FDIMU CVDRS Software Load Procedure with the Portable Data Loader (PDL)
TASK 31-39-00-710-805-A
FDIMU CVDRS Software Load Procedure with the Portable Data Loader (PDL)
1. Reason for the Job
Upload of the software with the Portable Data Loader (PDL) (ALT45200001 or equivalent).
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 31-39-00-860-052-A ** ON A/C NOT FOR ALL
Subtask 31-39-00-710-055-A ** ON A/C NOT FOR ALL
Subtask 31-39-00-740-050-A ** ON A/C NOT FOR ALL Subtask 31-39-00-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 08:31:01 UTC
FDIMU CVDRS Software Load Procedure with the Portable Data Loader (PDL)
1. Reason for the Job
Upload of the software with the Portable Data Loader (PDL) (ALT45200001 or equivalent).
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | LOADER - DATA, PORTABLE |
| ALT45200001 | 1 | PORTABLE DATA LOADER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-36-00-740-012-A | Test of the Flight Data Interface and Management Unit (FDIMU) |
Subtask 31-39-00-860-052-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the aircraft is in ground configuration (landing gear compressed and all engines stopped).
(3) Make sure that all software disks are in non-writeprotected status (writeprotection OFF).
Subtask 31-39-00-865-057-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the aircraft is in ground configuration (landing gear compressed and all engines stopped).
(3) Make sure that all software disks are in non-writeprotected status (writeprotection OFF).
NOTE: There can be more than one software disk.
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 31-39-00-480-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | RCDR1 CVR&FDR | 40TU | E14 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | CFDS/CFDIU/SPLY | 2TW | J18 |
| 121VU | CFDS/CFDIU/BACK/UP | 8TW | J17 |
| 121VU | DLSU &/DLRB/SPLY | 5TD | J15 |
| 121VU | PDL/PWR/SPLY | 14TD | K19 |
| 121VU | RCDR/ACCLRM | 9TU | K18 |
| 121VU | RCDR2 CVR&FDR | 42TU | K16 |
| 121VU | AIDS & RCDR/FDIMU | 5TV | K15 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | PDL/PWR/SPLY | 14TD | J45 |
| 121VU | CFDS/CFDIU/SPLY | 2TW | J41 |
| 121VU | CFDS/CFDIU/BACK/UP | 8TW | J40 |
| 121VU | DLSU &/DLRB/SPLY | 5TD | J38 |
| 121VU | RCDR/ACCLRM | 9TU | K41 |
| 121VU | RCDR2 CVR&FDR | 42TU | K39 |
| 121VU | AIDS & RCDR/FDIMU | 5TV | K38 |
C. Installation of the PDL
(1) On the overhead panel, on DATA LOADING panel 52VU:
(a) Loosen the two middle quick-release fasteners of the access cover and remove it.
(b) Connect the cable to the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE and to the SYSTEMS data loader connector (2TD).
Subtask 31-39-00-860-053-A ** ON A/C NOT FOR ALL (1) On the overhead panel, on DATA LOADING panel 52VU:
(a) Loosen the two middle quick-release fasteners of the access cover and remove it.
(b) Connect the cable to the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE and to the SYSTEMS data loader connector (2TD).
D. Start the PDL
(1) Start the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE (refer to the PDL user guide).
4. Procedure(1) Start the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE (refer to the PDL user guide).
Subtask 31-39-00-710-055-A ** ON A/C NOT FOR ALL
A. FDIMU CVDRS Software Load Procedure with the PDL
Subtask 31-39-00-860-054-A ** ON A/C NOT FOR ALL NOTE: If the PDL has the digital signature check, the PDL can trigger two messages:
- When the software has no signature (refer to the PDL user guide), this message has no effect on the A/C software upload and you can ignore it
- When the signature is incorrect or corrupted (refer to the PDL user guide), the software upload is not possible and it is necessary to use other software.
| ACTION | RESULT |
|---|---|
| On the overhead panel, on the Data Loading Selector (DLS): | On the DLS display: |
| |
|
|
|
|
On the PDL:
| |
| On the DLS panel: | On the DLS display: |
|
|
| |
B. Stop the PDL
(1) Stop the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE (refer to the PDL user guide).
Subtask 31-39-00-080-050-A ** ON A/C NOT FOR ALL (1) Stop the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE (refer to the PDL user guide).
C. Removal of the Portable Data Loader
(1) On the overhead panel, on DATA LOADING panel 52VU:
(a) Disconnect the cable from the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE and from the SYSTEMS data loader connector (2TD).
(b) Install the access cover and tighten the two middle quick-release fasteners.
5. Close-up(1) On the overhead panel, on DATA LOADING panel 52VU:
(a) Disconnect the cable from the ALT45200001 PORTABLE DATA LOADER or the LOADER - DATA, PORTABLE and from the SYSTEMS data loader connector (2TD).
(b) Install the access cover and tighten the two middle quick-release fasteners.
Subtask 31-39-00-740-050-A ** ON A/C NOT FOR ALL Subtask 31-39-00-410-051-A ** ON A/C NOT FOR ALL
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
Subtask 31-39-00-862-054-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.