Installation of the Bleed-Air Precooler Exchanger
TASK 36-11-42-400-802-A
Installation of the Bleed-Air Precooler Exchanger
The weight of this equipment is approximately 41 kg (88 lb). Two persons are necessary to do this task.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 36-11-42-860-053-A ** ON A/C NOT FOR ALL
Subtask 36-11-42-420-054-A ** ON A/C NOT FOR ALL
Subtask 36-11-42-860-054-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:09:19 UTC
Installation of the Bleed-Air Precooler Exchanger
WARNING:
BE CAREFUL WHEN YOU REMOVE OR INSTALL THIS EQUIPMENT. THIS EQUIPMENT IS HEAVY (MORE THAN 12 KG (26.5 lb)) AND CAN CAUSE INJURY AND/OR DAMAGE.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING:
ALWAYS USE APPLICABLE GLOVES TO TOUCH HOT PARTS. HOT PARTS CAN CAUSE INJURY TO PERSONS.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
BE VERY CAREFUL WHEN YOU DO WORK ON OR NEAR THE AIR-CONDITIONING DUCTS. THE DUCTS ARE MADE OF THIN MATERIAL AND YOU CAN EASILY BREAK THEM.
1. Reason for the JobThe weight of this equipment is approximately 41 kg (88 lb). Two persons are necessary to do this task.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | 1 | CLOTH - PROTECTIVE |
| No specific | 1 | CRANE 100KG (220 LB) |
| No specific | 1 | FOIL - ALUMINUM |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | WARNING NOTICE(S) |
| No specific | 1 | WATER - SOAPY SOLUTION |
| No specific | Torque wrench: range to between 0.78 and 0.56 m.daN (69.03 and 49.56 lbf.in ) ![]() | |
| No specific | Torque wrench: range to between 1.41 and 1.30 m.daN (124.78 and 115.04 lbf.in ) ![]() | |
| No specific | Torque wrench: range to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) ![]() | |
| No specific | Torque wrench: range to between 2.69 and 2.24 m.daN (19.84 and 16.52 lbf.ft ) ![]() | |
| No specific | Torque wrench: range to between 3.2 and 2.9 m.daN (23.60 and 21.39 lbf.ft ) ![]() | |
| 98D27803000000 | 2 | LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION |
| 98L36103000000 | 1 | RI PRECOOLER |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14QEB1) | Wire-Locking Dia: 0.6 mm CRES Nickel Alloy - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 470 | ENGINE 1 AFT PYLON |
| 480 | ENGINE 2 AFT PYLON |
| 191DB | |
| FOR [7150HM1] (EXCHANGER-BLEED AIR PRECOOL) | |
| 413CT, 413DT, 413ET | |
| FOR [7150HM2] (EXCHANGER-BLEED AIR PRECOOL) | |
| 423CT, 423DT, 423ET | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 33 | SEAL | AIPC 36-11-86-01-240 |
| 22 | SEAL | AIPC 36-11-86-01-300 |
| 33 | SEAL | AIPC 36-11-86-02-240 |
| 22 | SEAL | AIPC 36-11-86-02-300 |
| 16 | SEAL | AIPC 36-11-86-02-310 |
| 17 | SEAL | AIPC 36-11-86-02-310 |
| 27 | SEAL | AIPC 36-11-86-02-360 |
| 30 | SEAL | AIPC 36-11-86-02-360 |
| 29 | SEAL | AIPC 36-11-86-02-370 |
| 26 | SEAL | AIPC 36-11-86-02-380 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 20-23-22-910-001-A | Marking of the Unions after Application of Standard or Specific Tightening Torque |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 27-00-00-480-002-A | Installation of the Flap/Slat Control-Lever Locking Tool (98D27803000000) |
| TASK 36-12-00-860-802-A | Pressurization of the Bleed System with the APU |
| TASK 36-12-00-860-803-A | Pressurization of the Bleed System through the HP Ground Connector |
| TASK 49-00-00-860-009-A | APU Shutdown by External Power (131-9(A)) |
| TASK 49-00-00-860-009-A-01 | APU Shutdown by Batteries (131-9(A)) |
| TASK 54-52-22-300-801-A | Replacement of the Upper Seals of the Bleed-Air Precooler Exchanger |
| TASK 71-00-00-860-833-A | Procedure to Prevent Engine Motoring |
| FOR [7150HM1] (EXCHANGER-BLEED AIR PRECOOL) | |
| TASK 54-52-11-000-805-A | Removal of the Access Skin Panels |
| TASK 54-52-11-400-805-A | Installation of the Access Skin Panels |
| FOR [7150HM2] (EXCHANGER-BLEED AIR PRECOOL) | |
| TASK 54-52-11-000-805-A | Removal of the Access Skin Panels |
| TASK 54-52-11-400-805-A | Installation of the Access Skin Panels |
Subtask 36-11-42-860-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position.
(3) Make sure that these access panels are removed:
(a) FOR [7150HM1] (EXCHANGER-BLEED AIR PRECOOL)
413CT, 413DT and 413ET (Ref. AMM TASK 54-52-11-000-805).
(b) FOR [7150HM2] (EXCHANGER-BLEED AIR PRECOOL)
423CT, 423DT and 423ET (Ref. AMM TASK 54-52-11-000-805).
Subtask 36-11-42-865-058-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that an ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE is in position.
(3) Make sure that these access panels are removed:
(a) FOR [7150HM1] (EXCHANGER-BLEED AIR PRECOOL)
413CT, 413DT and 413ET (Ref. AMM TASK 54-52-11-000-805).
(b) FOR [7150HM2] (EXCHANGER-BLEED AIR PRECOOL)
423CT, 423DT and 423ET (Ref. AMM TASK 54-52-11-000-805).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 36-11-42-941-054-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
C. Safety Precautions
(1) On AIR COND panel 30VU:
(Ref. AMM TASK 71-00-00-860-833).
(3) On the access door 191DB, on the HP ground connectors:
4. Procedure(1) On AIR COND panel 30VU:
- Make sure that the APU BLEED pushbutton switch is released (ON legend off).
- Make sure that the ENG 1(2) BLEED pushbutton switch is released (OFF legend on).
- Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the pneumatic system.
(Ref. AMM TASK 71-00-00-860-833).
(3) On the access door 191DB, on the HP ground connectors:
- Make sure that a WARNING NOTICE(S) is in position to tell persons not to pressurize the pneumatic system.
- Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is in position on the flap/slat control lever (Ref. AMM TASK 27-00-00-480-002).
- Make sure that the WARNING NOTICE(S) is in position on the flap/slat control lever to tell persons not to operate the flap/slat controls.
Subtask 36-11-42-420-054-A ** ON A/C NOT FOR ALL
A. Preparation of the Bleed-Air Precooler Exchanger
(1) If you use the APU to energize the electrical circuits, stop the APU:
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
(6) Remove the PLUG - BLANKING from the precooler exchanger (24).
(7) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 36-11-42-420-055-A ** ON A/C NOT FOR ALL (1) If you use the APU to energize the electrical circuits, stop the APU:
- For GTCP 36-300 APU (Ref. AMM D/O 49-00-00-86)
- For APS 3200 APU (Ref. AMM D/O 49-00-00-86)
- For 131-9(A) APU (Ref. AMM TASK 49-00-00-860-009).
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
(3) Do a visual inspection of the seals (26), (27), (29) and (30): - If the seal(s) is(are) damaged, discard it(them) and replace it(them) with a new AIPC 36-11-86-02-380 SEAL (26) and/or a new AIPC 36-11-86-02-360 SEAL (27) and/or a new AIPC 36-11-86-02-370 SEAL (29) and/or a new AIPC 36-11-86-02-360 SEAL (30).
- If the seal(s) is(are) damaged, discard it(them) and replace it (them) with a new AIPC 36-11-86-02-310 SEAL (16) and/or a new AIPC 36-11-86-02-310 SEAL (17).
(6) Remove the PLUG - BLANKING from the precooler exchanger (24).
(7) Make sure that the parts retained from the removed component are clean and in the correct condition.
B. Installation of the 98L36103000000 RI PRECOOLER Tool
(1) Make sure that the tool is clean and is in the correct condition.
(2) Attach the 98L36103000000 RI PRECOOLER tool to the CRANE 100KG (220 LB).
(3) Put the CRANE 100KG (220 LB) in position with the 98L36103000000 RI PRECOOLER tool above the precooler exchanger (24).
(4) Attach the 98L36103000000 RI PRECOOLER tool to the hoisting points of the precooler exchanger (24).
(5) Obey the tool instructions to install the four links (44) on the precooler exchanger (24).
Subtask 36-11-42-420-056-A ** ON A/C NOT FOR ALL (1) Make sure that the tool is clean and is in the correct condition.
(2) Attach the 98L36103000000 RI PRECOOLER tool to the CRANE 100KG (220 LB).
(3) Put the CRANE 100KG (220 LB) in position with the 98L36103000000 RI PRECOOLER tool above the precooler exchanger (24).
(4) Attach the 98L36103000000 RI PRECOOLER tool to the hoisting points of the precooler exchanger (24).
(5) Obey the tool instructions to install the four links (44) on the precooler exchanger (24).
C. Installation of the Bleed-Air Precooler Exchanger
(2) Remove the PLUG - BLANKING from the end(s) of the disconnected duct(s).
(3) Carefully lift the 98L36103000000 RI PRECOOLER tool with the CRANE 100KG (220 LB) until it holds the weight of the precooler exchanger (24).
(5) Put the precooler exchanger (24) in position on the supports (25).
(7) Attach the precooler exchanger (24) to the supports (25).
(b) Install the washer (41) and bolt (40) on the precooler exchanger (24). Do not torque the bolt (40) at this time.
(c) Install the washer (43) and bolt (42) on the precooler exchanger (24). Do not torque the bolt (42) at this time.
(d) Install the washer (35) and bolt (36) on the precooler exchanger (24). Do not torque the bolt (36) at this time.
(e) Install the washer (38) and bolt (37) on the precooler exchanger (24). Do not torque the bolt (37) at this time.
(8) Do an electrical bonding of the precooler exchanger aft-right fixation (Ref. AMM TASK 20-28-00-912-802).
(9) TORQUE the four bolts (40), (42), (36) and (37) to between 2.69 and 2.24 m.daN (19.84 and 16.52 lbf.ft )
.
(10) Identify the four tightened bolts (40), (42), (36) and (37) with a red line (Ref. AMM TASK 20-23-22-910-001).
(11) Connect the duct (31).
(a) Install the clamp (32) that attaches the precooler exchanger (24) to the duct (31).
(b) Put the clamp nut (32) in the correct position for the best tool access.
(c) TORQUE the nut on the clamp (32) to between 1.41 and 1.30 m.daN (124.78 and 115.04 lbf.in )
.
(d) Identify the tightened nut of the clamp (32) with a red line (Ref. AMM TASK 20-23-22-910-001).
(12) Install the bellows (20).
(a) Install a new AIPC 36-11-86-01-300 SEAL (22)AIPC 36-11-86-02-300 SEAL (22) on the bellows (20).
(b) Put the bellows (20) in position on the precooler exchanger (24).
(c) Install the clamps (18) and (21) on the bellows (20).
(d) Put the clamp nuts (18) and (21) in the correct position for the best tool access, but not near to the OverHeat Detection System (OHDS) or environment.
(e) TORQUE the nut on the clamp (21) to between 1.41 and 1.30 m.daN (124.78 and 115.04 lbf.in )
.
(f) TORQUE the nut on the clamp (18) to between 0.78 and 0.56 m.daN (69.03 and 49.56 lbf.in )
.
(g) Identify the tightened nuts of the clamps (18) and (21) with a red line (Ref. AMM TASK 20-23-22-910-001).
(13) Connect the pipes (23), (39) and (34) to the precooler exchanger (24).
(a) Loosen the nut of the pipe (39) connected to the pylon floor.
(b) Connect the pipe (39) to the precooler exchanger (24).
(c) TORQUE the nut of the pipes (23), (39) and (34) connected to the precooler to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
.
(d) TORQUE the nut of the pipe (39) connected to the pylon floor to between 3.2 and 2.9 m.daN (23.60 and 21.39 lbf.ft )
.
(e) Identify the tightened union nuts of the pipes (23), (39) and (34) with a red line (Ref. AMM TASK 20-23-22-910-001).
Subtask 36-11-42-410-052-A ** ON A/C NOT FOR ALL CAUTION:
WHEN YOU INSTALL THE FASTENERS OF THE PRECOOLER, DO NOT APPLY TOO MUCH FORCE. IF YOU DO NOT OBEY THIS PRECAUTION, YOU CAN CAUSE DAMAGE TO THE BRACKETS.
(1) Make sure that the work area is clean and clear of tools and other items.(2) Remove the PLUG - BLANKING from the end(s) of the disconnected duct(s).
(3) Carefully lift the 98L36103000000 RI PRECOOLER tool with the CRANE 100KG (220 LB) until it holds the weight of the precooler exchanger (24).
NOTE: The precooler exchanger (24) weighs 41.2 kg.
(4) Install a new AIPC 36-11-86-01-240 SEAL (33)AIPC 36-11-86-02-240 SEAL (33) on the duct (31). (5) Put the precooler exchanger (24) in position on the supports (25).
NOTE: Make sure that you do not damage to the duct (31) when you put the precooler exchanger (24) in position on the supports (25).
(a) Use the metal tubes (46) and (47) to install the precooler exchanger (24) in the correct position. NOTE: The metal tubes (46) go into the guide rail (45).
(6) Remove the 98L36103000000 RI PRECOOLER tool from the precooler exchanger (24). (7) Attach the precooler exchanger (24) to the supports (25).
CAUTION:
MAKE SURE THAT YOU INSTALL THE BOLTS IN THE CORRECT SEQUENCE. IF YOU DO NOT OBEY THIS PRECAUTION, YOU CAN CAUSE DAMAGE TO THE SUPPORTS AND THE PRECOOLER EXCHANGER.
(a) Make sure that the positions of the bolts (40), (42), (36) and (37) agree with the positions you recorded at the removal. (b) Install the washer (41) and bolt (40) on the precooler exchanger (24). Do not torque the bolt (40) at this time.
(c) Install the washer (43) and bolt (42) on the precooler exchanger (24). Do not torque the bolt (42) at this time.
(d) Install the washer (35) and bolt (36) on the precooler exchanger (24). Do not torque the bolt (36) at this time.
(e) Install the washer (38) and bolt (37) on the precooler exchanger (24). Do not torque the bolt (37) at this time.
(8) Do an electrical bonding of the precooler exchanger aft-right fixation (Ref. AMM TASK 20-28-00-912-802).
(9) TORQUE the four bolts (40), (42), (36) and (37) to between 2.69 and 2.24 m.daN (19.84 and 16.52 lbf.ft )
. (10) Identify the four tightened bolts (40), (42), (36) and (37) with a red line (Ref. AMM TASK 20-23-22-910-001).
(11) Connect the duct (31).
(a) Install the clamp (32) that attaches the precooler exchanger (24) to the duct (31).
(b) Put the clamp nut (32) in the correct position for the best tool access.
(c) TORQUE the nut on the clamp (32) to between 1.41 and 1.30 m.daN (124.78 and 115.04 lbf.in )
. (d) Identify the tightened nut of the clamp (32) with a red line (Ref. AMM TASK 20-23-22-910-001).
(12) Install the bellows (20).
(a) Install a new AIPC 36-11-86-01-300 SEAL (22)AIPC 36-11-86-02-300 SEAL (22) on the bellows (20).
(b) Put the bellows (20) in position on the precooler exchanger (24).
(c) Install the clamps (18) and (21) on the bellows (20).
(d) Put the clamp nuts (18) and (21) in the correct position for the best tool access, but not near to the OverHeat Detection System (OHDS) or environment.
(e) TORQUE the nut on the clamp (21) to between 1.41 and 1.30 m.daN (124.78 and 115.04 lbf.in )
. (f) TORQUE the nut on the clamp (18) to between 0.78 and 0.56 m.daN (69.03 and 49.56 lbf.in )
. (g) Identify the tightened nuts of the clamps (18) and (21) with a red line (Ref. AMM TASK 20-23-22-910-001).
(13) Connect the pipes (23), (39) and (34) to the precooler exchanger (24).
(a) Loosen the nut of the pipe (39) connected to the pylon floor.
(b) Connect the pipe (39) to the precooler exchanger (24).
(c) TORQUE the nut of the pipes (23), (39) and (34) connected to the precooler to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
. (d) TORQUE the nut of the pipe (39) connected to the pylon floor to between 3.2 and 2.9 m.daN (23.60 and 21.39 lbf.ft )
. (e) Identify the tightened union nuts of the pipes (23), (39) and (34) with a red line (Ref. AMM TASK 20-23-22-910-001).
D. Installation of the Components
(1) Install the rib and the half-seal guillotine assembly (6) as follows:
(a) Put the rib and the half-seal guillotine assembly (6) in their correct position on the fairing support (15).
(b) Put a CLOTH - PROTECTIVE on the upper spar over the precooler aft duct-flange.
(d) Put the washers (11), the bolts (12) and the nuts (9) in their position and tighten them.
(e) Put the bolts (10) and the nuts (7) in their position and tighten them.
(2) Install the upper seals (2), (3), (4) and (5) of the bleed-air precooler exchanger as follows:
(a) Do a visual inspection of the upper seals of the bleed-air precooler exchanger.
(b) Make sure that there are no:
Subtask 36-11-42-865-059-A ** ON A/C NOT FOR ALL (1) Install the rib and the half-seal guillotine assembly (6) as follows:
(a) Put the rib and the half-seal guillotine assembly (6) in their correct position on the fairing support (15).
(b) Put a CLOTH - PROTECTIVE on the upper spar over the precooler aft duct-flange.
NOTE: This is to make sure that the nuts do not go into the precooler if they fall.
(c) Put the washers (13), the bolts (14) and the nuts (8) in their position and tighten them. (d) Put the washers (11), the bolts (12) and the nuts (9) in their position and tighten them.
(e) Put the bolts (10) and the nuts (7) in their position and tighten them.
(2) Install the upper seals (2), (3), (4) and (5) of the bleed-air precooler exchanger as follows:
(a) Do a visual inspection of the upper seals of the bleed-air precooler exchanger.
(b) Make sure that there are no:
- Burned color
- Cracks during the visual inspection
- Cracks when you push/pull them
- Silicone parts removed from the seals.
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 36-11-42-710-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
F. Do this test:
(1) Pressurize the bleed system through the HP ground connector (Ref. AMM TASK 36-12-00-860-803) or with the APU (Ref. AMM TASK 36-12-00-860-802).
(2) On AIR COND panel 30VU, set the X-BLEED selector to OPEN.
(3) If you pressurize the bleed system through the HP ground connector, the supplied pressure of 30 psi (2.07 bar) must be stable.
(4) Make sure that there are no leaks at the junctions downstream and upstream of the precooler exchanger (24) and between the wing duct and the bellows (20).
2 Twist tight the seam of the foil wrap.
3 Make the foil wrap as tight as possible on the tube but do not rip the wrap.
14QEB1 Wire-Locking Dia: 0.6 mm CRES Nickel Alloy - .
5 Do a leak check:
5. Close-up(1) Pressurize the bleed system through the HP ground connector (Ref. AMM TASK 36-12-00-860-803) or with the APU (Ref. AMM TASK 36-12-00-860-802).
(2) On AIR COND panel 30VU, set the X-BLEED selector to OPEN.
(3) If you pressurize the bleed system through the HP ground connector, the supplied pressure of 30 psi (2.07 bar) must be stable.
(4) Make sure that there are no leaks at the junctions downstream and upstream of the precooler exchanger (24) and between the wing duct and the bellows (20).
NOTE: There are two procedures to do a leak check at the connections of the bleed air ducts (duct joint, flexible connections).
(a) Soap solution procedure. - Leaks are permitted if the WATER - SOAPY SOLUTION stays on the joint line with a continuous series of bubbles. This shows that the leaks are not important.
- Leaks are not permitted if the air pressure (from the air source) blows the soap solution off the joint line and prevents a continuous series of bubbles.
NOTE: This procedure is recommended when you do a leak check with hot air.
1 Wind the FOIL - ALUMINUM on the joint once. 2 Twist tight the seam of the foil wrap.
3 Make the foil wrap as tight as possible on the tube but do not rip the wrap.
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
4 Attach the foil wrap at the two sides of the pneumatic joint with 5 Do a leak check:
- If there is a leak, the foil installed on the duct breaks or becomes too hot.
Subtask 36-11-42-860-054-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Put the aircraft back to its initial configuration.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install these access panels:
(a) FOR [7150HM1] (EXCHANGER-BLEED AIR PRECOOL)
413CT, 413DT and 413ET (Ref. AMM TASK 54-52-11-400-805).
(b) FOR [7150HM2] (EXCHANGER-BLEED AIR PRECOOL)
423CT, 423DT and 423ET (Ref. AMM TASK 54-52-11-400-805).
(4) Remove all the fixtures, tools, test and support equipment used during this procedure.
(5) Remove the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the flap/slat control lever on panel 114VU.
(6) Remove the access platform(s).
(7) Remove the WARNING NOTICE(S).
(8) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
(1) Put the aircraft back to its initial configuration.
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Install these access panels:
(a) FOR [7150HM1] (EXCHANGER-BLEED AIR PRECOOL)
413CT, 413DT and 413ET (Ref. AMM TASK 54-52-11-400-805).
(b) FOR [7150HM2] (EXCHANGER-BLEED AIR PRECOOL)
423CT, 423DT and 423ET (Ref. AMM TASK 54-52-11-400-805).
(4) Remove all the fixtures, tools, test and support equipment used during this procedure.
(5) Remove the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the flap/slat control lever on panel 114VU.
(6) Remove the access platform(s).
(7) Remove the WARNING NOTICE(S).
(8) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
Bleed-Air Precooler Exchanger