Operational Check of AC ESS Generation Switching
TASK 24-25-00-710-001-A
Operational Check of AC ESS Generation Switching
Refer to the MPD TASK: 242500-01
OPERATIONAL CHECK OF AC ESS GENERATION SWITCHING
Make sure that it is possible to energize the AC ESS and AC SHED ESS busbars:
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 24-25-00-860-050-A
4. Procedure
Subtask 24-25-00-710-050-B
Subtask 24-25-00-865-052-A
[Rev.10 from 2021]
2026.04.01 05:40:39 UTC
Operational Check of AC ESS Generation Switching
ZONE: 210
1. Reason for the JobRefer to the MPD TASK: 242500-01
OPERATIONAL CHECK OF AC ESS GENERATION SWITCHING
Make sure that it is possible to energize the AC ESS and AC SHED ESS busbars:
- With the AC2 normal busbar
- When the AC1 busbar is no longer energized.
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TSM 24-35-00-810-810 | Loss of the DC ESS Busbar |
Subtask 24-25-00-860-050-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
Subtask 24-25-00-865-050-A (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 24-25-00-865-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 106VU | AC ESS BUS/STBY/CNTOR/CTL | 5XC | B08 |
| 106VU | AC ESS/BUS NORM/CNTOR/CTL | 4XC | B03 |
| 122VU | ELEC/AC/BUS1/CTL | 17XN1 | V25 |
| 123VU | AC ESS/BUS ON/BUS 1 | 1XC | AC12 |
| 123VU | AC ESS/BUS ON/BUS 2 | 2XC | AC01 |
WARNING:
OPEN THE CIRCUIT BREAKERS THAT FOLLOW:
C. Open, safety and tag this(these) circuit breaker(s):- THE PITOT PROBE HEATER CIRCUIT BREAKERS 3DA2 AND 3DA3
- THE TAT PROBE CIRCUIT BREAKER 1DA1.
- THE PROBES (PITOT, TAT) WILL BECOME HOT, AND
- THE PROBE (PITOT, TAT) COVERS WILL MELT.
| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/1/TAT | 1DA1 | Z12 |
Subtask 24-25-00-710-050-B
A. Operational Test of the AC Essential-Generation Switching
5. Close-up| ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the ECAM DU, on the "ELEC" page:
|
2.On AC power center 123VU:
| On F/O glareshield panel 130VU:
|
| | You can hear the single chime. |
| | These indications come into view on the ECAM DU:
|
NOTE: During this test, the upper ECAM will not be available. If the lower ECAM is not serviceable (MEL condition), it is necessary to set the ECAM/ND XFR selector switch to the F/O position to get the EWD on the ND DU. The "ECAM" page is shown on the F/O ND DU. The single display mode is used because there is only one DU available for all the ECAM functions. | |
| | On ELEC panel 35VU:
|
3.On rear circuit-breaker panel 122VU:
| On ELEC panel 35VU:
|
4.On the ECAM control panel:
| On the ECAM DU, on the "ELEC" page:
|
NOTE: During this test, if the ELEC key of the ECAM control panel does not operate (but the ALL and CLEAR keys do) and the "DC ESS LOSS" indication comes into view, the loss of the DC ESS busbar is a possible cause of this failure TSM 24-35-00-810-810. | |
5.On the EMER ELEC PWR section of panel 21VU:
| On the ECAM DU, on the "ELEC" page:
|
6.On AC power-center 123VU:
| |
7.On rear circuit-breaker panel 122VU:
| On the ECAM DU, on the "ELEC" page:
|
8.On the EMER ELEC PWR section of panel 21VU:
| On the EMER ELEC PWR section of panel 21VU:
|
| | On the ECAM DU, on the "ELEC" page:
|
9.On AC power-center 123VU:
| On F/O glareshield panel 130VU:
|
| | You can hear the single chime. |
| | These indications come into view on the ECAM DU:
|
| | On ELEC panel 35VU:
|
10.On ELEC panel 35VU:
| On ELEC panel 35VU:
|
11.On the ECAM control panel:
| On the ECAM DU, on the "ELEC" page:
|
12.On AC power center 123VU.
| |
13.On ELEC panel 35VU:
| On ELEC panel 35VU:
|
| | On the "ELEC" page:
|
Subtask 24-25-00-865-052-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 24-25-00-860-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/1/TAT | 1DA1 | Z12 |
B. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).