Borescope Inspection of the Stage 1 High Pressure Turbine (HPT) Shrouds [CFML]
TASK 72-00-00-290-820-A
Borescope Inspection of the Stage 1 High Pressure Turbine (HPT) Shrouds
This procedure uses a flexible borescope to do a 360-degree inspection of the stage 1 HPT shrouds.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 72-00-00-941-247-A
Subtask 72-00-00-010-334-A
(2) Move the end of the 956A1603G01 GUIDE TUBES, BORESCOPE into the hole in the stage-1 HPT nozzle and into the flowpath.
(3) Put the BORESCOPE - FLEXIBLE into the 956A1603G01 GUIDE TUBES, BORESCOPE and extend it into the stage-1 HPT flowpath.
(4) Continue to move the BORESCOPE - FLEXIBLE in the direction set by the stage-1 HPT nozzle-vanes.
(5) Move the BORESCOPE - FLEXIBLE across the top of the engine 360 degrees around the engine until you can see the BORESCOPE - FLEXIBLE.
(6) Inspection limits for the stage-1 HPT shrouds:
(7) Examine all 18 stage-1 HPT shrouds as you pull the BORESCOPE - FLEXIBLE back around the full 360-degree path.
(8) Do an inspection of the mid-chord of the stage-1 HPT stator shrouds (the area of the stage-1 HPT stator-shrouds between the blades) and the LE of the stage-1 HPT stator-shrouds.
(9) If you use the guide tube, put the 956A1603G01 GUIDE TUBES, BORESCOPE into HPT case port S.
(10) Move the end of the 956A1603G01 GUIDE TUBES, BORESCOPE into the hole in the stage-2 HPT nozzle and into the flowpath.
(11) Put the BORESCOPE - FLEXIBLE into the 956A1603G01 GUIDE TUBES, BORESCOPE and extend it into the stage-2 HPT flowpath.
(12) Continue to move the BORESCOPE - FLEXIBLE in the direction set by the stage-2 HPT nozzle-vanes.
(13) Move the BORESCOPE - FLEXIBLE across the top of the engine, 360 degrees around the engine until you can see the BORESCOPE - FLEXIBLE.
(14) Examine all 18 stage-1 HPT shrouds as you pull the BORESCOPE - FLEXIBLE back around the full 360-degree path.
(15) Do an inspection of the mid-chord of the stage-1 HPT stator-shrouds (the area of the stage-1 HPT stator-shrouds between the blades) and the TE of the stage-1 HPT stator-shrouds.
Subtask 72-00-00-410-289-A
Subtask 72-00-00-410-290-A
[Rev.10 from 2021]
2026.04.01 13:03:40 UTC
Borescope Inspection of the Stage 1 High Pressure Turbine (HPT) Shrouds
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobThis procedure uses a flexible borescope to do a 360-degree inspection of the stage 1 HPT shrouds.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M(3 FT) |
| No specific | 1 | BORESCOPE - FLEXIBLE |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 97 and 83 lbf.in (1.10 and 0.94 m.daN ) ![]() | |
| 956A1603G01 | 2 | GUIDE TUBES, BORESCOPE |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP2101) | graphite grease |
| (Material No.CP2619) | Never Seez-Pure Nickel, Special |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 400 | POWER PLANT, NACELLES AND PYLONS |
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-803-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-803-A | Closing of the Fan Cowl Doors |
| TASK 72-00-00-290-812-A | Engine Borescope Examination Preparation |
| TASK 72-00-00-290-815-A | Borescope Inspection of the Stage 2 High Pressure Turbine (HPT) Nozzle Guide Vanes (NGVs) |
| TASK 78-30-00-040-809-A | Deactivation of the Thrust Reverser System for Ground Maintenance |
| TASK 78-30-00-440-809-A | Reactivation of the Thrust Reverser System after Ground Maintenance |
| TASK 78-36-00-010-806-A | Opening of the Thrust Reverser Cowl Doors |
| TASK 78-36-00-410-806-A | Closing of the Thrust Reverser Cowl Doors |
Subtask 72-00-00-941-247-A
A. Safety Precautions
(1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Put a WARNING NOTICE(S) in position to tell persons not to operate:
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
Subtask 72-00-00-010-332-A (1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Put a WARNING NOTICE(S) in position to tell persons not to operate:
- The ENG/MODE selector switch
- The ENG/MASTER 1(2) control switch.
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
B. Get Access
(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
(2) Put an ACCESS PLATFORM 1M(3 FT) in position.
Subtask 72-00-00-040-161-A (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR
(2) Put an ACCESS PLATFORM 1M(3 FT) in position.
C. Deactivation of the Thrust Reverser System for Maintenance
Subtask 72-00-00-010-333-A WARNING:
YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
(1) Do the deactivation of the thrust reverser system for ground maintenance (Ref. AMM TASK 78-30-00-040-809). D. Get Access
(1) Open the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-010-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
461AL 462AR
4. Procedure(1) Open the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-010-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
461AL 462AR
Subtask 72-00-00-010-334-A
A. Removal of the port R and S borescope plug from the HPT case
(1) Remove the port R borescope plug from the HPT case. This port gives access for the inspection of the Leading Edge (LE) of the stage 1 HPT shroud (Ref. AMM TASK 72-00-00-290-812).
(2) Remove the port S borescope plug from the HPT case. This port gives access for the inspection of the Trailing Edge (TE) of the stage 1 HPT shroud (Ref. AMM TASK 72-00-00-290-812).
(3) Put an identification tag on each borescope plug.
Subtask 72-00-00-290-142-A (1) Remove the port R borescope plug from the HPT case. This port gives access for the inspection of the Leading Edge (LE) of the stage 1 HPT shroud (Ref. AMM TASK 72-00-00-290-812).
(2) Remove the port S borescope plug from the HPT case. This port gives access for the inspection of the Trailing Edge (TE) of the stage 1 HPT shroud (Ref. AMM TASK 72-00-00-290-812).
(3) Put an identification tag on each borescope plug.
CAUTION:
BE CAREFUL WHEN YOU MOVE THE FLEXIBLE BORESCOPE INTO THE ENGINE. YOU CAN EASILY DO DAMAGE TO THE BORESCOPE EQUIPMENT IF YOU ARE NOT CAREFUL.
CAUTION:
MAKE SURE THE TEMPERATURE OF THE ENGINE AND OF THE AREAS ADJACENT TO THE BORESCOPE INSPECTION PORTS IS LESS THAN 150 °F (65.6 °C). DO NOT DO A BORESCOPE INSPECTION IF THE ADJACENT AREAS ARE TOO HOT TO TOUCH. DO THE BORESCOPE INSPECTION WHEN THE ENGINE TEMPERATURE IS LESS THAN 150 F(65.6 C). THIS WILL PREVENT DAMAGE TO THE BORESCOPE EQUIPMENT.
CAUTION:
WHEN YOU DO THE INSPECTION, MAKE SURE THAT YOU SEE THE POINT WHERE THE FLEXSCOPE IS BETWEEN THE TWO VANES OF THE STAGE 1(2) HPT NOZZLE. THIS WILL LET YOU DO A FULL 360-DEGREE INSPECTION.
B. Do a 360-degree borescope inspection of the stage-1 HPT shrouds as follows: | Component | Quantity of Segments |
|---|---|
| Stage-1 HPT shroud segments | 18 |
NOTE: The BORESCOPE - FLEXIBLE with a minimum length of 90 in. (2.29 m) is necessary to do the 360-degree borescope inspection of the HPT stage-1 shrouds. If you use the 956A1603G01 GUIDE TUBES, BORESCOPE, the BORESCOPE - FLEXIBLE (with a diameter of 0.15 in. (4 mm)) is necessary to do this inspection.
NOTE: It is optional to use the BORESCOPE - FLEXIBLE (with a diameter of 0.24 in. (6 mm)) without the 956A1603G01 GUIDE TUBES, BORESCOPE.
(1) If you use the guide tube, put the 956A1603G01 GUIDE TUBES, BORESCOPE into HPT case port R. (2) Move the end of the 956A1603G01 GUIDE TUBES, BORESCOPE into the hole in the stage-1 HPT nozzle and into the flowpath.
(3) Put the BORESCOPE - FLEXIBLE into the 956A1603G01 GUIDE TUBES, BORESCOPE and extend it into the stage-1 HPT flowpath.
(4) Continue to move the BORESCOPE - FLEXIBLE in the direction set by the stage-1 HPT nozzle-vanes.
(5) Move the BORESCOPE - FLEXIBLE across the top of the engine 360 degrees around the engine until you can see the BORESCOPE - FLEXIBLE.
(6) Inspection limits for the stage-1 HPT shrouds:
| INSPECT/CHECK | MAXIMUM SERVICEABLE LIMITS | REMARKS |
|---|---|---|
| 1.The stage-1 HPT shroud for: | | NOTE: The inspection instructions and limits are applicable to the LE and the TE of the stage-1 HPT shrouds. |
| A.Blade rubs | There is no limit to the amount of permitted blade rubs. | |
| B.Cracks in the shroud base material | Any amount of 0.6 in. (15.24 mm) in length maximum. | |
| C.Cracks in the flow path coating | In the area 0.5 in. (12.70 mm) from the TE: Cracks in the coating of 1.5 in. (38.10 mm) in length maximum are permitted. In all other areas, any amount of 0.6 in. (15.24 mm) in length maximum. | |
| D.Missing flow path coating | In the areas that are 0.10 in. (2.54 mm) from the LE and the TE, any amount of missing coating and exposed base material is permitted. For the remaining areas that are more than 0.100 in. (2.54 mm) from the LE and the TE, a maximum sum of 0.250 in.2 (161.29 mm2) of missing coating on each shroud is permitted. Exposed base material, where the coating is completely missing, is not permitted in these areas. | For missing coating, over-serviceable limit extension, refer to H. If the shroud segment is missing complete circumferential EBC in or less than 0.100 in. (2.54 mm) of the TE, do an inspection of the LEs of the three adjacent stage 2 nozzle segments (Ref. AMM TASK 72-00-00-290-815). |
| E.Chipping of the shroud segment base material along the LE and the TE | Two chips on each shroud segment are permitted if the maximum length is less than 0.050 in. (1.27 mm) from the edge. | |
| F.Chipping of the shroud segment base material along the circumferential split line | A maximum axial length of 1.0 in. (25.4 mm) is permitted on up to 10 shroud segments, each end. | |
| G.Missing spline seals | Up to 18 missing or partially missing discourager spline seals and up to 10 missing or partially missing primary spline seal per engine is permissible. | |
| H.The over-serviceable limit extension for missing coating on the shroud segment flowpath surface | PRE SB LEAP-1A-72-00-0119-01A-930A-D Check the engine data plate for thrust rating 1A23, 1A24, 1A24E1, 1A26 and 1A26E1: A 500-cycle inspection interval is permitted with this condition:
A 200-cycle inspection interval is permitted with this condition:
| This over-serviceable limit extension is for a reduced interval. Do the inspection again. For the spline seals - missing material at the circumferential ends, refer to K. |
| J.The over-serviceable limit extension for missing coating on the shroud segment flowpath surface | POST SB LEAP-1A-72-00- 0119-01A-930A-D A 1600-cycle inspection interval is permitted with these conditions:
POST SB LEAP-1A-72-00- 0213-01A-930A-D A 1600-cycle inspection interval is permitted with this condition:
Remove the engine in ten cycles or less with this condition:
| This over-serviceable limit extension is for a reduced interval. Do the inspection again. For the spline seals - missing material at the circumferential ends, refer to K. |
| K.The over-serviceable limit extension for chipping of the shroud segment base material along the LE and the TE | A 800-cycle inspection interval is permitted with this condition:
| |
| L.The over-serviceable limit extension for chipping of the shroud segment base material along the circumferential split line | A 200-cycle inspection interval is permitted for the maximum limit that follows:
| |
(8) Do an inspection of the mid-chord of the stage-1 HPT stator shrouds (the area of the stage-1 HPT stator-shrouds between the blades) and the LE of the stage-1 HPT stator-shrouds.
(9) If you use the guide tube, put the 956A1603G01 GUIDE TUBES, BORESCOPE into HPT case port S.
(10) Move the end of the 956A1603G01 GUIDE TUBES, BORESCOPE into the hole in the stage-2 HPT nozzle and into the flowpath.
(11) Put the BORESCOPE - FLEXIBLE into the 956A1603G01 GUIDE TUBES, BORESCOPE and extend it into the stage-2 HPT flowpath.
(12) Continue to move the BORESCOPE - FLEXIBLE in the direction set by the stage-2 HPT nozzle-vanes.
(13) Move the BORESCOPE - FLEXIBLE across the top of the engine, 360 degrees around the engine until you can see the BORESCOPE - FLEXIBLE.
(14) Examine all 18 stage-1 HPT shrouds as you pull the BORESCOPE - FLEXIBLE back around the full 360-degree path.
(15) Do an inspection of the mid-chord of the stage-1 HPT stator-shrouds (the area of the stage-1 HPT stator-shrouds between the blades) and the TE of the stage-1 HPT stator-shrouds.
C. Install the port R and port S borescope plugs into the HPT case as follows:
(1) If used, remove the 956A1603G01 GUIDE TUBES, BORESCOPE from port R and port S.
(2) Remove the identification tag from the borescope plugs R and S before the installation of each plug.
(3) Do a visual inspection of the borescope plugs and the borescope ports (Ref. AMM TASK 72-00-00-290-812).
(4) Verify borescope plug antirotation feature quality:
(a) Holding the borescope plug in one hand and holding the area near the tab, turn the antirotation feature one full revolution.
(b) Replace the borescope plug if there is no clicking sound when you turn the antirotation feature in the clockwise or counterclockwise direction.
(5) Apply graphite grease (Material No.CP2101) orCP2619 Never Seez-Pure Nickel, Special to the threads of the port R and port S borescope plugs.
(6) Install the port R and port S borescope plugs into the HPT case.
(7) TORQUE the port R and port S borescope plugs to between 97 and 83 lbf.in (1.10 and 0.94 m.daN )
.
5. Close-up(1) If used, remove the 956A1603G01 GUIDE TUBES, BORESCOPE from port R and port S.
(2) Remove the identification tag from the borescope plugs R and S before the installation of each plug.
(3) Do a visual inspection of the borescope plugs and the borescope ports (Ref. AMM TASK 72-00-00-290-812).
(4) Verify borescope plug antirotation feature quality:
(a) Holding the borescope plug in one hand and holding the area near the tab, turn the antirotation feature one full revolution.
(b) Replace the borescope plug if there is no clicking sound when you turn the antirotation feature in the clockwise or counterclockwise direction.
(5) Apply graphite grease (Material No.CP2101) or
(6) Install the port R and port S borescope plugs into the HPT case.
(7) TORQUE the port R and port S borescope plugs to between 97 and 83 lbf.in (1.10 and 0.94 m.daN )
. Subtask 72-00-00-410-290-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
461AL 462AR
Subtask 72-00-00-440-153-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser cowl-doors (Ref. AMM TASK 78-36-00-410-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
451AL 452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
461AL 462AR
B. Do the reactivation of the thrust reverser system after ground maintenance (Ref. AMM TASK 78-30-00-440-809).
Subtask 72-00-00-410-291-A
Borescope Inspection of the Stage-1 HPT Shrouds