Operational Test of the ATC
TASK 34-52-00-710-003-A
Operational Test of the ATC
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 34-52-00-860-080-C ** ON A/C NOT FOR ALL
Subtask 34-52-00-710-055-B ** ON A/C NOT FOR ALL
Subtask 34-52-00-860-062-A
[Rev.10 from 2021]
2026.04.01 12:36:08 UTC
Operational Test of the ATC
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 34-10-00-860-002-A | ADIRS Start Procedure |
| TASK 34-10-00-860-005-A | ADIRS Stop Procedure |
Subtask 34-52-00-860-080-C ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(3) On the center pedestal, on the ATC/TCAS control unit, set:
Subtask 34-52-00-860-080-H ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(3) On the center pedestal, on the ATC/TCAS control unit, set:
- the ATC system 1(2) on.
- the ALT RPTG ON/OFF switch to ON.
- the AUTO/ON/STBY switch to AUTO.
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(3) On the center pedestal, on the ATC/TCAS control unit, set:
Subtask 34-52-00-860-080-X ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(3) On the center pedestal, on the ATC/TCAS control unit, set:
- the ATC system 1(2) on.
- the ALT RPT ON/OFF switch to ON.
- the SBY/ON/TA/RA-TA switch to SBY.
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(3) On the center pedestal, on the ATC/TCAS control unit, set:
Subtask 34-52-00-865-054-A (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the ADIRS start procedure (Ref. AMM TASK 34-10-00-860-002).
(3) On the center pedestal, on the ATC/TCAS control unit, set:
- the ATC system 1(2) on.
- the STBY/ALT RPTG OFF/XPNDR/TA ONLY/TA-RA switch to XPNDR.
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | COM NAV/ATC/1 | 5SH1 | G11 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/ATC/2 | 5SH2 | K07 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | T/TISS | 2004SG | K07 |
Subtask 34-52-00-710-055-B ** ON A/C NOT FOR ALL
A. Transmission Test
Subtask 34-52-00-710-055-H ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| On the ATC/TCAS control unit: | |
| On the ATC/TCAS control unit:
|
| On the ATC/TCAS control unit:
|
A. Transmission Test
Subtask 34-52-00-710-055-J ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| On the ATC/TCAS control unit: | |
| On the ATC/TCAS control unit:
|
| On the ATC control unit:
|
A. Transmission Test
5. Close-up| ACTION | RESULT |
|---|---|
| On the ATC/TCAS control unit: | |
| On the ATC/TCAS control unit:
|
| On the ATC/TCAS control unit:
|
Subtask 34-52-00-860-062-A
A. Put the aircraft back to its initial configuration.
(1) Do the ADIRS Stop Procedure (Ref. AMM TASK 34-10-00-860-005).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(3) Make sure that the work area is clean and clear of tools and other items.
(1) Do the ADIRS Stop Procedure (Ref. AMM TASK 34-10-00-860-005).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(3) Make sure that the work area is clean and clear of tools and other items.