W DOC AIRBUS | AMM A320F

Installation af the Static Inverter - Razor Supply


TASK 25-44-41-400-001-A
Installation af the Static Inverter - Razor Supply


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
261CC
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-23-42-000-002-A
Removal of the Ceiling Panels - Aft Utility Area
TASK 25-23-42-400-002-A
Installation of the Ceiling Panels - Aft Utility Area
TASK 25-44-00-710-001-A
Operational Test of the Razor Supply System
F Static Inverter - Razor Supply ** ON A/C NOT FOR ALL
F Mini Inverter - Razor Supply ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 25-44-41-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
   (2) Make sure that the ceiling panel 261CC is removed (Ref. AMM TASK 25-23-42-000-002).
Subtask 25-44-41-860-050-B ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-44-41-865-060-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
2000VULIGHT-LAV1LQJ01
** ON A/C NOT FOR ALL
2001VULAV SHAVER SOCKET1MTB01
4. Procedure
Subtask 25-44-41-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Static Inverter 2MT
F Static Inverter - Razor Supply ** ON A/C NOT FOR ALL
   (1) Put the static inverter (3) in position and install the washers (1) and the screws (2) (Ref. AMM TASK 20-28-00-912-802).
   (2) TORQUE the screws (2) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in ) T.
   (3) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (4) Make sure that all the electrical connections are clean and in the correct condition.
   (5) Connect the electrical connector (4)
Subtask 25-44-41-420-050-B ** ON A/C NOT FOR ALL Subtask 25-44-41-865-061-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
2000VULIGHT-LAV1LQJ01
** ON A/C NOT FOR ALL
2001VULAV SHAVER SOCKET1MTB01
Subtask 25-44-41-865-058-A
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
2000VULIGHT-LAV1LQJ01
Subtask 25-44-41-710-050-A
5. Close-up
Subtask 25-44-41-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the ceiling panel 261CC (Ref. AMM TASK 25-23-42-400-002)
Subtask 25-44-41-862-050-A
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001)
[Rev.10 from 2021] 2026.03.31 23:35:37 UTC