Installation of the Engine-Pump Pressure Switch
TASK 29-13-17-400-802-A
Installation of the Engine-Pump Pressure Switch
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 29-13-17-860-061-A ** ON A/C NOT FOR ALL
Subtask 29-13-17-420-056-A ** ON A/C NOT FOR ALL
Subtask 29-13-17-020-059-A ** ON A/C NOT FOR ALL Subtask 29-13-17-410-054-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 08:04:38 UTC
Installation of the Engine-Pump Pressure Switch
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING:
DO NOT TOUCH THE HYDRAULIC SYSTEM COMPONENTS FOR A SHORT TIME AFTER THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS STAY HOT FOR SOME TIME AND CAN CAUSE INJURY.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | 1 | CONTAINER 20L (5 USGAL) |
| No specific | 1 | PLIERS - JAWED, SOFT |
| No specific | AR | WARNING NOTICE(S) |
| No specific | 1 | WRENCH - CROWFOOT |
| No specific | Torque wrench: range to between 124.3 and 101.7 m.N (91.67 and 75.00 lbf.ft ) ![]() | |
| 98D27803000000 | 1 | LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 480 | ENGINE 2 AFT PYLON |
| 195BB, 198CB |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 3 | PACKING | AIPC 29-11-17-50-030 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 27-00-00-080-002-A | Removal of the Flap/Slat Control-Lever Locking Tool (98D27803000000) |
| TASK 27-00-00-480-002-A | Installation of the Flap/Slat Control-Lever Locking Tool (98D27803000000) |
| TASK 27-50-00-866-009-A | Retraction of the Flaps on the Ground |
| TASK 27-50-00-866-009-A-01 | Retraction of the Flaps/Slats on the Ground |
| TASK 29-10-00-864-002-A | Depressurize the Yellow Hydraulic System |
| TASK 29-13-00-710-002-A | Operational Test of the Yellow Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 54-54-00-000-802-A | Removal of the Rear Pylon Fairing (RPF) |
| TASK 54-54-00-400-802-A | Installation of the Rear Pylon Fairing (RPF) |
| TASK 71-00-00-860-833-A | Procedure to Prevent Engine Motoring |
Subtask 29-13-17-860-061-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the Yellow hydraulic system is depressurized.
(Ref. AMM TASK 29-10-00-864-002)
(2) Make sure that the reservoir of the Yellow hydraulic system is depressurized.
(Ref. AMM TASK 29-14-00-614-001)
(3) Make sure that the flaps are in the fully retracted position (Ref. AMM TASK 27-50-00-866-009).
Subtask 29-13-17-941-059-A ** ON A/C NOT FOR ALL (1) Make sure that the Yellow hydraulic system is depressurized.
(Ref. AMM TASK 29-10-00-864-002)
(2) Make sure that the reservoir of the Yellow hydraulic system is depressurized.
(Ref. AMM TASK 29-14-00-614-001)
(3) Make sure that the flaps are in the fully retracted position (Ref. AMM TASK 27-50-00-866-009).
B. Safety Precautions
(1) On AIR COND panel 30VU:
(4) Make sure that you did the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
(5) On FLAPS panel 114VU:
Subtask 29-13-17-865-063-A ** ON A/C NOT FOR ALL (1) On AIR COND panel 30VU:
- Make sure that the APU BLEED pushbutton switch is released (ON legend off).
- Make sure that a WARNING NOTICE(S) is in position to tell persons not to operate this pushbutton switch.
- On the HYD section of panel 40VU
- On the ground service panel of the Yellow hydraulic system.
(4) Make sure that you did the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
(5) On FLAPS panel 114VU:
- Make sure that the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION is in position on the flap/slat control lever (Ref. AMM TASK 27-00-00-480-002).
- Make sure that a WARNING NOTICE(S) is in position on the flap/slat control lever to tell persons not to operate the flap/slat controls.
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 29-13-17-020-058-A ** ON A/C NOT FOR ALL Subtask 29-13-17-010-055-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/Y HYD/PUMP ENG2 ALT | 3710GD | H02 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/Y HYD/PUMP ENG2 ALT | 3710GD | E12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/MONG | 3700GD | Q37 |
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/CTL | 3701GD | Q36 |
E. Get Access
(1) Make sure that an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at the rear pylon.
Subtask 29-13-17-941-060-A ** ON A/C NOT FOR ALL (1) Make sure that an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at the rear pylon.
F. Preparation for Installation
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Do an inspection of the component interfaces and the adjacent area.
4. Procedure(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Do an inspection of the component interfaces and the adjacent area.
Subtask 29-13-17-420-056-A ** ON A/C NOT FOR ALL
A. Installation of the Engine-Pump Pressure Switch
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the CONTAINER 20L (5 USGAL) is in position below the pressure switch (2).
(4) Remove the CAP - BLANKING from the pressure switch (2) and from the pressure-switch port of the manifold (4).
(5) Apply the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) on the new AIPC 29-11-17-50-030 PACKING (3) and to the threads of the pressure switch (2).
(6) Install the new packing (3) on the pressure switch (2).
(7) Install the pressure switch (2) on the manifold (4).
(8) At the pressure-switch port of the manifold (4), install the WRENCH - CROWFOOT on the flats to hold the manifold (4).
(9) TORQUE the pressure switch (2) to between 124.3 and 101.7 m.N (91.67 and 75.00 lbf.ft )
.
(10) Remove the CAP - BLANKING from the electrical connector (1).
(11) Connect the electrical connector (1) to the pressure switch (2) and tighten it with PLIERS - JAWED, SOFT.
Subtask 29-13-17-420-056-B ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the CONTAINER 20L (5 USGAL) is in position below the pressure switch (2).
(4) Remove the CAP - BLANKING from the pressure switch (2) and from the pressure-switch port of the manifold (4).
(5) Apply the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) on the new AIPC 29-11-17-50-030 PACKING (3) and to the threads of the pressure switch (2).
(6) Install the new packing (3) on the pressure switch (2).
(7) Install the pressure switch (2) on the manifold (4).
(8) At the pressure-switch port of the manifold (4), install the WRENCH - CROWFOOT on the flats to hold the manifold (4).
(9) TORQUE the pressure switch (2) to between 124.3 and 101.7 m.N (91.67 and 75.00 lbf.ft )
.(10) Remove the CAP - BLANKING from the electrical connector (1).
(11) Connect the electrical connector (1) to the pressure switch (2) and tighten it with PLIERS - JAWED, SOFT.
A. Installation of the Engine-Pump Pressure Switch
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the CONTAINER 20L (5 USGAL) is in position below the pressure switch (2).
(4) Remove the CAP - BLANKING from the pressure switch (2) and from the pressure-switch port of the manifold (4).
(6) Install the new packing (3) on the pressure switch (2).
(7) Install the pressure switch (2) on the manifold (4).
(8) At the pressure-switch port of the manifold (4), install the WRENCH - CROWFOOT on the flats to hold the manifold (4).
(9) TORQUE the pressure switch (2) to between 124.3 and 101.7 m.N (91.67 and 75.00 lbf.ft )
.
(10) Remove the CAP - BLANKING from the electrical connector (1).
(11) Connect the electrical connector (1) to the pressure switch (2) and tighten it with PLIERS - JAWED, SOFT.
Subtask 29-13-17-865-064-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the CONTAINER 20L (5 USGAL) is in position below the pressure switch (2).
(4) Remove the CAP - BLANKING from the pressure switch (2) and from the pressure-switch port of the manifold (4).
CAUTION:
DO NOT USE HIGH-DENSITY FLUID SKYDROL 500B-4 FOR A320NEO FAMILY. THE FLUID CAN CAUSE DAMAGE TO THE HYDRAULIC SYSTEM COMPONENTS.
(5) Apply the Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) on the new AIPC 29-11-17-50-030 PACKING (3) and on the threads of the pressure switch (2).(6) Install the new packing (3) on the pressure switch (2).
(7) Install the pressure switch (2) on the manifold (4).
(8) At the pressure-switch port of the manifold (4), install the WRENCH - CROWFOOT on the flats to hold the manifold (4).
(9) TORQUE the pressure switch (2) to between 124.3 and 101.7 m.N (91.67 and 75.00 lbf.ft )
.(10) Remove the CAP - BLANKING from the electrical connector (1).
(11) Connect the electrical connector (1) to the pressure switch (2) and tighten it with PLIERS - JAWED, SOFT.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 29-13-17-710-054-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/Y HYD/PUMP ENG2 ALT | 3710GD | H02 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/Y HYD/PUMP ENG2 ALT | 3710GD | E12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/MONG | 3700GD | Q37 |
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/CTL | 3701GD | Q36 |
C. Operational Test
(1) Do the operational test of the Yellow hydraulic system (Ref. AMM TASK 29-13-00-710-002).
(2) After the dry-motoring, make sure that there were no leaks from the pressure switch (2).
(3) Make sure that the level of the hydraulic fluid in the Yellow reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
5. Close-up(1) Do the operational test of the Yellow hydraulic system (Ref. AMM TASK 29-13-00-710-002).
(2) After the dry-motoring, make sure that there were no leaks from the pressure switch (2).
(3) Make sure that the level of the hydraulic fluid in the Yellow reservoir is correct. If necessary, fill the reservoir (Ref. AMM TASK 12-12-29-611-001).
Subtask 29-13-17-020-059-A ** ON A/C NOT FOR ALL Subtask 29-13-17-410-054-A ** ON A/C NOT FOR ALL
B. Close Access
(1) Close access doors 198CB and 195BB.
(2) Remove the container.
(3) Remove the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the flap/slat control lever (Ref. AMM TASK 27-00-00-080-002).
(4) Make sure that the work area is clean and clear of tools and other items.
(5) Remove the WARNING NOTICE(S).
(6) Remove the access platform(s).
(1) Close access doors 198CB and 195BB.
(2) Remove the container.
(3) Remove the 98D27803000000 LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the flap/slat control lever (Ref. AMM TASK 27-00-00-080-002).
(4) Make sure that the work area is clean and clear of tools and other items.
(5) Remove the WARNING NOTICE(S).
(6) Remove the access platform(s).
Engine-Pump Pressure Switch