK 29-10-00-863-002).
   (4) Remove the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION (Ref. AMM TASK 27-00-00-080-002) from the slat/flap control lever.
   (5) Remove the WARNING NOTICE(S).
   (6) Make sure that the work area is clean and clear of tools and other items.
Subtask 27-54-54-865-055-A
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB07
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/FLP/CTL AND MONG/SYS16CVB02
** ON A/C ALL
121VUFLIGHT CONTROLS/FLP/CTL AND/MONG/SYS28CVQ21
Subtask 27-54-54-710-051-A
E. Test
   (1) Do the operational test of the flap system (Ref. AMM TASK 27-54-00-710-001).
5. Close-up
Subtask 27-54-54-860-057-A
A. Put the aircraft back to the serviceable condition.
   (1) Make sure that the level of fluid in the relevant hydraulic reservoir is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002).
   (2) Remove the container from below the hydraulic motor (5).
   (3) Remove the access platform(s).
Subtask 27-54-54-410-051-A
B. Close the main doors of the main gear (Ref. AMM TASK 32-12-00-410-001).
[Rev.10 from 2021] 2026.04.01 07:02:43 UTC