Detailed Visual Inspection (DVI) of the Outer Structural Guide Vane Liner [PW11]
TASK 72-21-02-220-803-A
Detailed Visual Inspection (DVI) of the Outer Structural Guide Vane Liner
Use this procedure to do a detailed visual inspection of the outer structural-guide-vane liner-segment.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 72-21-02-941-057-A ** ON A/C NOT FOR ALL
Subtask 72-21-02-410-057-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 13:02:09 UTC
Detailed Visual Inspection (DVI) of the Outer Structural Guide Vane Liner
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AND THE ADJACENT COMPONENTS AFTER ENGINE SHUTDOWN. THE ENGINE, THE ENGINE OIL AND THE ADJACENT COMPONENTS CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 400
1. Reason for the JobUse this procedure to do a detailed visual inspection of the outer structural-guide-vane liner-segment.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | 1 | FLASHLIGHT |
| No specific | 1 | GLOVES - PROTECTIVE |
| No specific | 1 | MAT - PROTECTIVE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 400 | POWER PLANT, NACELLES AND PYLONS |
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-00-00-860-833-A | Procedure to Prevent Engine Motoring |
| TASK 71-13-00-010-802-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-802-A | Closing of the Fan Cowl Doors |
| TASK 72-21-05-000-803-A | Removal of the Fan Exit Structural Guide Vane (SGV) Outer Liner Segment |
| TASK 72-21-05-400-803-A | Installation of the Fan Exit Structural Guide Vane (SGV) Outer Liner Segment |
| TASK 78-30-00-040-805-A | Deactivation of the Thrust Reverser System for Ground Maintenance |
| TASK 78-30-00-440-805-A | Reactivation of the Thrust Reverser System after Ground Maintenance |
| TASK 78-36-00-010-802-A | Opening of the Thrust Reverser Cowl-Doors |
| TASK 78-36-00-410-802-A | Closing of the Thrust Reverser Cowl-Doors |
Subtask 72-21-02-941-057-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) Do the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
Subtask 72-21-02-010-060-A ** ON A/C NOT FOR ALL (1) Do the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
B. Get Access
(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
Subtask 72-21-02-040-054-A ** ON A/C NOT FOR ALL (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
C. Deactivation of the Thrust Reverser for Maintenance
Subtask 72-21-02-010-061-A ** ON A/C NOT FOR ALL WARNING:
YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
(1) Do the deactivation of the thrust reverser system for maintenance (Ref. AMM TASK 78-30-00-040-805). D. Get Access
(1) Open the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR
4. Procedure(1) Open the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR
CAUTION:
WIPE CLEAN ALL PARTS AND TOOLS AS NECESSARY TO REMOVE UNWANTED DEBRIS AND PREVENT DAMAGE TO THE ENGINE.
Subtask 72-21-02-220-053-A ** ON A/C NOT FOR ALL A. Detailed Visual Inspection of the Outer Structural Guide Vane Liner
(1) Do a detailed visual inspection of the outer structural-guide-vane liner-segment for damage. Use a FLASHLIGHT if necessary. Refer to Table 601.
(2) Put a MAT - PROTECTIVE inside the air intake cowl.
(3) Wear GLOVES - PROTECTIVE when you touch the fan blades.
Table 601 - Outer Structural-Guide-Vane Liner-Segment - Visual Inspection
(4) Remove the MAT - PROTECTIVE from the air intake cowl.
5. Close-up(1) Do a detailed visual inspection of the outer structural-guide-vane liner-segment for damage. Use a FLASHLIGHT if necessary. Refer to Table 601.
(2) Put a MAT - PROTECTIVE inside the air intake cowl.
(3) Wear GLOVES - PROTECTIVE when you touch the fan blades.
Table 601 - Outer Structural-Guide-Vane Liner-Segment - Visual Inspection
| EXAMINE | DAMAGE | DISPOSITION |
|---|---|---|
| Outer structural-guide-vane liner-segment for: | Missing liners | Install up to two missing liners in 50 flight cycles (Ref. AMM TASK 72-21-05-400-803). If more than two liners are missing, install the liners before the next flight (Ref. AMM TASK 72-21-05-400-803). |
| Liner flow path surface for: | Cracks in the area 0.30 in. (7.62 mm) axial length from the front edge, 0.20 in. (5.08 mm) axial length from the rear edge or triangle corner areas in 1.00 in. (25.40 mm), all quantities. | Permitted |
| | Cracks over the above area | Replace up to two damaged liners in 50 cycles (Ref. AMM TASK 72-21-05-000-803) and (Ref. AMM TASK 72-21-05-400-803). If more than two liners are damaged, replace the damaged liners before the next flight (Ref. AMM TASK 72-21-05-000-803) and (Ref. AMM TASK 72-21-05-400-803). |
| | Nicks, dents or scratches not more than 0.039 in. (0.991 mm) maximum depth, all quantities | Permitted |
| | Nicks, dents or scratches more than 0.039 in. (0.991 mm) maximum depth | Replace the damaged liner in 50 flight cycles (Ref. AMM TASK 72-21-05-000-803) and (Ref. AMM TASK 72-21-05-400-803). |
| | Surface erosion not more than 0.030 in. (0.762 mm) maximum depth, all quantities | Permitted |
| | Surface erosion more than 0.030 in. (0.762 mm) maximum depth | Replace the damaged liner in 50 flight cycles. Replace the damaged liners before the next flight (Ref. AMM TASK 72-21-05-000-803) and (Ref. AMM TASK 72-21-05-400-803). |
| | Punctures, holes or missing materials in the area 0.30 in. (7.62 mm) axial length from the front edge, 0.20 in. (5.08 mm) axial length from the rear edge or triangle corner areas in 1.00 in. (25.40 mm), all quantities. | Permitted |
| | Punctures, holes or missing materials over the above area | Replace the damaged liner in 10 flight cycles (Ref. AMM TASK 72-21-05-000-803) and (Ref. AMM TASK 72-21-05-400-803). |
| Rubber fillet for: | Wear, peeling, detachment or missing materials, all quantities | Permitted. Loose rubber fillets which are possible to be released from the liner may be cut away. |
Subtask 72-21-02-410-057-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR
Subtask 72-21-02-440-053-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL 462AR
B. Do the reactivation of the thrust reverser system after maintenance (Ref. AMM TASK 78-30-00-440-805).
Subtask 72-21-02-410-058-A ** ON A/C NOT FOR ALL
Detailed Visual Inspection of the Outer Structural Guide Vane Liner