Detailed Inspection of the Pressure Relief Door
TASK 54-53-11-200-001-A
Detailed Inspection of the Pressure Relief Door
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 54-53-11-941-051-A ** ON A/C NOT FOR ALL
Subtask 54-53-11-210-051-A ** ON A/C NOT FOR ALL
Subtask 54-53-11-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:02:41 UTC
Detailed Inspection of the Pressure Relief Door
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 470 | ENGINE 1 AFT PYLON |
| 480 | ENGINE 2 AFT PYLON |
| 471BL, 482BR | |
| 471CL, 481CR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 54-53-11-000-002-A | Removal of the Pylon-to-Wing Access Panels |
| TASK 54-53-11-000-002-B | Removal of the Pylon-to-Wing Access Panels |
| TASK 54-53-11-400-002-A | Installation of the Pylon-to-Wing Access Panels |
| TASK 54-53-11-400-002-B | Installation of the Pylon-to-Wing Access Panels |
| TASK 78-30-00-040-012-A | Deactivation of the Thrust Reverser Hydraulic Control Unit (HCU) for Ground Maintenance |
| TASK 78-30-00-081-041-A | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-081-041-B | Make the Thrust Reverser Serviceable after Maintenance |
| TASK 78-30-00-440-012-A | Re-activation of the Thrust Reverser Hydraulic Control Unit (HCU) after Ground Maintenance |
| TASK 78-30-00-481-041-A | Make the Thrust Reverser Unserviceable for Maintenance |
| TASK 78-30-00-481-041-B | Make the Thrust Reverser Unserviceable for Maintenance |
Subtask 54-53-11-941-051-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that engine 1 (2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On overhead maintenance panel 50VU:
(a) Make sure that the ON legend of ENG/FADEC GND PWR/1 (2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize FADEC 1(2).
Subtask 54-53-11-040-051-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that engine 1 (2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On overhead maintenance panel 50VU:
(a) Make sure that the ON legend of ENG/FADEC GND PWR/1 (2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize FADEC 1(2).
B. Aircraft Maintenance Configuration
(1) Make the thrust reverser unserviceable (Ref. AMM TASK 78-30-00-481-041).
Subtask 54-53-11-040-051-B ** ON A/C NOT FOR ALL (1) Make the thrust reverser unserviceable (Ref. AMM TASK 78-30-00-481-041).
B. Aircraft Maintenance Configuration
(1) Make the thrust reverser unserviceable (Ref. AMM TASK 78-30-00-040-012).
Subtask 54-53-11-010-050-A ** ON A/C NOT FOR ALL (1) Make the thrust reverser unserviceable (Ref. AMM TASK 78-30-00-040-012).
C. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position:
(a) For the left pylon, in zone 470
(b) For the right pylon, in zone 480.
(2) Remove the access panels (Ref. AMM TASK 54-53-11-000-002):
(a) For the left pylon: 471BL
(b) For the right pylon: 482BR.
Subtask 54-53-11-010-050-B ** ON A/C NOT FOR ALL (1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position:
(a) For the left pylon, in zone 470
(b) For the right pylon, in zone 480.
(2) Remove the access panels (Ref. AMM TASK 54-53-11-000-002):
(a) For the left pylon: 471BL
(b) For the right pylon: 482BR.
C. Get Access
(1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position:
(a) For the left pylon, in zone 470
(b) For the right pylon, in zone 480.
(2) Remove the access panels (Ref. AMM TASK 54-53-11-000-002):
(a) For the left pylon: 471CL
(b) For the right pylon: 481CR.
4. Procedure(1) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position:
(a) For the left pylon, in zone 470
(b) For the right pylon, in zone 480.
(2) Remove the access panels (Ref. AMM TASK 54-53-11-000-002):
(a) For the left pylon: 471CL
(b) For the right pylon: 481CR.
Subtask 54-53-11-210-051-A ** ON A/C NOT FOR ALL
A. Inspection of the Pressure Relief Door
(1) Do a visual inspection of the bleed air duct.
(2) Do the inspection of the bleed air duct to make sure that there is no damage.
(3) Do the inspection of the automatic opening mechanism, the hinges, the adjacent structure of the pressure relief door. Make sure that there are no cracks, marks or damage.
(4) Replacement of the rivets of the automatic opening mechanism
(a) Remove the rivets of the pressure relief door (1),
(b) Install the news rivets (2).
Subtask 54-53-11-210-051-B ** ON A/C NOT FOR ALL (1) Do a visual inspection of the bleed air duct.
(2) Do the inspection of the bleed air duct to make sure that there is no damage.
(3) Do the inspection of the automatic opening mechanism, the hinges, the adjacent structure of the pressure relief door. Make sure that there are no cracks, marks or damage.
(4) Replacement of the rivets of the automatic opening mechanism
(a) Remove the rivets of the pressure relief door (1),
(b) Install the news rivets (2).
A. Inspection of the Pressure Relief Door
(1) Do a visual inspection of the bleed air duct.
(2) Do the inspection of the bleed air duct to make sure that there is no damage.
(3) Do the inspection of the automatic opening mechanism, the hinges, the adjacent structure of the pressure relief door. Make sure that there are no cracks, marks or damage.
5. Close-up(1) Do a visual inspection of the bleed air duct.
(2) Do the inspection of the bleed air duct to make sure that there is no damage.
(3) Do the inspection of the automatic opening mechanism, the hinges, the adjacent structure of the pressure relief door. Make sure that there are no cracks, marks or damage.
Subtask 54-53-11-410-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make the thrust reverser serviceable (Ref. AMM TASK 78-30-00-081-041).
Subtask 54-53-11-410-051-B ** ON A/C NOT FOR ALL (1) Make the thrust reverser serviceable (Ref. AMM TASK 78-30-00-081-041).
A. Aircraft Maintenance Configuration
(1) Make the thrust reverser serviceable (Ref. AMM TASK 78-30-00-440-012).
Subtask 54-53-11-440-051-A ** ON A/C NOT FOR ALL (1) Make the thrust reverser serviceable (Ref. AMM TASK 78-30-00-440-012).
B. Installation of the Panels
(1) Install the access panels (Ref. AMM TASK 54-53-11-400-002):
(a) For the left pylon: 471BL
(b) For the right pylon: 482BR.
Subtask 54-53-11-440-051-B ** ON A/C NOT FOR ALL (1) Install the access panels (Ref. AMM TASK 54-53-11-400-002):
(a) For the left pylon: 471BL
(b) For the right pylon: 482BR.
B. Installation of the Panels
(1) Install the access panels (Ref. AMM TASK 54-53-11-400-002):
(a) For the left pylon: 471CL
(b) For the right pylon: 481CR.
Subtask 54-53-11-942-051-A ** ON A/C NOT FOR ALL (1) Install the access panels (Ref. AMM TASK 54-53-11-400-002):
(a) For the left pylon: 471CL
(b) For the right pylon: 481CR.
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
Pressure Relief Door