Operational Test of the Circuit Breaker Monitoring System
TASK 31-50-00-710-005-A
Operational Test of the Circuit Breaker Monitoring System
Make sure that the warnings related to the monitoring of the circuit breakers show correctly on the upper ECAM display.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 31-50-00-860-058-A
Subtask 31-50-00-710-055-A ** ON A/C NOT FOR ALL
Subtask 31-50-00-860-059-A
[Rev.10 from 2021]
2026.04.01 00:37:09 UTC
Operational Test of the Circuit Breaker Monitoring System
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
ZONE: 210
1. Reason for the JobMake sure that the warnings related to the monitoring of the circuit breakers show correctly on the upper ECAM display.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 822 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
Subtask 31-50-00-860-058-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002)
(2) Do the EIS start procedure (ECAM, F/O PFD and F/O ND only). (Ref. AMM TASK 31-60-00-860-001)
Subtask 31-50-00-010-052-A (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002)
(2) Do the EIS start procedure (ECAM, F/O PFD and F/O ND only). (Ref. AMM TASK 31-60-00-860-001)
B. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 822.
(2) Open the access door 822.
(3) On the battery power center 105VU:
Subtask 31-50-00-865-056-A (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 822.
(2) Open the access door 822.
(3) On the battery power center 105VU:
- loosen the two screws and remove the protective cover.
- loosen the five screws and remove the protective cover.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | NAV/MMR/1 | 42RT1 | G12 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | NAV/ILS/1 | 1RT1 | G12 |
| ** ON A/C ALL | |||
| 105VU | ELEC/BAT BUS/REF/BCL2 | 8PB2 | J02 |
| 106VU | ESS TR/SPLY | 4PE | C01 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/MMR/2 | 42RT2 | K09 |
| ** ON A/C ALL | |||
| 121VU | EIS/ND/F/O | 12WT2 | R04 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/ILS/2 | 1RT2 | K09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/MMR/2 | 42RT2 | L07 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | DOORS/PAX/MONG | 1MQ | T13 |
| ** ON A/C ALL | |||
| 122VU | LIGHTING/CABIN/EMER/LT | 3WL | V07 |
| 122VU | ANTI ICE/WIPER/CAPT | 4DB1 | X12 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | DOORS CKPT LOCK | 1MQ | T13 |
| 122VU | COCKPIT DOOR LOCK SYSTEM | 1MQ | T13 |
Subtask 31-50-00-710-055-A ** ON A/C NOT FOR ALL
A. Test
Subtask 31-50-00-710-055-B ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| 1.On the overhead panel 49VU : | |
|
|
|
|
| 2.On the rear C/B panel 122VU : | |
|
|
|
|
|
|
|
|
| 3.On the rear C/B panel 121VU : | |
|
|
|
|
|
|
|
|
| 4.In the lateral left section of the Avionics Compartment, on the AC/DC emergency power center 106VU : | |
|
|
|
|
5.In the Avionics Compartment, on the battery power center 105VU :
|
|
|
|
A. Test
Subtask 31-50-00-710-055-C ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| 1.On the overhead panel 49VU : | |
|
|
|
|
| 2.On the rear C/B panel 122VU : | |
|
|
|
|
|
|
|
|
|
|
|
|
| 3.On the rear C/B panel 121VU : | |
|
|
|
|
|
|
|
|
| 4.In the lateral left section of the Avionics Compartment, on the AC/DC emergency power center 106VU : | |
|
|
|
|
5.In the Avionics Compartment, on the battery power center 105VU :
|
|
|
|
A. Test
Subtask 31-50-00-710-055-D ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| 1.On the overhead panel 49VU : | |
|
|
|
|
| 2.On the rear C/B panel 122VU : | |
|
|
|
|
|
|
|
|
| 3.On the rear C/B panel 121VU : | |
|
|
|
|
|
|
|
|
| 4.In the lateral left section of the Avionics Compartment, on the AC/DC emergency power center 106VU : | |
|
|
|
|
5.In the Avionics Compartment, on the battery power center 105VU :
|
|
|
|
A. Test
5. Close-up| ACTION | RESULT |
|---|---|
| 1.On the overhead panel 49VU : | |
|
|
|
|
| 2.On the rear C/B panel 122VU : | |
|
|
|
|
|
|
|
|
|
|
|
|
| 3.On the rear C/B panel 121VU : | |
|
|
|
|
|
|
|
|
| 4.In the lateral left section of the Avionics Compartment, on the AC/DC emergency power center 106VU : | |
|
|
|
|
5.In the Avionics Compartment, on the battery power center 105VU :
|
|
|
|
Subtask 31-50-00-860-059-A
A. Put the aircraft back to its initial configuration.
(1) On the ECAM control panel, set the UPPER DISPLAY and LOWER DISPLAY potentiometers to OFF.
On the panel 500VU, set the F/O PFD and ND potentiometers to OFF.
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002)
(3) Make sure that the work area is clean and clear of tools and other items.
Subtask 31-50-00-410-050-A (1) On the ECAM control panel, set the UPPER DISPLAY and LOWER DISPLAY potentiometers to OFF.
On the panel 500VU, set the F/O PFD and ND potentiometers to OFF.
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002)
(3) Make sure that the work area is clean and clear of tools and other items.
B. Close Access
(1) Install the protective cover on the battery power center 105VU.
(2) Thighten the two screws.
(3) Install the protective cover on the AC/DC Emergency power center 106VU.
(4) Thighten the five screws.
(5) Close the access door 822.
(6) Remove the access platform.
(1) Install the protective cover on the battery power center 105VU.
(2) Thighten the two screws.
(3) Install the protective cover on the AC/DC Emergency power center 106VU.
(4) Thighten the five screws.
(5) Close the access door 822.
(6) Remove the access platform.