W DOC AIRBUS | AMM A320F

Repair the Blank Cascade Panel Assembly Surface Damage - VRS2254 [IAE]


TASK 78-32-19-300-013-A
Repair the Blank Cascade Panel Assembly Surface Damage - VRS2254


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
No specific
AR
LIGHT SOURCE - HEAT, SPARK-PROOF
No specific
AR
WARNING NOTICE(S)
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.V01-076)
Methyl Ethyl Ketone, Technical grade
(Material No.V01-201)
distilled or deionized water
(Material No.V02-099)
lint free cloth
(Material No.V05-073)
aluminum oxide abrasive paper
(Material No.V05-074)
aluminum oxide abrasive paper
(Material No.V06-131)
marking pen
(Material No.V07-028)
conversion coating
(Material No.V07-139)
thinner
(Material No.V07-140)
primer converter
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [1000EM1] (ENGINE-1)
437AL, 438AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-010-A
Opening of the Fan Cowls 437AL(447AL),438AR(448AR)
TASK 71-13-00-410-010-A
Closing of the Fan Cowls 437AL(447AL),438AR(448AR)
TASK 78-30-00-040-012-A
Deactivation of the Thrust Reverser Hydraulic Control Unit (HCU) for Ground Maintenance
TASK 78-30-00-440-012-A
Re-activation of the Thrust Reverser Hydraulic Control Unit (HCU) after Ground Maintenance
TASK 78-31-00-710-041-A
Operational Test of the Thrust Reverser System with the CFDS
TASK 78-31-00-710-041-A-02
Operational test of the Thrust Reverser without the CFDS and Engine Running
TASK 78-32-00-860-010-A
Manual Extension of the Thrust Reverser Translating Sleeves
TASK 78-32-00-860-011-A
Manual Retraction of the Thrust Reverser Translating Sleeves
3. Job Set-up
Subtask 78-32-19-941-055-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) On the center pedestal, on the ENG panel 115VU:
     (a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
   (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
   (3) On the overhead maintenance panel 50VU:
     (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
     (b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 78-32-19-010-060-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Open the fan cowls (Ref. AMM TASK 71-13-00-010-010):
     (a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
     (b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
   (2) Put the ACCESS PLATFORM 2M (6 FT) in position.
Subtask 78-32-19-040-056-A ** ON A/C NOT FOR ALL
C. Deactivation of the Thrust Reverser
WARNING: MAKE SURE THAT THE THRUST REVERSER HYDRAULIC CONTROL UNIT (HCU) IS DEACTIVATED BEFORE YOU DO WORK ON OR AROUND THE THRUST REVERSER. IF THE HCU IS NOT DEACTIVATED, THERE IS A RISK OF UNWANTED THRUST REVERSER OPERATION WHICH CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
   (1) Deactivate the thrust reverser Hydraulic Control Unit (HCU) (Ref. AMM TASK 78-30-00-040-012).
Subtask 78-32-19-010-061-A ** ON A/C NOT FOR ALL
D. Extend the translating sleeves manually (Ref. AMM TASK 78-32-00-860-010).
4. Procedure
Subtask 78-32-19-350-060-A ** ON A/C NOT FOR ALL
A. Blend Out the Surface Damage
   (1) Use the aluminum oxide abrasive paper (Material No.V05-074) to blend the damaged area to a 10 to 1 taper.
   (2) Use the aluminum oxide abrasive paper (Material No.V05-073) to make the repair area smooth.
   (3) Clean the repair area with a lint free cloth (Material No.V02-099) made moist with V01-076Methyl Ethyl Ketone, Technical grade. Rub the surfaces dry before the cleaning solvent becomes dry.
Subtask 78-32-19-350-061-A ** ON A/C NOT FOR ALL
B. Apply the Conversion Coating
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
   (1) Use the manufacturer instructions to mix the conversion coating (Material No.V07-028) .
   (2) Use a nylon brush or cheesecloth swab to apply three layers of the conversion coating to the bare metal of the repair area. Permit 3 minutes between layers. Use the distilled or deionized water (Material No.V01-201) to flush the surface after the last layer. Dry the surface.
Subtask 78-32-19-350-062-A ** ON A/C NOT FOR ALL
C. Apply the Primer
   (1) Use manufacturer instructions to mix the primer converter (Material No.V07-140) and thinner (Material No.V07-139) .
   (2) Use a brush to apply the primer to the repair surface.
   (3) Cure the primer for 7 hours at room temperature or for 40 minutes between 140 and 180 deg.F (60 and 82 deg.C) with an LIGHT SOURCE - HEAT, SPARK-PROOF.
NOTE: You can touch the primer after you have cured it as described above. The primer is fully cured after 7 days at room temperature.
Subtask 78-32-19-220-053-A ** ON A/C NOT FOR ALL
D. Examine the Completed Repair
   (1) Examine the completed repair to make sure all requirements of this repair procedure are done.
Subtask 78-32-19-350-063-A ** ON A/C NOT FOR ALL
E. Identify the Repair
   (1) Make a mark VRS2254 with a marking pen (Material No.V06-131) adjacent to the assembly.
5. Close-up
Subtask 78-32-19-410-059-A ** ON A/C NOT FOR ALL
A. Manually retract the thrust reverser translating sleeves (Ref. AMM TASK 78-32-00-860-011).
Subtask 78-32-19-440-055-A ** ON A/C NOT FOR ALL
B. Activate the thrust reverser Hydraulic Control Unit (HCU) (Ref. AMM TASK 78-30-00-440-012).
Subtask 78-32-19-410-060-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Close the fan cowls (Ref. AMM TASK 71-13-00-410-010):
     (a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
     (b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
   (2) Remove the access platform(s).
   (3) Remove the WARNING NOTICE(S).
Subtask 78-32-19-710-055-A ** ON A/C NOT FOR ALL
D. Operational Test
   (1) Do an operational test of the thrust reverser system (Ref. AMM TASK 78-31-00-710-041).
NOTE: As an alternative procedure, you can do the operational test without the CFDS (Ref. AMM TASK 78-31-00-710-041).
[Rev.10 from 2021] 2026.04.01 13:12:28 UTC