Functional Test of the AFT Cargo-Compartment Ventilation-System
TASK 21-28-00-720-004-A
Functional Test of the AFT Cargo-Compartment Ventilation-System
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-28-00-861-067-A ** ON A/C NOT FOR ALL Subtask 21-28-00-865-069-A ** ON A/C NOT FOR ALL
Subtask 21-28-00-720-055-B ** ON A/C NOT FOR ALL
Subtask 21-28-00-860-062-A ** ON A/C NOT FOR ALL Subtask 21-28-00-410-063-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:04:00 UTC
Functional Test of the AFT Cargo-Compartment Ventilation-System
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 162DW | |
| 151EW | |
| 151VW |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-55-11-000-003-A | Removal of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59 |
| TASK 25-55-11-400-003-A | Installation of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59 |
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 26-16-00-710-003-A | Operational Check of Cargo Compartment Smoke Detection by CFDS to Confirm Isolation Valves Latching Circuit Integrity. |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 21-28-00-861-067-A ** ON A/C NOT FOR ALL Subtask 21-28-00-865-069-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 21-28-00-865-089-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT & HTG/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS2 | 4HK | V20 |
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS1 | 3HK | V19 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS2 | 2HK | V18 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS1 | 1HK | V17 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/AFT CARGO VENT/FAN | 30HN | S22 |
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 21-28-00-010-062-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT & HTG/CTL & MONG | 31HN | C07 |
D. Get Access
(1) Open the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) at the AFT cargo-compartment door 826.
(3) Remove the access panel 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) Remove the access panel 151EW (Ref. AMM TASK 25-55-11-000-003).
Subtask 21-28-00-010-062-B ** ON A/C NOT FOR ALL (1) Open the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) at the AFT cargo-compartment door 826.
(3) Remove the access panel 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) Remove the access panel 151EW (Ref. AMM TASK 25-55-11-000-003).
D. Get Access
(1) Open the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) at the AFT cargo-compartment door 826.
(3) Remove the access panel 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) Remove the access panel 151VW (Ref. AMM TASK 25-55-11-000-003).
Subtask 21-28-00-860-061-B ** ON A/C NOT FOR ALL (1) Open the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(2) Put the ACCESS PLATFORM 2M (6 FT) at the AFT cargo-compartment door 826.
(3) Remove the access panel 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) Remove the access panel 151VW (Ref. AMM TASK 25-55-11-000-003).
E. Aircraft Maintenance Configuration
(1) On the overhead panel 22VU, make sure that the white OFF light in the AFT ISOL VALVE pushbutton switch is on.
(2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) Make sure that the ENGINE/WARNING page shows on the ECAM upper display unit.
(4) Make sure that the COND page shows on the ECAM lower display unit.
4. Procedure(1) On the overhead panel 22VU, make sure that the white OFF light in the AFT ISOL VALVE pushbutton switch is on.
(2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) Make sure that the ENGINE/WARNING page shows on the ECAM upper display unit.
(4) Make sure that the COND page shows on the ECAM lower display unit.
Subtask 21-28-00-720-055-B ** ON A/C NOT FOR ALL
A. Functional Test of the Aft Cargo-Compartment Ventilation -System
Subtask 21-28-00-710-061-A ** ON A/C NOT FOR ALL NOTE: During the test you must visually monitor the inlet and the outlet isolation valves for the correct movement sequence.
| ACTION | RESULT |
|---|---|
1.On the panel 22VU:
| On the panel 22VU:
|
| | On the ECAM lower display unit:
|
| | In the AFT cargo compartment:
|
2.On the outlet isolation valve 33HN:
| On the ECAM upper display unit:
|
| | On the panel 22VU:
|
| | In the AFT cargo compartment:
|
3.On the panel 22VU:
| On the panel 22VU:
|
| | On the ECAM lower display unit:
|
| | On the ECAM control panel 11VU:
|
| | In the AFT cargo compartment:
|
4.On the outlet isolation valve 33HN:
| On the panel 22VU:
|
| | On the ECAM lower display unit:
|
| | On the ECAM upper display unit:
|
| | In the AFT cargo compartment:
|
5.On the panel 22VU:
| On the panel 22VU:
|
| | On the ECAM lower display unit:
|
| | In the AFT cargo compartment:
|
6.On the panel 22VU:
| On the panel 22VU:
|
| | On the ECAM lower display unit:
|
| | In the AFT cargo compartment:
|
7.On the ECAM control panel 11VU:
| On the ECAM control panel 11VU:
|
| | On the ECAM lower display unit:
|
B. Do the operational test of the AFT cargo-compartment smoke-detection with the CFDS to confirm isolation valve latching circuit integrity. (Ref. AMM TASK 26-16-00-710-003).
5. Close-upSubtask 21-28-00-860-062-A ** ON A/C NOT FOR ALL Subtask 21-28-00-410-063-A ** ON A/C NOT FOR ALL
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) Install the access panel 151EW (Ref. AMM TASK 25-55-11-400-003).
(4) Remove the access platform(s).
(5) Close the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
Subtask 21-28-00-410-063-C ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) Install the access panel 151EW (Ref. AMM TASK 25-55-11-400-003).
(4) Remove the access platform(s).
(5) Close the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) Install the access panel 151VW (Ref. AMM TASK 25-55-11-400-003).
(4) Remove the access platform(s).
(5) Close the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
Subtask 21-28-00-862-063-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) Install the access panel 151VW (Ref. AMM TASK 25-55-11-400-003).
(4) Remove the access platform(s).
(5) Close the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).