Installation of the Accumulator-Air Pressure Gage


TASK 29-12-21-400-001-A
Installation of the Accumulator-Air Pressure Gage


FIN: 2072GM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
2
WARNING NOTICE(S)
No specific
Torque wrench: range to between 1.65 and 1.54 m.daN (12.17 and 11.36 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
(Material No.14CCB6)
Testing Medium-Leak Detection - Oxygen System
No specific
lockwire 0.8 mm (0.032 in.)
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
195BB
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 12-14-29-614-001-A
Fill the Hydraulic Power Accumulators with Nitrogen
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-10-00-863-003-A
Pressurize the Blue Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-863-003-A-01
Pressurize the Blue Hydraulic System with the Blue Electric Pump
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-14-00-614-002-A
Pressurization of the Hydraulic Reservoirs through the Ground Connector
TASK 29-14-00-614-002-A-01
Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU)
3. Job Set-up
Subtask 29-12-21-860-052-A
A. Aircraft Maintenance Configuration
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Blue hydraulic system:
  • in the cockpit on the hydraulic section 40VU of the overhead panel,
  • on the ground service panel of the Blue hydraulic system.
   (3) Make sure that the Blue hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001).
   (4) Make sure that the reservoir of the Blue hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
   (5) Make sure that the access door 195BB is open .
Subtask 29-12-21-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
121VUHYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST1881GPN35
123VUB HYD/ELEC PUMP2701GJAB09
4. Procedure
Subtask 29-12-21-420-050-A
A. Installation of the Pressure Gage
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Remove the blanking plugs from the pressure gage (1) and the adapter (3).
   (4) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the threads of the pressure gage connection.
   (5) Install the pressure gage (1) on the adapter (3).
NOTE: Make sure that you can clearly read the pressure gage when it is installed.
   (6) TORQUE the nut (2) to between 1.65 and 1.54 m.daN (12.17 and 11.36 lbf.ft ) T.
   (7) Safety the nut (2) with lockwire 0.8 mm (0.032 in.).
Subtask 29-12-21-860-053-A
B. Preparation for Test
   (1) Fill the accumulator with nitrogen (
Ref. AMM TASK 12-14-29-614-001).
   (2) Remove the warning notices from the cockpit and the ground service panel.
   (3) Pressurize the reservoir of the Blue hydraulic system (Ref. AMM TASK 29-14-00-614-002).
   (4) Make sure that the fluid level in the reservoir of the Blue hydraulic system is correct. Add fluid as necessary (Ref. AMM TASK 12-12-29-611-001).
   (5) Pressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-863-003).
Subtask 29-12-21-790-050-A
C. Test
   (1) Apply Testing Medium-Leak Detection - Oxygen System (Material No.14CCB6) to the connection of the pressure gage (1) and the adapter (3) and make sure that there are no leaks.
   (2) Make sure that the pressure gage (1) shows 3000 +100 -100 psi.
5. Close-up
Subtask 29-12-21-410-050-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 195BB.
Subtask 29-12-21-865-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
121VUHYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST1881GPN35
123VUB HYD/ELEC PUMP2701GJAB09