Installation of the Flight Control Pressure Switch


TASK 27-92-17-400-001-A
Installation of the Flight Control Pressure Switch


WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING: MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
FIN: 10CE2
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
CONTAINER - HYDRAULIC FLUID RESISTANT
No specific
1
WARNING NOTICE(S)
No specific
Torque wrench: range to between 3.470 and 3.186 m.daN (25.59 and 23.50 lbf.ft ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.02ABA1)
Phosphate Ester Hydraulic Fluid-General Power - -
No specific
lockwire, corrosion-resistant steel, 0.8 mm (0.032 in.)
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
3
PACKING
AIPC 27-92-03-01-020
3
PACKING
AIPC 27-92-83-01-040
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 27-96-00-710-011-A
Operational Test after Removal/Installation of the Pressure Switches
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-10-00-863-001-A
Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 29-14-00-614-002-A
Pressurization of the Hydraulic Reservoirs through the Ground Connector
TASK 29-14-00-614-002-A-01
Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU)
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-860-002-A
Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-863-001-A
Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump
TASK 29-23-00-864-001-A
Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
3. Job Set-up
Subtask 27-92-17-860-055-A
A. Aircraft Maintenance Configuration
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Make sure that one door of the main gear is open (Ref. AMM TASK 32-12-00-010-001).
   (3) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-10-00-864-001).
   (4) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
   (5) Make sure that the isolation coupling of the Power Transfer Unit (PTU) is disconnected (Ref. AMM TASK 29-23-00-860-001).
   (6) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Green hydraulic system:
  • In the cockpit on the hydraulic section 40VU of the overhead panel.
  • On the ground service panel of the Green hydraulic system.
   (7) Make sure that the CONTAINER - HYDRAULIC FLUID RESISTANT is in position below the flight control pressure switch to collect hydraulic fluid.
Subtask 27-92-17-865-056-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B03
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
4. Procedure
Subtask 27-92-17-420-050-A
A. Installation of the Flight Control Pressure Switch 10CE2
   (1) Lubricate the new AIPC 27-92-03-01-020 PACKING (3) or AIPC 27-92-83-01-040 PACKING (3) with Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) .
   (2) Remove the blanking plugs from the ports of the manifold.
   (3) Put the new packing (3) in position on the flight control pressure switch (2).
   (4) Install the flight control pressure switch (2) in the manifold (4) and TORQUE it to between 3.470 and 3.186 m.daN (25.59 and 23.50 lbf.ft ) T.
   (5) Safety the flight control pressure switch (2) with lockwire, corrosion-resistant steel, 0.8 mm (0.032 in.).
   (6) Install the clamp (9), the bonding strap (7), the screw (8), the washer (6) and the nut (5) at the flight control pressure switch (2) (
Ref. AMM TASK 20-28-00-912-802).
   (7) Remove the blanking cap from the electrical connector (1).
   (8) Connect the electrical connector (1).
Subtask 27-92-17-865-053-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B03
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
Subtask 27-92-17-710-050-A
C. Test
   (1) Pressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-002).
   (2) Pressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001).
   (3) Do a test of the pressure switch 10CE2 (Ref. AMM TASK 27-96-00-710-011).
   (4) Examine the connection of the flight control pressure switch and make sure that there are no leaks.
5. Close-up
Subtask 27-92-17-864-051-A
A. Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001) or (Ref. AMM TASK 29-23-00-864-001).
Subtask 27-92-17-410-050-A
B. Close Access
   (1) Remove the container.
   (2) Connect the isolation coupling of the Power Transfer Unit (PTU) (Ref. AMM TASK 29-23-00-860-002).
   (3) Remove the WARNING NOTICE(S).
   (4) Make sure that the work area is clean and clear of tools and other items.
   (5) Close the main door of the main gear (Ref. AMM TASK 32-12-00-410-001).