Operational Test of the AFT Cargo-Compartment Ventilation-System
TASK 21-28-00-710-006-A
Operational Test of the AFT Cargo-Compartment Ventilation-System
1. Reason for the Job
There are alternative procedures in this task:
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-28-00-861-070-A ** ON A/C NOT FOR ALL Subtask 21-28-00-865-072-A ** ON A/C NOT FOR ALL
Subtask 21-28-00-710-059-A ** ON A/C NOT FOR ALL
Subtask 21-28-00-860-057-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 04:25:49 UTC
Operational Test of the AFT Cargo-Compartment Ventilation-System
1. Reason for the Job
There are alternative procedures in this task:
- For aircraft WITH ventilation isolation valve position indications on the ECAM COND page.
- For aircraft WITHOUT ventilation isolation valve position indications on the ECAM COND page.
- Do a check of the aircraft configuration with regard to these ECAM indications before you do the test.
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 162DW | |
| 151EW | |
| 151VW |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-55-11-000-003-A | Removal of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59 |
| TASK 25-55-11-400-003-A | Installation of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59 |
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 21-28-00-861-070-A ** ON A/C NOT FOR ALL Subtask 21-28-00-865-072-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 21-28-00-865-090-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT & HTG/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS2 | 4HK | V20 |
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS1 | 3HK | V19 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS2 | 2HK | V18 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS1 | 1HK | V17 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/AFT CARGO VENT/FAN | 30HN | S22 |
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 21-28-00-010-065-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT & HTG/CTL & MONG | 31HN | C07 |
D. Get Access
(2) Put the ACCESS PLATFORM 2M (6 FT) at the AFT cargo-compartment door 826.
(3) Remove the access panel 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) Remove the access panel 151EW (Ref. AMM TASK 25-55-11-000-003).
Subtask 21-28-00-010-065-C ** ON A/C NOT FOR ALL NOTE: This procedure is only applicable for aircraft WITHOUT ventilation isolation valve positions indicated on the ECAM COND page.
(1) Open the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001). (2) Put the ACCESS PLATFORM 2M (6 FT) at the AFT cargo-compartment door 826.
(3) Remove the access panel 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) Remove the access panel 151EW (Ref. AMM TASK 25-55-11-000-003).
D. Get Access
(2) Put the ACCESS PLATFORM 2M (6 FT) at the AFT cargo-compartment door 826.
(3) Remove the access panel 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) Remove the access panel 151VW (Ref. AMM TASK 25-55-11-000-003).
Subtask 21-28-00-860-056-A ** ON A/C NOT FOR ALL NOTE: This procedure is only applicable for aircraft WITHOUT ventilation isolation valve positions indicated on the ECAM COND page.
(1) Open the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001). (2) Put the ACCESS PLATFORM 2M (6 FT) at the AFT cargo-compartment door 826.
(3) Remove the access panel 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) Remove the access panel 151VW (Ref. AMM TASK 25-55-11-000-003).
E. Aircraft Maintenance Configuration
Subtask 21-28-00-860-063-A ** ON A/C NOT FOR ALL NOTE: This procedure is only applicable for aircraft WITHOUT ventilation isolation valve positions indicated on the ECAM COND page.
(1) On the overhead panel 22VU make sure that the white OFF light in the AFT ISOL VALVE pushbutton switch is on. F. Aircraft Maintenance Configuration
(2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) Make sure that the COND page shows on the ECAM lower display unit.
4. ProcedureNOTE: This procedure is only applicable for aircraft WITH ventilation isolation valve positions indicated on the ECAM COND page.
(1) On the overhead panel 22VU make sure that the white OFF light in the AFT ISOL VALVE pushbutton switch is on. (2) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(3) Make sure that the COND page shows on the ECAM lower display unit.
Subtask 21-28-00-710-059-A ** ON A/C NOT FOR ALL
A. Do the Operational Test of the Ventilation System
Subtask 21-28-00-710-065-A ** ON A/C NOT FOR ALL NOTE: This procedure is only applicable for aircraft WITHOUT ventilation isolation valve positions indicated on the ECAM COND page.
During the test you must visually monitor the isolation valves for correct movement sequence.
During the test you must visually monitor the isolation valves for correct movement sequence.
| ACTION | RESULT |
|---|---|
1.On the panel 22VU:
| On the panel 22VU:
|
| | In the AFT cargo compartment:
|
2.On the panel 22VU:
| On the panel 22VU:
|
| | In the AFT cargo compartment:
|
B. Do the Operational Test of the Ventilation System
5. Close-upNOTE: This procedure is only applicable for aircraft WITH ventilation isolation valve positions indicated on the ECAM COND page.
| ACTION | RESULT |
|---|---|
1.On the panel 22VU:
| On the panel 22VU:
|
| | On the ECAM lower display units:
|
2.On the panel 22VU:
| On the panel 22VU:
|
| | On the ECAM lower display unit:
|
Subtask 21-28-00-860-057-A ** ON A/C NOT FOR ALL
A. Do the EIS stop procedure
Subtask 21-28-00-410-066-A ** ON A/C NOT FOR ALL NOTE: This procedure is only applicable for aircraft WITH ventilation isolation valve positions indicated on the ECAM COND page.
(Ref. AMM TASK 31-60-00-860-002). B. Close Access
(2) Install the access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) Install the access panel 151EW (Ref. AMM TASK 25-55-11-400-003).
(4) Remove the access platform(s).
(5) Close the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
Subtask 21-28-00-410-066-C ** ON A/C NOT FOR ALL NOTE: This procedure is only applicable for aircraft WITHOUT ventilation isolation valve positions indicated on the ECAM COND page.
(1) Make sure that the work area is clean and clear of tools and other items.(2) Install the access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) Install the access panel 151EW (Ref. AMM TASK 25-55-11-400-003).
(4) Remove the access platform(s).
(5) Close the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
B. Close Access
(2) Install the access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) Install the access panel 151VW (Ref. AMM TASK 25-55-11-400-003).
(4) Remove the access platform(s).
(5) Close the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
Subtask 21-28-00-862-066-A ** ON A/C NOT FOR ALL NOTE: This procedure is only applicable for aircraft WITHOUT ventilation isolation valve positions indicated on the ECAM COND page.
(1) Make sure that the work area is clean and clear of tools and other items.(2) Install the access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) Install the access panel 151VW (Ref. AMM TASK 25-55-11-400-003).
(4) Remove the access platform(s).
(5) Close the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).