Installation of the Fan Case Externals [PW11]
TASK 72-21-01-400-803-A
Installation of the Fan Case Externals
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 72-21-01-941-068-A ** ON A/C NOT FOR ALL
Subtask 72-21-01-410-067-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:48:20 UTC
Installation of the Fan Case Externals
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AND THE ADJACENT COMPONENTS AFTER ENGINE SHUTDOWN. THE ENGINE, THE ENGINE OIL AND THE ADJACENT COMPONENTS CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 400
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.P03-001) | lubricant, aircraft turbine engine (synthetic base) |
| (Material No.P06-054) | compound, paste, anti-seize |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 400 | POWER PLANT, NACELLES AND PYLONS |
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-00-00-860-833-A | Procedure to Prevent Engine Motoring |
| TASK 71-13-00-010-802-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-802-A | Closing of the Fan Cowl Doors |
| TASK 71-61-13-400-801-A | Installation of the Air Inlet Cowl Ground Straps |
| TASK 78-30-00-040-805-A | Deactivation of the Thrust Reverser System for Ground Maintenance |
| TASK 78-30-00-440-805-A | Reactivation of the Thrust Reverser System after Ground Maintenance |
| TASK 78-36-00-010-802-A | Opening of the Thrust Reverser Cowl-Doors |
| TASK 78-36-00-410-802-A | Closing of the Thrust Reverser Cowl-Doors |
Subtask 72-21-01-941-068-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) Do the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
Subtask 72-21-01-010-070-A ** ON A/C NOT FOR ALL (1) Do the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
B. Get Access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR.
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
Subtask 72-21-01-040-055-A ** ON A/C NOT FOR ALL (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR.
(2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
C. Deactivation of the Thrust Reverser for Ground Maintenance
Subtask 72-21-01-010-071-A ** ON A/C NOT FOR ALL WARNING:
YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
(1) Make sure that you did the deactivation of the thrust reverser system for ground maintenance (Ref. AMM TASK 78-30-00-040-805).D. Get Access
(1) Make sure that the thrust reverser doors are open (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL, 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL, 462AR.
4. Procedure(1) Make sure that the thrust reverser doors are open (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL, 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL, 462AR.
CAUTION:
WIPE CLEAN ALL PARTS AND TOOLS AS NECESSARY TO REMOVE UNWANTED DEBRIS AND PREVENT DAMAGE TO THE ENGINE AND ADJACENT COMPONENTS.
Subtask 72-21-01-400-050-A ** ON A/C NOT FOR ALL A. Installation of the Fan Case Externals
(1) Removal of the protection covers:
(2) Install the fan case externals as follows:
(a) Install the bushing (2) on the fan case support-ring with the two bolts (1). See the sheet 1 of the figure:
(b) TORQUE the two bolts (1) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.
(c) Install the ground cable (WF52) (7) on the fan case as follows:
1 Apply theP06-054 compound, paste, anti-seize on the threads of the nut (6).
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
2 Apply theP03-001 lubricant, aircraft turbine engine (synthetic base) on the threads of the nut (8).
3 Install the ground cable (WF52) (7) on the fan case support-ring with the bolt (5), washer (4) and nut (6). Tighten the nut (6) with your fingers.
4 Install the ground cable (WF52) (7) on the fan case flange A with the screw (9) and the nut (8). Tighten the nut (8) with your fingers.
5 Apply theP06-054 compound, paste, anti-seize on the threads of the five nuts (20). See the sheet 2 of the figure:
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
6 Install the ground cable (WF52) (7) on the studs with the five clamps (19) and the nuts (20).
7 TORQUE the nut (6) to between 100 and 90 lbf.in (1.13 and 1.02 m.daN )
.
8 TORQUE the nut (8) to between 80 and 70 lbf.in (0.90 and 0.79 m.daN )
.
9 TORQUE the five nuts (20) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.
10 Install the air inlet cowl ground cable to the ground cable (WF52) (7) flange A screw (9) (Ref. AMM TASK 71-61-13-400-801).
(d) Install the ground cable (WF53) (3) on the fan case as follows:
1 Apply theP06-054 compound, paste, anti-seize on the threads of the nut (6). See the sheet 1 of the figure:
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
2 Apply theP03-001 lubricant, aircraft turbine engine (synthetic base) on the threads of the nut (8).
3 Install the ground cable (WF53) (3) on the fan case support-ring with the bolt (5), washer (4) and nut (6). Tighten the nut (6) with your fingers.
4 Install the ground cable (WF53) (3) on the fan case flange A with the screw (9) and the nut (8). Tighten the nut (8) with your fingers.
5 Apply theP06-054 compound, paste, anti-seize on the threads of the two nuts (20) and the two bolts (5). See the sheet 2 of the figure:
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
6 Install the ground cable (WF53) (3) on the two studs with the two clamps (19) and the nuts (20). Tighten the nuts (20) with your fingers.
7 Install the ground cable (WF53) (3) on the two brackets with the two clamps (19) and the bolts (5). Tighten them with your fingers.
8 TORQUE the nut (6) to between 100 and 90 lbf.in (1.13 and 1.02 m.daN )
.
9 TORQUE the nut (8) to between 80 and 70 lbf.in (0.90 and 0.79 m.daN )
.
10 TORQUE the two nuts (20) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.
11 TORQUE the two bolts (5) to between 70 and 60 lbf.in (0.79 and 0.68 m.daN )
.
12 Install the air inlet cowl ground cable to the ground cable (WF53) (3) flange A screw (9) (Ref. AMM TASK 71-61-13-400-801).
(e) Install the ground cable (WF50) (29) on the fan case as follows:
1 Apply theP06-054 compound, paste, anti-seize on the threads of the nut (6). See the sheet 3 of the figure:
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
2 Apply theP03-001 lubricant, aircraft turbine engine (synthetic base) on the threads of the nut (8).
3 Install the ground cable (WF50) (29) on the fan case support-ring with the bolt (5), washer (4) and nut (6). Tighten the nut (6) with your fingers.
4 Install the ground cable (WF50) (29) on the fan case flange A with the screw (9) and the nut (8). Tighten the nut (8) with your fingers.
5 Apply theP06-054 compound, paste, anti-seize on the threads of the six nuts (20). See the sheet 4 of the figure:
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
6 Install the ground cable (WF50) (29) on the two brackets and the studs with the two clamps (19) and the nuts (20). Tighten the nuts (20) with your fingers.
7 Install the ground cable (WF50) (29) on the four studs with the four clamps (19) and the nuts (20).
8 TORQUE the nut (6) to between 100 and 90 lbf.in (1.13 and 1.02 m.daN )
.
9 TORQUE the nut (8) to between 80 and 70 lbf.in (0.90 and 0.79 m.daN )
.
10 TORQUE the six nuts (20) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.
(f) Install the air inlet cowl ground cable to the ground cable (WF50) (29) flange A screw (9) (Ref. AMM TASK 71-61-13-400-801).
(g) Install the bushing (2) on the fan case support-ring with the two bolts (1). See the sheet 5 of the figure:
(h) TORQUE the two bolts (1) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.
(i) Install the ground cable (WF51) (39) on the fan case as follows:
1 Apply theP06-054 compound, paste, anti-seize on the threads of the nut (6).
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
2 Apply theP03-001 lubricant, aircraft turbine engine (synthetic base) on the threads of the nut (8).
3 Install the ground cable (WF51) (39) on the fan case support-ring with the bolt (5), washer (4) and nut (6). Tighten the nut (6) with your fingers.
4 Install the ground cable (WF51) (39) on fan case flange A with the screw (9) and the nut (8). Tighten the nut (8) with your fingers.
5 Apply theP06-054 compound, paste, anti-seize on the threads of the six nuts (20). See the sheet 6 of the figure:
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
6 Install the ground cable (WF51) (39) on the two brackets and the studs with the two clamps (19) and the nuts (20). Tighten the nuts (20) with your fingers.
7 Install the ground cable (WF51) (39) on the two studs with the two clamps (19) and the nuts (20). Tighten the nuts (20) with your fingers.
8 Install the bracket (49), the ground cable (WF51) (39), the two clamps (19) and the four nuts (20) on the four studs.
9 TORQUE the nut (6) to between 100 and 90 lbf.in (1.13 and 1.02 m.daN )
.
10 TORQUE the nut (8) to between 80 and 70 lbf.in (0.90 and 0.79 m.daN )
.
11 TORQUE the eight nuts (20) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.
12 Install the air inlet cowl ground cable to the ground cable (WF51) (39) flange A screw (9) (Ref. AMM TASK 71-61-13-400-801).
(j) Install the bracket (59), plate (61) and bracket (62) on the fan case as follows. See the sheet 7 of the figure:
1 Apply theP06-054 compound, paste, anti-seize on the threads of the seven nuts (20) and the four bolts (60).
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
2 Install the bracket (59) on the three studs with the three nuts (20). Tighten the nuts with your fingers.
3 Install the bracket (62) on the four studs with the four nuts (20).
4 TORQUE the seven nuts (20) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.
5 Install the plate (61) on the bracket (59) with the four bolts (60).
6 TORQUE the four bolts (60) to between 44 and 38 lbf.in (0.50 and 0.43 m.daN )
.
(k) Install the six plates (63) and the plate (64) on the bracket (62) as follows:
1 Apply theP06-054 compound, paste, anti-seize on the threads of the 20 bolts (60).
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
2 Install the six plates (63) on the bracket (62) with the 12 bolts (60). Tighten them with your fingers.
3 Install the plate (64) on the bracket (62) with the two bolts (60). Tighten them with your fingers.
4 Install the six bolts (60) on the bracket (62).
5 TORQUE the 20 bolts (60) to between 44 and 38 lbf.in (0.50 and 0.43 m.daN )
.
(3) Examine the assembly for foreign objects, damage and correct assembly.
5. Close-up(1) Removal of the protection covers:
CAUTION:
REMOVE THE PROTECTION COVERS FROM THE OPENINGS AS NECESSARY TO PREVENT ENGINE DAMAGE.
(a) Make sure that you remove all the necessary COVER - PROTECTION to prevent damage to the engine.(2) Install the fan case externals as follows:
(a) Install the bushing (2) on the fan case support-ring with the two bolts (1). See the sheet 1 of the figure:
(b) TORQUE the two bolts (1) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.(c) Install the ground cable (WF52) (7) on the fan case as follows:
1 Apply the
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
2 Apply the
3 Install the ground cable (WF52) (7) on the fan case support-ring with the bolt (5), washer (4) and nut (6). Tighten the nut (6) with your fingers.
4 Install the ground cable (WF52) (7) on the fan case flange A with the screw (9) and the nut (8). Tighten the nut (8) with your fingers.
5 Apply the
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
6 Install the ground cable (WF52) (7) on the studs with the five clamps (19) and the nuts (20).
7 TORQUE the nut (6) to between 100 and 90 lbf.in (1.13 and 1.02 m.daN )
.8 TORQUE the nut (8) to between 80 and 70 lbf.in (0.90 and 0.79 m.daN )
.9 TORQUE the five nuts (20) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.10 Install the air inlet cowl ground cable to the ground cable (WF52) (7) flange A screw (9) (Ref. AMM TASK 71-61-13-400-801).
(d) Install the ground cable (WF53) (3) on the fan case as follows:
1 Apply the
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
2 Apply the
3 Install the ground cable (WF53) (3) on the fan case support-ring with the bolt (5), washer (4) and nut (6). Tighten the nut (6) with your fingers.
4 Install the ground cable (WF53) (3) on the fan case flange A with the screw (9) and the nut (8). Tighten the nut (8) with your fingers.
5 Apply the
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
6 Install the ground cable (WF53) (3) on the two studs with the two clamps (19) and the nuts (20). Tighten the nuts (20) with your fingers.
7 Install the ground cable (WF53) (3) on the two brackets with the two clamps (19) and the bolts (5). Tighten them with your fingers.
8 TORQUE the nut (6) to between 100 and 90 lbf.in (1.13 and 1.02 m.daN )
.9 TORQUE the nut (8) to between 80 and 70 lbf.in (0.90 and 0.79 m.daN )
.10 TORQUE the two nuts (20) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.11 TORQUE the two bolts (5) to between 70 and 60 lbf.in (0.79 and 0.68 m.daN )
.12 Install the air inlet cowl ground cable to the ground cable (WF53) (3) flange A screw (9) (Ref. AMM TASK 71-61-13-400-801).
(e) Install the ground cable (WF50) (29) on the fan case as follows:
1 Apply the
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
2 Apply the
3 Install the ground cable (WF50) (29) on the fan case support-ring with the bolt (5), washer (4) and nut (6). Tighten the nut (6) with your fingers.
4 Install the ground cable (WF50) (29) on the fan case flange A with the screw (9) and the nut (8). Tighten the nut (8) with your fingers.
5 Apply the
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
6 Install the ground cable (WF50) (29) on the two brackets and the studs with the two clamps (19) and the nuts (20). Tighten the nuts (20) with your fingers.
7 Install the ground cable (WF50) (29) on the four studs with the four clamps (19) and the nuts (20).
8 TORQUE the nut (6) to between 100 and 90 lbf.in (1.13 and 1.02 m.daN )
.9 TORQUE the nut (8) to between 80 and 70 lbf.in (0.90 and 0.79 m.daN )
.10 TORQUE the six nuts (20) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.(f) Install the air inlet cowl ground cable to the ground cable (WF50) (29) flange A screw (9) (Ref. AMM TASK 71-61-13-400-801).
(g) Install the bushing (2) on the fan case support-ring with the two bolts (1). See the sheet 5 of the figure:
(h) TORQUE the two bolts (1) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.(i) Install the ground cable (WF51) (39) on the fan case as follows:
1 Apply the
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
2 Apply the
3 Install the ground cable (WF51) (39) on the fan case support-ring with the bolt (5), washer (4) and nut (6). Tighten the nut (6) with your fingers.
4 Install the ground cable (WF51) (39) on fan case flange A with the screw (9) and the nut (8). Tighten the nut (8) with your fingers.
5 Apply the
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
6 Install the ground cable (WF51) (39) on the two brackets and the studs with the two clamps (19) and the nuts (20). Tighten the nuts (20) with your fingers.
7 Install the ground cable (WF51) (39) on the two studs with the two clamps (19) and the nuts (20). Tighten the nuts (20) with your fingers.
8 Install the bracket (49), the ground cable (WF51) (39), the two clamps (19) and the four nuts (20) on the four studs.
9 TORQUE the nut (6) to between 100 and 90 lbf.in (1.13 and 1.02 m.daN )
.10 TORQUE the nut (8) to between 80 and 70 lbf.in (0.90 and 0.79 m.daN )
.11 TORQUE the eight nuts (20) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.12 Install the air inlet cowl ground cable to the ground cable (WF51) (39) flange A screw (9) (Ref. AMM TASK 71-61-13-400-801).
(j) Install the bracket (59), plate (61) and bracket (62) on the fan case as follows. See the sheet 7 of the figure:
1 Apply the
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
2 Install the bracket (59) on the three studs with the three nuts (20). Tighten the nuts with your fingers.
3 Install the bracket (62) on the four studs with the four nuts (20).
4 TORQUE the seven nuts (20) to between 30 and 26 lbf.in (0.34 and 0.29 m.daN )
.5 Install the plate (61) on the bracket (59) with the four bolts (60).
6 TORQUE the four bolts (60) to between 44 and 38 lbf.in (0.50 and 0.43 m.daN )
.(k) Install the six plates (63) and the plate (64) on the bracket (62) as follows:
1 Apply the
a For the new or refurbished bolts or nuts with baked-on lubricant, do not do the wet application.
2 Install the six plates (63) on the bracket (62) with the 12 bolts (60). Tighten them with your fingers.
3 Install the plate (64) on the bracket (62) with the two bolts (60). Tighten them with your fingers.
4 Install the six bolts (60) on the bracket (62).
5 TORQUE the 20 bolts (60) to between 44 and 38 lbf.in (0.50 and 0.43 m.daN )
.(3) Examine the assembly for foreign objects, damage and correct assembly.
Subtask 72-21-01-410-067-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL, 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL, 462AR.
Subtask 72-21-01-440-055-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
451AL, 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
461AL, 462AR.
B. Do the reactivation of the thrust reverser system after ground maintenance (Ref. AMM TASK 78-30-00-440-805).
Subtask 72-21-01-410-068-A ** ON A/C NOT FOR ALL
Installation of the Fan Case Externals