Installation of the System Pressure Switch


TASK 29-32-12-400-003-A
Installation of the System Pressure Switch


WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
FIN: 3151GN
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
CONTAINER - HYDRAULIC FLUID RESISTANT
No specific
2
WARNING NOTICE(S)
No specific
Torque wrench: range to between 3.470 and 3.186 m.daN (25.59 and 23.50 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
(Material No.14QFB1)
Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
196BB
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
3
O-RING
AIPC 29-32-03-03-070
3
O-RING
AIPC 29-32-83-03-100
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-10-00-863-002-A
Pressurize the Yellow Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-864-002-A
Depressurize the Yellow Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-14-00-614-002-A
Pressurization of the Hydraulic Reservoirs through the Ground Connector
TASK 29-14-00-614-002-A-01
Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU)
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-860-002-A
Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-32-00-710-003-A
Operational Test of the System Pressure Switch , Pressure Transducer and the associated Indicating System of the Yellow Hydraulic System
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
3. Job Set-up
Subtask 29-32-12-860-058-A
A. Aircraft Maintenance Configuration
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Make sure that the Yellow hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
   (3) Make sure that the reservoir of the Yellow hydraulic system is depressurized.
(Ref. AMM TASK 29-14-00-614-001).
   (4) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Yellow hydraulic system:
  • In the cockpit on the hydraulic section 40VU of the overhead panel,
  • On the ground service panel of the Yellow hydraulic system.
   (5) Make sure that one main door of the main gear is open (Ref. AMM TASK 32-12-00-010-001).
   (6) Make sure that the access panel 196BB is open.
   (7) Make sure that the isolation coupling of the Power Transfer Unit (PTU) is disconnected (Ref. AMM TASK 29-23-00-860-001).
   (8) Make sure that the CONTAINER - HYDRAULIC FLUID RESISTANT is in position below the location of the system pressure switch.
Subtask 29-32-12-865-058-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
4. Procedure
Subtask 29-32-12-420-054-B
A. Installation of the Pressure Switch
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the blanking plugs from the ports of the manifold.
   (4) Lubricate the new AIPC 29-32-03-03-070 O-RING (3) or AIPC 29-32-83-03-100 O-RING (3) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
   (5) Put the new O-ring (3) in position on the system pressure switch (2).
   (6) Install the system pressure switch (2) in the manifold (4) and TORQUE to between 3.470 and 3.186 m.daN (25.59 and 23.50 lbf.ft ) T.
WARNING: USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
   (7) Safety the system pressure switch (2) with 14QFB1Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -.
   (8) Install the clamp (9), the bonding jumper (7), the screw (8), the washer (6) and the nut (5) at the system pressure switch (2) (
Ref. AMM TASK 20-28-00-912-802).
   (9) Remove the blanking cap from the electrical connector (1).
   (10) Make sure that all the electrical connections are clean and in the correct condition.
   (11) Connect the electrical connector (1) to the system pressure switch (2).
Subtask 29-32-12-865-055-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
Subtask 29-32-12-790-052-A
C. Leak Test of the Hydraulic Connections
   (1) Pressurize the reservoir of the Yellow hydraulic system (Ref. AMM TASK 29-14-00-614-002).
   (2) Pressurize the Yellow hydraulic system (Ref. AMM TASK 29-10-00-863-002).
   (3) Examine the connection of the system pressure switch and make sure that there are no leaks.
   (4) Depressurize the Yellow hydraulic system (Ref. AMM TASK 29-10-00-864-002).
Subtask 29-32-12-710-052-A
D. Do the operational test of the hydraulic pressure indicating system (Ref. AMM TASK 29-32-00-710-003).
5. Close-up
Subtask 29-32-12-860-053-A
A. Put the aircraft back to the serviceable condition.
   (1) Remove the container.
   (2) Connect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-002).
   (3) Remove the WARNING NOTICE(S).
Subtask 29-32-12-410-052-A
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the main door of the main gear (Ref. AMM TASK 32-12-00-410-001).
   (3) Close the access panel 196BB.