Subtask 75-33-05-941-051-A
Subtask 75-33-05-420-050-A
Subtask 75-33-05-740-050-A Subtask 75-33-05-410-050-A
[Rev.10 from 2021]
2026.04.01 12:57:44 UTC
Installation of the Transient Bleed Valve (TBV)
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 4164KS
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP2442) | engine oil |
| (Material No.CP8006) | safety cable 0.032 in. (0.8 mm) dia. |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1) | |
| 437AL, 438AR, 452AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2) | |
| 447AL, 448AR, 462AR | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 15 | SEAL | EIPC 75-11-00-10-260 |
| 6 | SEAL | EIPC 75-11-00-10-260 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 70-70-00-910-804-A | Electrical Standard Practices |
| TASK 71-13-00-010-803-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-803-A | Closing of the Fan Cowl Doors |
| TASK 73-29-00-740-802-A | Actuators Test (Menu Mode) |
| TASK 78-30-00-040-809-A | Deactivation of the Thrust Reverser System for Ground Maintenance |
| TASK 78-30-00-440-809-A | Reactivation of the Thrust Reverser System after Ground Maintenance |
| TASK 78-36-00-010-806-A | Opening of the Thrust Reverser Cowl Doors |
| TASK 78-36-00-410-806-A | Closing of the Thrust Reverser Cowl Doors |
Subtask 75-33-05-941-051-A
A. Safety Precautions
(1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate:
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
Subtask 75-33-05-010-052-A (1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate:
- The ENG/MODE selector switch, and
- The ENG/MASTER 1(2) control switch.
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
B. Get Access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
Subtask 75-33-05-040-051-A (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
C. Deactivation of the Thrust Reverser System for Maintenance
Subtask 75-33-05-010-053-A WARNING:
YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
(1) Make sure that you did the deactivation of the thrust reverser system for maintenance (Ref. AMM TASK 78-30-00-040-809). D. Get Access
(1) Make sure that the right thrust-reverser cowl-door is open (Ref. AMM TASK 78-36-00-010-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
462AR
(2) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
4. Procedure(1) Make sure that the right thrust-reverser cowl-door is open (Ref. AMM TASK 78-36-00-010-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
462AR
(2) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
Subtask 75-33-05-420-050-A
A. Installation of the Transient Bleed Valve (TBV)
(1) Remove all the COVER - PROTECTION and the CAP - PROTECTION from the openings, tubes, hoses and connectors.
(2) Clean the component and the adjacent area.
(3) Do an inspection of the component interface and the adjacent area.
(4) Install the TBV (1) on the air tube (7) and the air tube (11) as follows:
(a) Install the new EIPC 75-11-00-10-260 SEAL (6) and the new EIPC 75-11-00-10-260 SEAL (15) on the TBV (1).
(b) Put the TBV (1) in position between the air tube (7) and the air tube (11).
(c) Hold the TBV (1) and install the V-band coupling (8) that attaches the TBV (1) to the air tube (7) hand-tight.
(d) Install the V-band coupling (14) that attaches the TBV (1) to the air tube (11) hand-tight.
PRE SB 72-0190
(e) TORQUE the V-band coupling (8) and the V-band coupling (14) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
.
(5) TORQUE the V-band coupling (17) that attaches the air tube (11) to the air tube (19) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
.
PRE SB 72-0169
(6) TORQUE the V-band coupling (16) that attaches the air tube (11) to the air tube (18) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
.
END OF PRE SB 72-0169
(7) Apply engine oil (Material No.CP2442) to the threads and friction surfaces of the four bolts (13).
(8) Tighten the four bolts (13) that attach the air tube (7) to the bracket (12).
(a) TORQUE the four bolts (13) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
.
(9) Apply engine oil (Material No.CP2442) to the threads and friction surfaces of the four bolts (10).
(10) Install the four bolts (10) that attach the air tube (11) to the bracket (9).
(a) TORQUE the four bolts (10) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
.
END OF PRE SB 72-0190
POST SB 72-0190
(11) Apply engine oil (Material No.CP2442) to the threads and friction surfaces of the two bolts (20).
(12) Install the two bolts (20) that attach the air tube (11) to the bracket (21).
(a) TORQUE the two bolts (20) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
.
(13) TORQUE the V-band coupling (8) and the V-band coupling (14) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
.
(14) TORQUE the V-band coupling (17) that attaches the air tube (11) to the air tube (19) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
.
END OF POST SB 72-0190
(15) Connect the fuel manifold (2) to the C2 fitting of the TBV (1).
(a) Triple torque the fuel manifold (2) as follows:
1 TORQUE the fuel manifold (2) B-nut to between 308 and 262 lbf.in (3.48 and 2.96 m.daN )
.
2 Loosen the fuel manifold (2) B-nut until it is free-running.
3 TORQUE the fuel manifold (2) B-nut to between 308 and 262 lbf.in (3.48 and 2.96 m.daN )
.
4 TORQUE the fuel manifold (2) B-nut again to between 308 and 262 lbf.in (3.48 and 2.96 m.daN )
.
(16) Connect the fuel manifold (3) B-nut to the C1 fitting of the TBV (1).
(a) Triple torque the fuel manifold (3) B-nut as follows:
1 TORQUE the fuel manifold (3) B-nut to between 540 and 460 lbf.in (6.10 and 5.20 m.daN )
.
2 Loosen the fuel manifold (3) B-nut until it is free-running.
3 TORQUE the fuel manifold (3) B-nut to between 540 and 460 lbf.in (6.10 and 5.20 m.daN )
.
4 TORQUE the fuel manifold (3) B-nut again to between 540 and 460 lbf.in (6.10 and 5.20 m.daN )
.
(17) Connect the drain tube (4) B-nut to the TBV (1).
(a) TORQUE the drain tube (4) B-nut to between 308 and 262 lbf.in (3.48 and 2.96 m.daN )
.
(18) Installation of the safety cable:
CP8006 safety cable 0.032 in. (0.8 mm) dia. 0.8 mm (0.0315 in.) on the fuel manifold (2) B-nut and the fuel manifold (3) B-nut.
(19) Connect the HJ8A harness electrical connector (5) to the TBV (1) (Ref. AMM TASK 70-70-00-910-804). Tighten the coupling ring. If necessary, use PLIERS - JAWED, SOFT.
5. Close-up(1) Remove all the COVER - PROTECTION and the CAP - PROTECTION from the openings, tubes, hoses and connectors.
(2) Clean the component and the adjacent area.
(3) Do an inspection of the component interface and the adjacent area.
(4) Install the TBV (1) on the air tube (7) and the air tube (11) as follows:
(a) Install the new EIPC 75-11-00-10-260 SEAL (6) and the new EIPC 75-11-00-10-260 SEAL (15) on the TBV (1).
(b) Put the TBV (1) in position between the air tube (7) and the air tube (11).
(c) Hold the TBV (1) and install the V-band coupling (8) that attaches the TBV (1) to the air tube (7) hand-tight.
(d) Install the V-band coupling (14) that attaches the TBV (1) to the air tube (11) hand-tight.
PRE SB 72-0190
(e) TORQUE the V-band coupling (8) and the V-band coupling (14) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
. (5) TORQUE the V-band coupling (17) that attaches the air tube (11) to the air tube (19) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
. PRE SB 72-0169
(6) TORQUE the V-band coupling (16) that attaches the air tube (11) to the air tube (18) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
. END OF PRE SB 72-0169
(7) Apply engine oil (Material No.CP2442) to the threads and friction surfaces of the four bolts (13).
(8) Tighten the four bolts (13) that attach the air tube (7) to the bracket (12).
(a) TORQUE the four bolts (13) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
. (9) Apply engine oil (Material No.CP2442) to the threads and friction surfaces of the four bolts (10).
(10) Install the four bolts (10) that attach the air tube (11) to the bracket (9).
(a) TORQUE the four bolts (10) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
. END OF PRE SB 72-0190
POST SB 72-0190
(11) Apply engine oil (Material No.CP2442) to the threads and friction surfaces of the two bolts (20).
(12) Install the two bolts (20) that attach the air tube (11) to the bracket (21).
(a) TORQUE the two bolts (20) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
. (13) TORQUE the V-band coupling (8) and the V-band coupling (14) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
. (14) TORQUE the V-band coupling (17) that attaches the air tube (11) to the air tube (19) to between 124 and 106 lbf.in (1.40 and 1.20 m.daN )
. END OF POST SB 72-0190
(15) Connect the fuel manifold (2) to the C2 fitting of the TBV (1).
(a) Triple torque the fuel manifold (2) as follows:
1 TORQUE the fuel manifold (2) B-nut to between 308 and 262 lbf.in (3.48 and 2.96 m.daN )
. 2 Loosen the fuel manifold (2) B-nut until it is free-running.
3 TORQUE the fuel manifold (2) B-nut to between 308 and 262 lbf.in (3.48 and 2.96 m.daN )
. 4 TORQUE the fuel manifold (2) B-nut again to between 308 and 262 lbf.in (3.48 and 2.96 m.daN )
. (16) Connect the fuel manifold (3) B-nut to the C1 fitting of the TBV (1).
(a) Triple torque the fuel manifold (3) B-nut as follows:
1 TORQUE the fuel manifold (3) B-nut to between 540 and 460 lbf.in (6.10 and 5.20 m.daN )
. 2 Loosen the fuel manifold (3) B-nut until it is free-running.
3 TORQUE the fuel manifold (3) B-nut to between 540 and 460 lbf.in (6.10 and 5.20 m.daN )
. 4 TORQUE the fuel manifold (3) B-nut again to between 540 and 460 lbf.in (6.10 and 5.20 m.daN )
. (17) Connect the drain tube (4) B-nut to the TBV (1).
(a) TORQUE the drain tube (4) B-nut to between 308 and 262 lbf.in (3.48 and 2.96 m.daN )
. (18) Installation of the safety cable:
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(a) Install (19) Connect the HJ8A harness electrical connector (5) to the TBV (1) (Ref. AMM TASK 70-70-00-910-804). Tighten the coupling ring. If necessary, use PLIERS - JAWED, SOFT.
Subtask 75-33-05-740-050-A Subtask 75-33-05-410-050-A
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the right thrust-reverser cowl-door (Ref. AMM TASK 78-36-00-410-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
462AR
Subtask 75-33-05-440-050-A Subtask 75-33-05-410-051-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the right thrust-reverser cowl-door (Ref. AMM TASK 78-36-00-410-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
462AR
Transient Bleed Valve (TBV) (PRE and POST SB 72-0169, PRE and POST SB 72-0190)