Installation of the Bleed-Air Precooler-Exchanger Cold-Inlet
TASK 36-11-44-400-802-A
Installation of the Bleed-Air Precooler-Exchanger Cold-Inlet
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 36-11-44-860-051-A ** ON A/C NOT FOR ALL
Subtask 36-11-44-420-051-A ** ON A/C NOT FOR ALL
Subtask 36-11-44-865-057-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 12:38:09 UTC
Installation of the Bleed-Air Precooler-Exchanger Cold-Inlet
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING:
ALWAYS USE APPLICABLE GLOVES TO TOUCH HOT PARTS. HOT PARTS CAN CAUSE INJURY TO PERSONS.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
CAUTION:
BE VERY CAREFUL WHEN YOU DO WORK ON OR NEAR THE AIR-CONDITIONING DUCTS. THE DUCTS ARE MADE OF THIN MATERIAL AND YOU CAN EASILY BREAK THEM.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| 98L12003001000 | AR | HARNESS,SAFETY |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 413 | UPPER FWD PYLON |
| 423 | UPPER FWD PYLON |
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1) | |
| 413DT, 413ET | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2) | |
| 423DT, 423ET | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 2 | SEAL | AIPC 36-11-86-01-390 |
| 1 | DIFFUSER | AIPC 36-11-86-01-400 |
| 2 | SEAL | AIPC 36-11-86-02-390 |
| 1 | DIFFUSER | AIPC 36-11-86-02-400 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-00-00-481-002-A | Installation of the Wingrip |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 36-11-42-400-802-A | Installation of the Bleed-Air Precooler Exchanger |
| TASK 49-00-00-860-009-A | APU Shutdown by External Power (131-9(A)) |
| TASK 49-00-00-860-009-A-01 | APU Shutdown by Batteries (131-9(A)) |
| TASK 71-00-00-860-833-A | Procedure to Prevent Engine Motoring |
Subtask 36-11-44-860-051-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) On the overhead panel, on the AIR section of panel 30VU:
(Ref. AMM TASK 71-00-00-860-833).
(4) On the HP ground connectors:
Subtask 36-11-44-865-056-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) On the overhead panel, on the AIR section of panel 30VU:
- Make sure that the APU BLEED pushbutton switch is released (ON legend off).
- Make sure that the ENG BLEED pushbutton switch is released (OFF legend on).
- Make sure that a WARNING NOTICE(S) is in position to tell persons not to operate the APU and the engine bleed-air systems.
(Ref. AMM TASK 71-00-00-860-833).
(4) On the HP ground connectors:
- Make sure that a WARNING NOTICE(S) is in position to tell persons not to pressurize the pneumatic system.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 36-11-44-010-061-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
C. Aircraft Maintenance Configuration
(1) Make sure that an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position
(2) Make sure that these access panels are removed:
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
413DT 413ET
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
423DT 423ET
4. Procedure(1) Make sure that an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position
(2) Make sure that these access panels are removed:
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
413DT 413ET
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
423DT 423ET
Subtask 36-11-44-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the Bleed-Air Precooler-Exchanger Cold-Inlet
(1) If you use the APU to energize the electrical circuits, stop the APU:
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
(4) Do a visual inspection of the seals (2) and (4) of the bleed-air precooler-exchanger cold-inlet (1):
(6) Install the seal (2) on the structure (3).
(7) Put the bleed-air precooler-exchanger cold-inlet (1) in position on the fan air valve (5) through the structure (3).
(8) Make sure that there is no clearance between the bleed-air precooler-exchanger cold-inlet (1) and the seal (2).
(9) Install the bleed-air precooler-exchanger (Ref. AMM TASK 36-11-42-400-802).
5. Close-up(1) If you use the APU to energize the electrical circuits, stop the APU:
- For GTCP 36-300 APU (Ref. AMM D/O 49-00-00-86)
- For APS 3200 APU (Ref. AMM D/O 49-00-00-86)
- For 131-9(A) APU (Ref. AMM TASK 49-00-00-860-009).
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.(4) Do a visual inspection of the seals (2) and (4) of the bleed-air precooler-exchanger cold-inlet (1):
- If the seal (2) is damaged, discard and replace it with a new AIPC 36-11-86-01-390 SEAL (2) or AIPC 36-11-86-02-390 SEAL (2)
- If the seal (4) is damaged, discard and replace the bleed-air precooler-exchanger cold-inlet (1) with a new AIPC 36-11-86-01-400 DIFFUSER (1) or AIPC 36-11-86-02-400 DIFFUSER (1).
NOTE: The seal (4) is part of the bleed-air precooler-exchanger cold-inlet (1).
(5) Install the seal (4) on the fan air valve (5). (6) Install the seal (2) on the structure (3).
(7) Put the bleed-air precooler-exchanger cold-inlet (1) in position on the fan air valve (5) through the structure (3).
(8) Make sure that there is no clearance between the bleed-air precooler-exchanger cold-inlet (1) and the seal (2).
(9) Install the bleed-air precooler-exchanger (Ref. AMM TASK 36-11-42-400-802).
Subtask 36-11-44-865-057-A ** ON A/C NOT FOR ALL
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 36-11-44-410-055-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
B. Install these access panels:
(1) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
413DT 413ET
(2) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
423DT 423ET
Subtask 36-11-44-410-057-A ** ON A/C NOT FOR ALL (1) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
413DT 413ET
(2) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
423DT 423ET
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove all the fixtures, tools, test and support equipment used during this procedure.
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
Subtask 36-11-44-862-052-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove all the fixtures, tools, test and support equipment used during this procedure.
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
D. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
Bleed-Air Precooler-Exchanger Inlet