GENERAL VISUAL INSPECTION OF PYLON LEADING EDGE AND LOWER FAIRING (EWIS)
TASK 05-24-70-200-001-A
GENERAL VISUAL INSPECTION OF PYLON LEADING EDGE AND LOWER FAIRING (EWIS)
Refer to the MPD TASK: ZL-471-01
GENERAL VISUAL INSPECTION OF PYLON LEADING EDGE AND LOWER FAIRING (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-24-70-010-050-B ** ON A/C NOT FOR ALL
Subtask 05-24-70-210-050-A ** ON A/C NOT FOR ALL
Subtask 05-24-70-410-050-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 22:50:00 UTC
GENERAL VISUAL INSPECTION OF PYLON LEADING EDGE AND LOWER FAIRING (EWIS)
ZONE: 471
ZONE: 472
ZONE: 473
ZONE: 475
ZONE: 476
ZONE: 477
ZONE: 481
ZONE: 482
ZONE: 483
ZONE: 485
ZONE: 486
ZONE: 487
1. Reason for the JobZONE: 472
ZONE: 473
ZONE: 475
ZONE: 476
ZONE: 477
ZONE: 481
ZONE: 482
ZONE: 483
ZONE: 485
ZONE: 486
ZONE: 487
Refer to the MPD TASK: ZL-471-01
GENERAL VISUAL INSPECTION OF PYLON LEADING EDGE AND LOWER FAIRING (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 471 | PYLON LEADING EDGE |
| 472 | PYLON LEADING EDGE |
| 473 | LOWER FAIRING |
| 475 | REAR PYLON |
| 476 | REAR PYLON |
| 477 | REAR FAIRING |
| 481 | PYLON LEADING EDGE |
| 482 | PYLON LEADING EDGE |
| 483 | LOWER FAIRING |
| 485 | REAR PYLON |
| 486 | REAR PYLON |
| 487 | REAR FAIRING |
| 471BL, 471CL, 473AL, 475AL, 475BL, 477AL, 481BL, 483AL, 485AL, 485BL, 487AR | |
| 471AL, 472AR, 472BR, 475CL, 476AR, 476BR, 476CR, 481AL, 482AR, 482BR, 482CR, 485CL, 486AR, 486BR, 486CR | |
| 471BR, 471CR, 471DL, 475AR, 475BR, 481BR, 481CL, 481CR, 481DR, 485AR, 485BR | |
| 473AR, 483AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 54-53-11-000-002-A | Removal of the Pylon-to-Wing Access Panels |
| TASK 54-53-11-000-002-B | Removal of the Pylon-to-Wing Access Panels |
| TASK 54-53-11-400-002-A | Installation of the Pylon-to-Wing Access Panels |
| TASK 54-53-11-400-002-B | Installation of the Pylon-to-Wing Access Panels |
| TASK 54-56-00-000-001-A | Removal of the Lower Fairing |
| TASK 54-56-00-000-002-A | Removal of the Lower Fairing |
| TASK 54-56-00-400-001-A | Installation of the Lower Fairing |
| TASK 54-56-00-400-002-A | Installation of the Lower Fairing |
Subtask 05-24-70-010-050-B ** ON A/C NOT FOR ALL
A. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT) in position at zone 470 (480).
(2) Remove the access panels (Ref. AMM TASK 54-53-11-000-002) and (Ref. AMM TASK 54-56-00-000-001):
Subtask 05-24-70-010-050-E ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 3M (10 FT) in position at zone 470 (480).
(2) Remove the access panels (Ref. AMM TASK 54-53-11-000-002) and (Ref. AMM TASK 54-56-00-000-001):
A. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT) in position at zone 470 (480).
(2) Remove the access panels (Ref. AMM TASK 54-53-11-000-002) and (Ref. AMM TASK 54-56-00-000-001):
Subtask 05-24-70-010-050-F ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 3M (10 FT) in position at zone 470 (480).
(2) Remove the access panels (Ref. AMM TASK 54-53-11-000-002) and (Ref. AMM TASK 54-56-00-000-001):
A. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT) in position at zone 470 (480).
(2) Remove the access panels (Ref. AMM TASK 54-53-11-000-002) and (Ref. AMM TASK 54-56-00-000-002):
4. Procedure(1) Put an ACCESS PLATFORM 3M (10 FT) in position at zone 470 (480).
(2) Remove the access panels (Ref. AMM TASK 54-53-11-000-002) and (Ref. AMM TASK 54-56-00-000-002):
Subtask 05-24-70-210-050-A ** ON A/C NOT FOR ALL
A. Inspection
(1) Do a general visual inspection of the leading edge of the pylon and the lower fairing (Zones 471, 472, 473, 475, 476, 477, 481, 482, 483, 485, 486 and 487).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up(1) Do a general visual inspection of the leading edge of the pylon and the lower fairing (Zones 471, 472, 473, 475, 476, 477, 481, 482, 483, 485, 486 and 487).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
Subtask 05-24-70-410-050-B ** ON A/C NOT FOR ALL
A. Close Access
(1) Install the access panels (Ref. AMM TASK 54-53-11-400-002) and (Ref. AMM TASK 54-56-00-400-001):
Subtask 05-24-70-410-050-E ** ON A/C NOT FOR ALL (1) Install the access panels (Ref. AMM TASK 54-53-11-400-002) and (Ref. AMM TASK 54-56-00-400-001):
- For the left pylon:
471AL 471BL 471CL,
473AL,
475AL 475BL 475CL,
477AL,
472AR 472BR 473AR,
476AR 476BR 476CR. - For the right pylon:
481AL 481BL 483AL,
485AL 485BL 485CL,
482AR 482BR 482CR,
483AR,
486AR 486BR 486CR,
487AR.
A. Close Access
(1) Install the access panels (Ref. AMM TASK 54-53-11-400-002) and (Ref. AMM TASK 54-56-00-400-001):
Subtask 05-24-70-410-050-F ** ON A/C NOT FOR ALL (1) Install the access panels (Ref. AMM TASK 54-53-11-400-002) and (Ref. AMM TASK 54-56-00-400-001):
- For the left pylon:
471BL 471CL 471DL,
473AL,
475AL 475BL,
477AL,
471BR 471CR 473AR,
475AR 475BR. - For the right pylon:
481BL 481CL 483AL,
485AL 485BL,
481BR 481CR 481DR,
483AR,
485AR 485BR,
487AR.
A. Close Access
(1) Install the access panels (Ref. AMM TASK 54-53-11-400-002) and (Ref. AMM TASK 54-56-00-400-002):
(1) Install the access panels (Ref. AMM TASK 54-53-11-400-002) and (Ref. AMM TASK 54-56-00-400-002):
- For the left pylon:
471BL 471CL 471DL,
473AL,
475AL 475BL,
477AL,
471BR 471CR,
475AR 475BR. - For the right pylon:
481BL 481CL 483AL,
485AL 485BL,
481BR 481CR 481DR,
485AR 485BR,
487AR.
Location of the Access Panels of the Left Pylon (Left Side)