W DOC AIRBUS | AMM A320F

Installation of the Master Control Unit (MCU)


TASK 25-21-34-400-001-A
Installation of the Master Control Unit (MCU)


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 200
FIN: 100HP1 ** ON A/C NOT FOR ALL
FIN: 100HP2 ** ON A/C NOT FOR ALL
FIN: 101HP ** ON A/C NOT FOR ALL
FIN: 102HP ** ON A/C NOT FOR ALL
FIN: 55HP1 ** ON A/C NOT FOR ALL
FIN: 55HP2 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05BAB1)
Threadlocking Adhesive-- Low strength Low viscosity -
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 21-24-19-400-001-A
Installation of the Individual Air Outlet
TASK 23-73-45-400-001-A
Installation of the Passenger Service Unit
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-21-00-710-002-A
Operational Test of the In-Seat Power-Supply System (PED Power Supply)
TASK 25-21-00-740-001-A
Built-In Test Equipment (BITE) Test of the Master Control Unit (MCU)
TASK 35-21-41-400-001-A
Installation of the Emergency Oxygen Containers
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 25-21-34-861-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the door of the related overhead stowage compartment is open.
Subtask 25-21-34-865-059-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUINSEAT POWER-MCU 259HPB08
2000VUINSEAT POWER-MCU 158HPB05
** ON A/C NOT FOR ALL
2000VUSEAT POWER-MCU 259HPB08
2000VUSEAT POWER-MCU 158HPB05
4. Procedure
Subtask 25-21-34-560-051-F ** ON A/C NOT FOR ALL
A. Installation of Configuration Module(s) 100HP1 and/or 100HP2
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
   (1) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (2) Make sure that all the electrical connections are clean and in the correct condition.
   (3) Make sure that the configuration module is connected to the MCU as follows:
  • 100HP1 to 55HP1
  • 100HP2 to 55HP2.
   (4) Install the configuration module (13) to the MCU (9) and lock the fasteners (14).
Subtask 25-21-34-560-051-J ** ON A/C NOT FOR ALL
A. Installation of Configuration Module(s) 101HP and/or 102HP
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
   (1) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (2) Make sure that all the electrical connections are clean and in the correct condition.
   (3) Make sure that the configuration module is connected to the MCU as follows:
  • 101HP to 55HP1
  • 102HP to 55HP2.
   (4) Install the configuration module (12) to the MCU (8) and lock the fasteners (13).
Subtask 25-21-34-560-051-M ** ON A/C NOT FOR ALL
A. Installation of configuration module(s) 101HP and/or 102HP
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
   (1) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (2) Make sure that all the electrical connections are clean and in the correct condition.
   (3) Make sure that the configuration module(s) (13) is connected to the MCU(s) as follows:
  • 101HP to 55HP1
  • 102HP to 55HP2.
   (4) Connect the related configuration module (13) to the MCU (8).
   (5) Make sure that the clamps (12) of the related configuration module (13) are correctly locked.
Subtask 25-21-34-560-051-N ** ON A/C NOT FOR ALL
A. Installation of the configuration module 101HP and 102HP
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
   (1) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (2) Make sure that all the electrical connections are clean and in the correct condition.
   (3) Make sure that the configuration module (18) is connected to the Master Control Unit (MCU) as follows:
  • 101HP to 55HP1
  • 102HP to 55HP2.
   (4) Connect the configuration module (18)to the MCU (13).
   (5) Make sure that the clamps (17) of the configuration module (18) are correctly locked.
Subtask 25-21-34-420-050-B ** ON A/C NOT FOR ALL
B. Installation of MCU(s) 55HP1 and/or 55HP2
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
   (1) When you connect/install the components, refer to the match marks made during the removal procedure.
   (2) Put the related MCU (9) in position and install the washers (3) and the screws (4).
   (3) Install the washer (5) and the screw (6) (Ref. AMM TASK 20-28-00-912-802).
   (4) Connect the electrical connectors:
CAUTION: MAKE SURE THAT THE SPRING LATCHES CORRECTLY HOLD THE CONNECTOR IN THE FULLY ENGAGED POSITION. THE SPRING LATCHES PREVENT UNWANTED MOVEMENT OF THE CONNECTOR, AND THUS THE RISK OF ARCING, WHICH CAN CAUSE DAMAGE TO THE UNIT.
     (a) Remove the CAP-BLANKING from each electrical connector and receptacle.
     (b) Make sure that all the electrical connections are clean and in the correct condition.
     (c) Install the cap (2).
     (d) Apply Threadlocking Adhesive-- Low strength Low viscosity - (Material No.05BAB1) to the electrical connector (10).
     (e) Connect the electrical connectors (1), (10) and (11).
     (f) Engage the spring latches (12).
   (5) Put the cover (7) in position and engage the fasteners (8).
Subtask 25-21-34-420-050-F ** ON A/C NOT FOR ALL
B. Installation of Master Control Unit (MCU) 55HP1 and/or 55HP2
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
   (1) When you connect/install the components, refer to the match marks made during the removal procedure.
   (2) Put the MCU (13) in position and install the washers (12) and the screws (11).
   (3) Install the washer (10) and the screw (9) (Ref. AMM TASK 20-28-00-912-802).
   (4) Connect the electrical connectors:
CAUTION: MAKE SURE THAT THE SPRING LATCHES CORRECTLY HOLD THE CONNECTOR IN THE FULLY ENGAGED POSITION. THE SPRING LATCHES PREVENT UNWANTED MOVEMENT OF THE CONNECTOR, AND THUS THE RISK OF ARCING, WHICH CAN CAUSE DAMAGE TO THE UNIT.
     (a) Remove the CAP-BLANKING from each electrical connector and receptacle.
     (b) Make sure that all the electrical connections are clean and in the correct condition.
     (c) Apply Threadlocking Adhesive-- Low strength Low viscosity - (Material No.05BAB1) to the electrical connector (14).
     (d) Connect the electrical connectors (8), (14) and (15).
     (e) Lock the electrical connectors (15) with the spring latches (16).
   (5) Put the cover (7) in position and lock the fasteners (6).
   (6) Remove the blanking plugs from the ducts (3) and (5).
   (7) Put the clamps (4) in position.
   (8) Install the duct (3) to the ducts (5).
   (9) Tighten the clamps (4).
   (10) Put the cover (2) in position and lock the fasteners (1).
Subtask 25-21-34-420-050-G ** ON A/C NOT FOR ALL
B. Installation of MCU(s) 55HP1 and/or 55HP2
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
F Master Control Unit (MCU) ** ON A/C NOT FOR ALL
   (1) When you connect/install the components, refer to the match marks made during the removal procedure.
   (2) Put the related MCU (8) in position and install the washers (2) and the screws (3).
   (3) Install the washer (4) and the screw (5) (Ref. AMM TASK 20-28-00-912-802).
   (4) Connect the electrical connectors:
     (a) Remove the CAP-BLANKING from each electrical connector and receptacle.
     (b) Make sure that all the electrical connections are clean and in the correct condition.
     (c) Apply Threadlocking Adhesive-- Low strength Low viscosity - (Material No.05BAB1) to the related electrical connector (9).
     (d) Connect the electrical connectors (1), (9) and (10).
CAUTION: MAKE SURE THAT THE SPRING LATCHES CORRECTLY HOLD THE CONNECTOR IN THE FULLY ENGAGED POSITION. THE SPRING LATCHES PREVENT UNWANTED MOVEMENT OF THE CONNECTOR, AND THUS THE RISK OF ARCING, WHICH CAN CAUSE DAMAGE TO THE UNIT.
     (e) Lock the electrical connector(s) (10) with the spring latches (11).
   (5) Put the related cover (7) in position and lock the fasteners (6).
Subtask 25-21-34-869-050-A ** ON A/C NOT FOR ALL
C. Close the related CBs for each MCU
   (1) Make sure that you close all the related CBs for each MCU at the same time.
Subtask 25-21-34-865-054-A ** ON A/C NOT FOR ALL
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUINSEAT POWER-MCU 259HPB08
2000VUINSEAT POWER-MCU 158HPB05
** ON A/C NOT FOR ALL
2000VUSEAT POWER-MCU 259HPB08
2000VUSEAT POWER-MCU 158HPB05
Subtask 25-21-34-710-050-A ** ON A/C NOT FOR ALL
E. Operational Test
   (1) Do the Test (Ref. AMM TASK 25-21-00-710-002).
Subtask 25-21-34-740-050-A ** ON A/C NOT FOR ALL
F. BITE Test of the Master Control Unit
   (1) Do the BITE Test of the Master Control Unit (Ref. AMM TASK 25-21-00-740-001).
5. Close-up
Subtask 25-21-34-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Close the door of the related overhead stowage compartment.
   (2) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-21-34-410-050-C ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the bin (Ref. AMM D/O 25-24-41-40) of the related overhead stowage compartment.
   (2) Install the passenger service unit (Ref. AMM TASK 23-73-45-400-001) of the related overhead stowage compartment.
   (3) Install the emergency oxygen container (Ref. AMM TASK 35-21-41-400-001) of the related overhead stowage compartment.
   (4) Install the individual air outlet (Ref. AMM TASK 21-24-19-400-001) of the related overhead stowage compartment.
   (5) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-21-34-862-051-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:30:20 UTC